• 제목/요약/키워드: construction firm

검색결과 247건 처리시간 0.023초

설계사무소 운용을 위한 Server기반 BIM 통합정보시스템 프레임워크 개발 (A Framework of Server-Based BIM System for Architectural Design firm)

  • 조재근;김연수;마영균
    • 한국BIM학회 논문집
    • /
    • 제3권2호
    • /
    • pp.10-18
    • /
    • 2013
  • In the architectural design industry recent BIM system was introduced to the vast amount of information generated by the process, who need it and require the need to manage the construction of information related to production, storage, delivery. In addition, for the project to perform the work involved collaboration between organizations is essential. The purpose of this study was to BIM standard for the system to effectively utilize BIM technology and development of the BIM business support collaboration system, to establish a BIM application environment, a variety of information in the field of architectural design that can be used practically efficient transcription.

국내 설계시공일괄입찰방식 개선방안 (Improvement of the Design-Build Bidding in the Domestic Construction Industry)

  • 김수현;전민정;구교진;현창택
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.410-413
    • /
    • 2003
  • 건설시장에서 경쟁력을 강화하고 국제정책에 대응하기 위하여 설계업체와 시공업체의 협력을 장려하는 설계시공 일관입찰방식이 대두되었다. 설계시공일괄입찰방식은 공기단축, 사업비 절약, 품질 향상을 위한 전도 유망한 입찰방식이지만 국내 건설산업에서는 제도의 미비, 관계자들의 경험 및 인식부족 등으로 이러한 장점을 살리지 못하고 있다. 이에 따라 본 연구에서는 국내 공공공사 설계시공일괄입찰방식에서의 문제점을 사업비, 품질, 사업기간의 측면에서 분석하여 개선방안을 제안하고자 한다.

  • PDF

성토지지말뚝공법 중 섬유보강재의 인장력 검토에 관한 연구 (A Study on the tension of Geogid on Pile-supported Construction Method)

  • 문인호;박종관;이일화
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.905-917
    • /
    • 2008
  • Road or Railway construction over soft ground is needed to be considered on secondary consolidation which will be caused differential settlement, lack of transport serviceability, higher maintenance cost. Especially for the railway construction in the second phase of Gyung-Bu or Ho-Nam high speed railway, concrete slab track has been adapted as a safe and cost effective geotechnical solution. In this case controlling the total settlement under the tolerance is essential. And pile supported geogrid reinforced construction method is suggested as a solution for the problem of the traditional method on soft soil treatments. Pile supported geogrid reinforced construction method consists of piles that are designed to transfer the load of the embankment through the compressible soil layer to a firm foundation. The load from the embankment must be effectively transferred to the piles to prevent punching of the piles through the embankment fill creating differential settlement at the surface of the embankment. The arrangement of the piles can create soil arching to carry the load of embankment to the piles. In order to minimize the number of piles geogrid reinforced pile supported construction method is being used on a regular basis. This method consists of one or more layers of geogrid reinforcement placed between the top of the piles and the bottom of the embankment. This paper presents several methods of pile supported geogrid reinforced construction and calculation results from the several methods and comparison of them.

  • PDF

THREE-STAGED RISK EVALUATION MODEL FOR BIDDING ON INTERNATIONAL CONSTRUCTION PROJECTS

  • Wooyong Jung;Seung Heon Han
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.534-541
    • /
    • 2011
  • Risk evaluation approaches for bidding on international construction projects are typically partitioned into three stages: country selection, project classification, and bid-cost evaluation. However, previous studies are frequently under attack in that they have several crucial limitations: 1) a dearth of studies about country selection risk tailored for the overseas construction market at a corporate level; 2) no consideration of uncertainties for input variable per se; 3) less probabilistic approaches in estimating a range of cost variance; and 4) less inclusion of covariance impacts. This study thus suggests a three-staged risk evaluation model to resolve these inherent problems. In the first stage, a country portfolio model that maximizes the expected construction market growth rate and profit rate while decreasing market uncertainty is formulated using multi-objective genetic analysis. Following this, probabilistic approaches for screening bad projects are suggested through applying various data mining methods such as discriminant logistic regression, neural network, C5.0, and support vector machine. For the last stage, the cost overrun prediction model is simulated for determining a reasonable bid cost, while considering non-parametric distribution, effects of systematic risks, and the firm's specific capability accrued in a given country. Through the three consecutive models, this study verifies that international construction risk can be allocated, reduced, and projected to some degree, thereby contributing to sustaining stable profits and revenues in both the short-term and the long-term perspective.

  • PDF

DEA-AR 모형을 활용한 건축사사무소의 효율성 비교분석 (Measuring Management Efficiency of Architectural Firms in Korea using DEA/AR Models)

  • 김성식;박정로;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.125-126
    • /
    • 2012
  • Domestic architect office from a period of high growth from the 1970s to the '80s has been established as some of the large corporations or publicly traded corporation. 1997 IMF has pointed out there is a lot of need for improvement activities in accordance with the construction recession since the 2008 global financial crisis. In order to address these causes, the company's continuous efficient operation for accurate efficiency and competitiveness analysis was required. Leverage financial ratio indicators Study Using Data Envelopment Analysis Data Envelopment Analysis (DEA) model, how to find a benchmark for the improvement of the efficiency of inefficient enterprises in various sectors being. In this study, a comparison of the conventional DEA model and the DEA-AR model is used to analyze the efficiency and domestic architect office is to improve the management efficiency.

