Analysis of Business Implementation Strategy and Construction Management Techniques in Spearheading Overseas Expansion

  • Park, Kyungrog;Yi, June-Seong
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.472-476
    • /
    • 2015
  • The purpose of this study is to fully understand the present state of the domestic construction companies, and to analyze phased business types and construction management techniques in order to initiate overseas expansion. Because of the recession in the domestic construction market, a thorough and strategic perspective to constantly develop inroads into overseas market is required. So we carried out a questionnaire survey targeting the experts of the overseas construction and researcher, and consulted them in depth. The questionnaire survey was divided into three sections. The first section is the necessity of overseas construction and the reason. The second is the overseas business types classified into the way of advance in short-term and long-term phase possibility of expansion. Lastly, the importance of the phased construction management techniques and the current capacity of the domestic and the foreign business trends were scrutinized. On the basis of the consultation and surveys, we analyzed the overseas business types and the construction management types in the short-term and long-term phase.

  • PDF

Essence Applicability Matrices for the Reduction of Project Cycle Time

  • Hong, Tae Hoon;Son, Jae Ho
    • Architectural research
    • /
    • 제8권1호
    • /
    • pp.57-68
    • /
    • 2006
  • Global competition and reduced project life cycle ultimately puts greater performance requirements on the capital project delivery systems used to maintain competitiveness. Despite continuing improvements in delivery cycle time, business owners of facilities continue to demand greater improvements in project delivery cycle time. Therefore, it is very important to investigate the various techniques and methods leading to reduction in project cycle time and also identify the applicability of identified techniques and methods. This paper introduces reduction techniques identified through literature review (i.e, Schedule Reduction Techniques (SRTs), Management Techniques (MTs), and Construction Institute Industry (CII) Best Practices (BPs). In order to collect applicability of these techniques under different project phases (Pre-project planning (PPP), Design (D), Material Management (MM), Construction (C), and Start-up (SU)), the Essence Applicability Matrices (EAM) is used.

NEW INTELLIGENT APPROACH FOR PROJECT MANAGEMENT IN CONSTRUCTION INDUSTRY

  • D. Aparna;D. Sridhar;J. Rajani;B. Sravani;V.S.S. Kumar
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.366-370
    • /
    • 2005
  • The construction environment is dynamic in nature and is characterized by various degrees of uncertainties. The uncertainties such as lack of coordination, non availability of resources, condition of temporary structures and varying weather conditions have a significant impact on estimating the duration of activities. These are subjective, vague and imprecisely defined and are expressed in subjective measures rather than mathematical terms. Conventionally, various quantitative techniques such as CPM and PERT have emerged in construction industry. These techniques cannot solve the above problems and rely on human experts which may not always be possible. In such situations Artificial Intelligence tools such as fuzzy sets and neural networks handle such variables and provide global strategies. The present paper evaluates the effect of qualitative factors to identify the activity duration using new intelligent approach. The results are compared with conventional methods for effective project management. A case study is considered to demonstrate the applicability of fuzzy logic for project scheduling.

  • PDF

NEW TREND OF SCHEDULING IN LINEAR CONSTRUCTION PROJECT

  • S. Sankar;J. Senthil
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.917-923
    • /
    • 2005
  • Scheduling is one of the main functions in construction project to determine the sequence of activities necessary to complete a project. The scheduling techniques provide important information crucial to a project's success. Highway construction project the paving activity can be considered a linear activity. Linear scheduling technique may be better suited for linear projects than other scheduling techniques. A new type of scheduling in linear project is calling Linear Scheduling Model (LSM). The Project monitoring and controlling is very ease to identify that all the stage of linear project and have more advantages.

  • PDF

고층건물 적용을 위한 시공자동화시스템 요소기술의 중점 관리사항 도출 (Critical Management Factor of Elemental Techniques for Construction Automation System in High-Rise Building)

  • 조남석;김창원;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.15-16
    • /
    • 2011
  • Construction automation and robotics are being taken notice as an alternative to improve productivity and quality. Reflecting on these purpose, automation system, called RCA(Robotic-crane based Construction Automation) system, is developed and have been verified through a pilot project recently in Korea. To apply the RCA system in high-rise building effectively, each management factors of element technologies in the system is derived and assessed critical factor. The purpose of this study, management factors of element techniques, consisted of RCA system, is classified through questionnaires/interviews targeting system developers and construction managers in pilot project site, and critical factors is selected using AHP.

  • PDF

LEAN CONSTRUCTION MANAGEMENT OF BPIMT(BUILDIN-CONSTRUCTION PROCESS INNOVATION MANAGEMENT TOOLS & TECHNIQUES) THAT BASED VSM &TACT

  • Sang-Hyuk Lee;Chul-Woo Lim;Chang-duk Kim;Sang-Wook Suh;Yoon-Ki Choi;Jae-Youl Chun;Jung-Ho Yu
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1089-1093
    • /
    • 2005
  • Proving the effect of lean construction has yet to be done for its staying poor basic building though there has been efforts and wants to introduce the theory and concept of lean construction in practical site. Therefore, we need to specify the methods of productivity improvement and construction process through various adaptations in the site. Also, to apply such improvement methods systematically, we need active participation of owners, contractors and supply chain members in relation to construction industry and are also require appropriate methods to adapt. At first, this study thinks over the techniques of lean construction that has been verified through studies carried before. For second, it selects the technique of lean construction with the practicality in the construction site. For third, it is aimed to make a manual of lean process management by the use of TACT and V.S.M. For fifth, it will show the method of management for repeated activity and develop a guide-line and procedure that applies the concept of work sequence and resource equalization to each phase of process management. At last, it will show methods of reflecting V.S.M. to improve and grasp the waste factor from the step of managing an activity process and develop the form to analyze the waste in construction site by mapping the value flow.

  • PDF

건설공사의 적정 Lot Size 결정에 의한 효율적인 재고관리 방안에 관한 연구 (A Study on the Effective Inventory Management by Optimizing Lot Size in Building Construction)

  • 김상훈;김광희;강경인
    • 한국건축시공학회지
    • /
    • 제4권2호
    • /
    • pp.73-80
    • /
    • 2004
  • The purpose of this study was to look up the proper inventory management system in construction industry. it is important for construction company to improve competitiveness and to reduce construction cost. Lot-sizing techniques were applied to rebar procurement in apartment project. The results of this study were as follows; the method of Groff's marginal cost showed the best performance of other techniques and the method of Norman showed a similar result.

Construction Cost Forensics: How Best To Protect Your Company And Avoid Costly Problems

  • Opfer, Neil
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1240-1240
    • /
    • 2022
  • Construction projects are fraught with risks from cost or other overruns to accidents along with other issues. This is true whether the relevant organization is an owner, general contractor, CM, specialty-trade contractor, or other entity. When cost issues or other issues confront arise, how should an organization proceed whether attempting to gain additional compensation in terms of cost/other damages or protecting the same against such claims if they do not appear to be warranted? Enter construction cost forensics. This presentation will focus on strategies/techniques with construction cost forensics in these areas in order to be successful. Covered techniques include those to develop and analyze claims including fundamental construction cost analysis techniques. When an unexpected event disrupts a construction project, using sound analytical methods to identify the cause and quantify the extent of the issue will be important for negotiating a fair result or for obtaining a successful outcome in arbitration or litigation. Key examples of uncovering issues via construction cost forensics will be covered in this presentation.

  • PDF