• 제목/요약/키워드: construction labor productivity

검색결과 177건 처리시간 0.031초

웨어러블 장비를 이용한 건설 근로자 근골격계 부하 측정방안 제시 (Development of Measurement Method of Musculoskeletal Load for Construction Workers using Wearable Motion Recognition Sensor)

  • 표기윤;이동민;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.123-124
    • /
    • 2019
  • In the labor-intensive construction site, potential threats of the musculoskeletal diseases mainly caused by various repetitive physical tasks, vulnerable environment, and the aging of the labor worker exist. However, quantitative measuring method of construction labor worker's work posture has not been improved yet. This study proposed musculoskeletal measuring method by using wearable motion recognition sensor for quantitative evaluation and analysis of working posture of construction workers. This method is expected to be used as a basic data for posture analysis and prevention construction safety accidents, as well as physical workload and labor productivity analysis by labor work type.

  • PDF

건설기능인력의 업무환경 및 생산성 분석을 통한 기능인력의 효율적인 관리방안에 관한 연구 (A Study on the Effective Management Methods of Craftsmen through Job Environment and Productivity Analysis of Construction Craft Workers)

  • 하기주;하민수;이동렬
    • 대한건축학회논문집:구조계
    • /
    • 제35권12호
    • /
    • pp.173-180
    • /
    • 2019
  • Construction work is a labor-intensive industry, which is required systematic production activities using materials, manpower, and equipment. Among them, manpower resources play a very important role in achieving efficiently production in the organization. Construction work is highly dependent on construction craft workers, and the level of proficiency can be directly related to the construction productivity and quality. However, a rapidly aging construction craft workers in Korea, is being replaced by a foreign construction craft workers because of advoidance of new laborers in the construction site. In the future, if the continuous development and management of construction manpower is not made properly, it may be lead to adverse effects such as setbacks in production, delayed completion, faulty construction, industrial disasters, and decreased productivity in construction site. In this study, it was proposed four important factors for work capacity management of construction craft workers. These were ensuring of physical strength through the health management of construction craft workers, securing of proficiency through career management, ensuring of productivity through work capacity and establing of informatization through work capacity management. By introducing a systematic system, it is possible to improve construction craft workers' professionalism, enhancing the level of welfare, reflecting the realities of labor costs, increasing the quantitative and qualitative levels of construction craft workers, Futhermore it was demanded the continued interest and policy support for the realization of effective management of construction craft workers.

건설기능인력 수급 불균형 문제 해결의 대안 제시 (Using Next Generation Technologies to Resolve Construction Labor Shortage Problems)

  • 이복남;우성권;장철기;구본상
    • 대한토목학회논문집
    • /
    • 제26권6D호
    • /
    • pp.969-974
    • /
    • 2006
  • 국내 건설현장 기능 인력 부족 문제가 심각하다. 현재 국내 건설현장은 신규 인력 진입 저조에 따른 공급 부족과 기능 인력의 고령화에 따른 생산성 저하 등 양적, 질적인 문제를 동시에 겪고 있다. 여기에 현재 계획되고 있는 대규모 국가사업으로 향후 건설현장 기능 인력의 부족은 더욱 심각해질 전망이다. 건설현장 기능인력 수급 불균형 문제에 대한 해결방안으로서의 공급 확보 정책은 시대의 흐름과 기술 발전에 따른 미래 전망을 고려해볼 때, 어느 정도 한계가 있다고 판단되며, 기술적 접근을 통해 기능 인력에 대한 수요를 줄이는 노력이 병행되어야 한다고 판단된다. 기술 발전을 통한 기능인력 수요 감소를 위해서는 현장에서 수행되는 작업 프로세스의 생산성과 효율성을 향상시킬 수 있는 분야에 연구의 초점이 맞춰져야 하며, 기능인력 수요 저감의 핵심이 되며 연구개발 노력이 필요한 분야로서 1) 건설 자동화 및 기계화 확대를 통한 기능 인력의 대체, 2) 고성능 건설 자재 개발 및 활용으로 현장 작업량 저감, 3) 정보화 기술 도입으로 현장 작업대기 시간 감축에 의한 생산성 향상, 4) 모듈화, 선조립, 공장제작 등 선작업 방식의 적용을 통한 현장 기능 인력 수요 저감 및 생산성 향상, 5) 재설계/재시공 예방으로 추가 작업 발생 방지, 6) 기능 및 직종 통합에 의한 다기능 인력 양성, 7) 시공 프로세스 개선에 의한 작업 생산성 향상 등의 7가지 주제를 제시하였다.