  • PDF

가설구조물의 붕괴재해에 관한 연구 (A Study on the Collapse Accidents of the Temporary Structures)

  • 백신원;최순주
    • 한국안전학회지
    • /
    • 제14권4호
    • /
    • pp.142-147
    • /
    • 1999
  • Formwork is a temporary structure that supports its own weight and that of the freshly placed concrete as well as construction live loads including materials, equipments, and workmen. In designing and building formwork, the contractor should plan for economical construction without sacrificing quality or safety. But these temporary structures sometimes collapse during the concrete placing. Among the accidents and failures that occur during concrete construction, many are formwork failures, which usually happen at the time concrete is being placed. Generally some unexpected events cause one member to give way, then others become overloaded or misaligned and the whole formwork structure collapses. In this study, formwork failure events from 1994 to 1997 are analyzed using the structural analysis program. So the causes of the respective formwork failure are explored. Therefore, the present study provides a firm base to design the temporary structures such as formwork.

  • PDF

건축적 패션 디자인의 구조적 전략 (Tectonic Strategies in Architectonic Fashion Design)

  • 임은혁
    • 패션비즈니스
    • /
    • 제18권1호
    • /
    • pp.164-181
    • /
    • 2014
  • As the boundary between fashion and architecture is getting blurred, the interactions of the two fields are turning out abundant as well as essential. This study investigates the tectonic strategies in architectural fashion design as a novel aesthetic in the 21st century by combining literary survey and case analysis on architecture and contemporary fashion. The tectonic strategies in the works of architectural fashion designers were categorized as follows: organic geometry, technological garment construction, and independent space. Organic geometry transforms basic geometric shapes into subtle organic forms after being thrown on the body. Technological garment construction explores the garment structure and volume by applying the structural principle of suspension and fractal geometry. Independent space refers to maintaining the firm three-dimensionality of garment structure which keeps the distance from the body, assuming the similarity to architecture.

방수공사에 있어서 실링공법의 효율적 활용을 위한 개선 - 견적을 중심으로 - (A Study on the Effective Utilization of Sealing Methods for Waterproof)

  • 김종원;이규현;최인성
    • 한국건축시공학회지
    • /
    • 제5권2호
    • /
    • pp.147-152
    • /
    • 2005
  • The purpose of this study is to present a rational approach for estimating the unit price and the amounts of sealing materials of the sealing works. This approach, considering field conditions and sealing materials' characteristics, can optimize the cost of the sealing works as well as that of maintenance. For the study, 10 case buildings for 3 years, built by middle size construction firm, were studied in order to investigate the unit price and the amounts of sealing materials.

토목섬유보강 성토지지말뚝의 설계조건별 침하억제 효과 (Effect of the Settlement Reduction to each Geosynthetic Reinforced Pile Supported Embankments Design Condition)

  • 이일화;이성진;이수형;문인호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.1519-1524
    • /
    • 2009
  • Construction of high-speed concrete track embankments over soft ground needs many of the ground improvement techniques. Drains, surcharge loading, and geosynthetic reinforcement, have all been used to solve the settlement and embankment stability issues associated with construction on soft soils. However, when time constraints are critical to the success of the project, another measures should be considered. Especially, since the design criteria of residual settlement is limited as 30mm for concrete track embankment, it is very difficult to satisfy this allowable settlement by using the former construction method. Pile net method consist of vertical columns that are designed to transfer the load of the embankment through the soft compressible soil layer to a firm foundation and one or more layers of geosynthetic reinforcement placed between the top of the columns and the bottom of the embankment. In this paper, three cases with different embankment height and number of geosynthetic reinforcement, were studied through FEM analysis for efficient use of pile net method.

  • PDF

국내외 건설부문 기업결합성과 분석 (Ex Ante Expectations & Ex Post Operating Performances of Mergers and Acquisitions of the Korean and U.S. Construction Industry)

  • 최종수
    • 한국건설관리학회논문집
    • /
    • 제6권5호
    • /
    • pp.128-138
    • /
    • 2005
  • 기업 인수/합병의 성과에 대한 평가는 인수/합병 발표일 전후 단기간에 걸쳐 실현되는 경제적인 이익을 측정하는 방법과 인수/합병 종료 후의 장기 경영성과를 평가하는 방법으로 대별된다. 본 연구에서는 최근 국내외에서 급증하고 있는 건설분야 인수/합병 중 선정된 샘플을 대상으로 위에서 기술된 전자의 방법을 중심으로 전반적인 성공여부를 분석/평가하였다. 또한 인수/합병이 기업전략의 이행이라는 관점에서 사업다각화 방향에 따른 성과를 비교/분석하였다. 분석결과에 의하면 국내외 건설분야 인수/합병의 단기성과는 다소간의 경제적 이익을 실현한 것으로 평가되었으나 통계분석의 관점에서 성공적이라는 결론을 내리기 어려운 것으로 나타났다. 한편, 사업다각화 방향에 따른 성과의 비교에서는 유사부문 및 타 부문으로의 사업다각화 사이에 뚜렷한 차이가 없는 것으로 나타났다.