건설현장의 실투입 노무량 입력을 위한 디지털펜 시스템 (Digital Pen System for Inputting the Actual Amount of Labor Input at Construction Site)

  • 김대원;김태용;신윤석;김광희
    • 한국건축시공학회지
    • /
    • 제16권2호
    • /
    • pp.133-140
    • /
    • 2016
  • 건설공사에 있어 노무량은 건설공사비 산정을 위한 기준으로 사용되고 있고, 건설산업의 생산성을 파악하는 근거자료로도 활용되고 있다. 하지만 노무량의 기준이라고 하는 표준품셈과 실제투입 노무량과 큰 차이를 보이고 있어 이를 해결할 수 있는 방안이 필요하다. 따라서 본 연구에서는 실제투입 노무량을 좀 더 정확하고 간편하게 입력할 수 있는 시스템을 구축하기 위하여 전통적인 종이와 펜을 이용한 수기방식을 그대로 따르면서 전자문서화에 대한 이중부담이 없는 디지털펜을 이용하는 방안을 제시하고자 한다. 본 연구를 통해 실투입 작업정보를 단순히 저장하는 것뿐만 아니라 웹을 통한 공유 및 활용을 통해서 공사비 산정업무의 생산성 측면에서도 기여할 것으로 사료된다.

거푸집 공사의 생산성 분석을 통한 작업조 기반의 Cost Data Prototype 개발에 관한 연구 (Development of Cost Data Prototype based on Production Crew by Productivity Analysis of Form Work)

  • 강동완;지성민;현창택
    • 한국건설관리학회논문집
    • /
    • 제13권1호
    • /
    • pp.44-52
    • /
    • 2012
  • 합리적인 방법에 의해 결정된 건설 공사비를 포함하여 계약을 체결하는 것은 공공 건설공사의 사업비 관리 측면에서 매우 중요하다. 국내에서는 건설 공사비를 산정하는 기준으로 표준품셈이 사용되고 있지만, 표준품셈에서 제시하는 품의 적정성에 대해서 문제가 제기되고 있으며, 현장의 자원 투입량과 품셈에서 제시하는 자원 투입량의 차이로 합리적이고 효율적인 공사비를 산정하는데 어려움이 있다. 본 연구에서는 건설 공사비를 합리적으로 산정하기 위하여, 공동주택 거푸집 공사의 생산성 분석을 통한 작업조 기반의 Cost Data Prototype을 제시하였다. 특히, CYCLONE 모델은 민감도 분석을 통해 최적의 작업인원을 제시하는 모델이므로, 거푸집 공사의 다양한 작업공간과 작업인원을 대상으로 생산성을 분석할 수 있는 도구로 활용이 가능하다. 그리고 개발된 회귀식은 거푸집 공사의 작업인원을 독립변수로 하여, 필요한 작업량을 종속변수로 예측하는데 활용이 가능할 것이다.

공동주택 벽 철근 조립 생산성 향상 방안에 관한 연구 (Productivity Improvement Method of Wall Rebar Work in Apartment House Construction)

  • 김민규;김영길;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.159-160
    • /
    • 2019
  • Reinforced concrete construction is one of the labor intensive construction projects and its productivity is very low. It is necessary to increase the productivity of rebar construction for improving the productivity of construction work. Therefore, in this study, the rebar drawings of apartment buildings are analyzed to prefabricate wall rebar unit shaped mesh in the factory and installing it on site. If the proposed wall rebar unit is applied to apartment construction working time of wall rebar can be reduced by 50% or more.

  • PDF

설문조사를 통한 건설근로자의 현황분석 연구 (Questionnaire Study on the Current Status of the Construction Labor Force)

  • 김태균;김창한
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 2부
    • /
    • pp.95-97
    • /
    • 2010
  • Current trends in the Korean construction industry, including the aging of the workforce, a lack of new Korean construction workers, and an inflow of unskilled foreign labor, have caused a range of problems, including quality deterioration, reduced productivity, insufficient understanding of the function and difficulties in communication, to name a few. Yet while countermeasures to these problems should be based on accurate and diverse fundamental data, including the current status of demand and supply of domestic and foreign construction workers, the perception of construction workers, studies on these questions have, thus far, been scarce. For these reasons, this study was conducted using a questionnaire for managers and workers on construction sites, to secure fundamental data relating to construction workers. The findings of the survey showed that it is urgent to prepare measures to educate, train and foster human resources, considering the aging of the construction workforce and the lack of an inflow of new construction workers.

  • PDF

건설 프로젝트 생산성 평가를 위한 측정 기준 수립 (Establishment of Measurement Standards for Productivity Assessment in Construction Project)

  • 김준영;윤인석;정민혁;주선우;박성은;홍영민;조종우;박문서
    • 한국건설관리학회논문집
    • /
    • 제23권3호
    • /
    • pp.3-12
    • /
    • 2022
  • 일반적인 건설 프로젝트에서는 계획 수립에 표준품셈 등 작업 물량-투입 품의 비율을 생산성의 기준으로 활용한다. 이러한 방식의 생산성 기준은 표준화된 반복작업이 많은 프로젝트에서 실효성이 높으나, 복잡성이 높은 대규모 프로젝트의 표준적인 생산성 관리 기준으로 활용하기에는 한계가 있다. 이는 기존 프로젝트의 실적 데이터로부터 추출한 평균적 작업생산성보다는 당해 프로젝트의 생산성에 복합적으로 작용하는 다양한 작업중단 요인으로 인해 발생하는 비작업시간의 영향성이 크기 때문이다. 본 연구에서는 세부작업 프로세스에 작용하는 비작업요인의 영향성 산출을 통해 생산성을 평가하고 관리 포인트의 우선순위를 도출할 수 있는 생산성 측정 기준을 수립한다. 이를 위해 먼저 세부작업 프로세스와 유형별 비작업요인을 정의한 후, 이를 정량적으로 측정하기 위한 기법을 제안한다. 그리고 획득가능 생산성 개념을 활용하여 개선 가능한 생산성 향상의 정도와 각 비작업요인별 생산성 저하 영향도를 평가하는 방법론을 수립한다. 마지막으로 실제 현장에서 수집한 생산성 데이터를 토대로 사례분석을 수행하여 본 연구결과가 건설관리자에게 주요 생산성 관리 포인트에 대한 의사결정을 지원할 수 있음을 검증한다.

노동력 고령화가 노동 생산성에 미치는 영향 분석: 우리나라 지역별 패널통계 활용 (The impact of Workforce Aging on Labor Productivity: Using the Regional Panel Dataset in Korea)

  • 정용훈;이성훈
    • 디지털융복합연구
    • /
    • 제17권11호
    • /
    • pp.1-7
    • /
    • 2019
  • 본 연구는 1995년부터 2017년까지의 16개 지방자치단체 지역별 패널통계를 활용하여 노동력 고령화가 노동 생산성에 미치는 영향을 분석하였다. 지역별 고정효과와 다양한 조정변수들을 고려한 패널회귀분석 결과에서 총취업자 중 60세 이상의 취업자 비중으로 정의한 노동력 고령화는 노동 생산성에 매우 일관되고 유의한 음(-)의 효과를 주며, 부정적인 효과의 크기는 노동력 고령화가 1% 증가할 때마다 노동 생산성이 약 0.14 ~ 0.20% 감소하는 것으로 나타났다. 이밖에 조정변수로 고려된 1인당 자본스톡과 인적자본은 노동 생산성이 증가하는데 많은 기여를 하고, 경기변동의 대리변수인 실업률은 예상과 같이 노동 생산성에 유의한 음(-)의 효과를 미치며, 비록 유의하지는 않지만, 전체 산업 중 서비스업의 비중을 의미하는 산업구조의 계수가 양(+)의 값을 보이지만 유의하지 않은 것으로 확인되었다. 본 연구의 결과를 통해 노동력 고령화로 예상되는 노동 생산성의 감소를 억제하기 위해 인적자본을 유지 및 확충할 수 있는 경제 및 교육정책의 설계와 구축이 필요하다는 시사점을 도출할 수 있다.

Quantified Impact Analysis of Construction Delay Factors on Steel Staircase Systems

  • Kim, Hyun-Mi;Kim, Tae-Hyung;Shin, Young-Keun;Kim, Young-Suk;Han, Seungwoo
    • 한국건축시공학회지
    • /
    • 제12권6호
    • /
    • pp.636-647
    • /
    • 2012
  • Construction projects have become so large, complicated and incredibly high-tech that process management is currently considered one of the most important issues. Unlike typical manufacturing industries, most major construction activities are performed in the open air and thus are exposed to various environmental factors. Many studies have been conducted with the goal of establishing efficient techniques and tools for overcoming these limitations. Productivity analysis and prediction, one of the related research subjects, must be considered when evaluating approaches to reducing construction duration and costs. The aim of this research is to present a quantified impact analysis of construction delay factors on construction productivity of a steel staircase system, which has been widely applied to high rise building construction. It is also expected to improve the process by managing the factors, ultimately achieving an improvement in construction productivity. To achieve the research objectives, this paper analyzed different delay factors affecting construction duration by means of multiple regression analysis focusing on steel staircase systems, which have critical effects on the preceding and subsequent processes in structure construction. Statistical analysis on the multiple linear regression model indicated that the environment, labor and material delay factors were statistically significant, with 0.293, 0.491, and 0.203 as the respective quantified impacts on productivity.