• Title/Summary/Keyword: construction fee

Search Result 115, Processing Time 0.027 seconds

A Study on the Improvement of Cost Calculation Model of Recycling Treatment Facility for Estimation of Construction Waste Disposal Fee (건설폐기물 처리대가 산정을 위한 중간처리시설의 비용산정 모델 개선에 관한 연구)

  • Chang-Hak, Kim;Jun-Yeong, Lee;Hyo-Jin, Kim
    • Land and Housing Review
    • /
    • v.14 no.1
    • /
    • pp.135-144
    • /
    • 2023
  • LH Corporation uses the construction waste disposal fee standard, of which the model was developed a long time ago. Therefore, this model is problematic because it needs to reflect waste treatment facilities' technological development and environmental conditions. In this study, the estimated manpower and costs required for the process operation of waste treatment facilities were analyzed, followed by the proposed estimation criteria. This improved standard model can be used as a cost calculation standard for the recycling and treatment of construction waste in public institutions. The study also suggests that an increase in waste treatment costs is needed.

Did the Handling Fee Decline Cause Consumer Surplus in the Port Business Market in Korea? : The Case of Busan port (컨테이너 하역요율 하락은 소비자잉여를 증가시켰는가? : 부산항을 중심으로)

  • Choi, Gun-Woo;Kim, Chan-Ho;Kim, Young-Kyu
    • Journal of Korea Port Economic Association
    • /
    • v.32 no.3
    • /
    • pp.109-122
    • /
    • 2016
  • As increasing of container throughputs, port business market in Korea has been developed. However, due to the introducing of a handling fee reporting system in 1999 and surplus of facilities, port business market in Korea turned into deadly competition with lowering the handling fee. Due to the reasons, the handling fee in 2015 declined as much as 50% of in 2000. Therefore, this study analyzed whether the handling fee decline caused consumer surplus in the port business market of Korea or not. To do that, this study applied a methodology of Alexander for estimating the consumer surplus and Hausman's model using Hicksian demand. As the result of the analyzing, due to the excessive decreasing of the handling fee compared the import & export demand, consumer surplus of the port business market in Korea was decreased. However, due to the exception of transshipment from demand in this study, transshipment demand is needed to be considered to estimate of economic value of port business market in Korea in the future. Also, economic value of port business including subsidiary businesses will be estimated in order to strengthen the method for estimating economic benefit of port construction.

A Comparative Study on the Repair Performance of Concrete Crack (콘크리트 균열 보수성능에 관한 비교 연구)

  • 박성우;윤성훈
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.10a
    • /
    • pp.817-822
    • /
    • 2002
  • The problem of the crack which occures from the reinforced concrete structure could be caused by the complexed factors. When the crack happen, it caused fatal blemish to manage and maintain the structure such as structural problem, licking, spalling, viewing Even though they study and work hard to solve this kind of problem in the world, there are no countermeasure for perfect prevention of crack. After the crack checked out, a method of repair-reinforcement has been studied and operated actively, Generally, occurance of the crack in the concrete structure could be taken as granted, no need to mention the damage from the crack, domestic construction try to hide it rather than repair basically, In many cases the construction amount for repairing the crack has to be made in the construction area and the amount is very expensive. To save the repaing fee, companys repair it under the meeting of their desire. it can be expected for the effection of the construction. For this reason, we compare a new injection method to solve the demerits of the present method, to save and use the merit of the present method.

  • PDF

Web-system development for the feasibility of national road

  • Park, T.;Shin, E.;Kang, T.;Park, W.;Lee, Y.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.698-699
    • /
    • 2015
  • For last three years, our research team have conducted the project named "Development of construction project management technology based on BIM/GIS platform. "We developed construction cost estimation system as well as 3D modeling engine at the first two year and established a web-system which could estimate the benefits of the project and further analyze the economic and financial feasibility of the project. This paper mainly focused on the functions and specifications of web-system. The system was composed of two modules: economic feasibility estimation module and financial feasibility estimation module. While the economic feasibility estimation module determines economic feasibility of the project based on traffic demand forecasting from the public's perspective, the financial feasibility estimation module determine financial viability of the project using toll fee of the road from private entity's perspective. Compared with traditional feasibility study, the proposed system provide users with better flexibility which can make users easily to validate the project upon the change of project environments. The system was also verified with an already accomplished project. The verification showed that proposed system could provide satisfactory accurate results with reduced time and resources.

  • PDF

A Study on NOS Model System for The Construction Work Planing and Management (건설 시공 계획 및 관리 업무의 적용을 위한 NOS 모델 구축 연구)

  • Choi, Jaejin;Park, Hongtae
    • Journal of the Society of Disaster Information
    • /
    • v.12 no.1
    • /
    • pp.10-18
    • /
    • 2016
  • This study presented a new NOS model through the following suggestions to apply the construction work planing and management to NOS(Network Operating System). First, This study presented CIMS(construction information classification system) reflected the characteristics of facility classification - functional component classification - functional component classification - work classification - resource classification. Based on this system. this study presented how to establish PMMB(performance measurement management baseline) with proposed master target equation which analyzed the trend of performance measurement management baseline and proposed work target equation which analyzed the execution results. Finally, this study presented NOS model that can be applied to fixed price method and cost plus fee method through the theoretical verification of executive performance analysis method.

A basic study for Introduction of Standards Governing Compensation for Design Service of Mechanical Facilities of Buildings (건축기계설비 설계용역 대가기준 도입을 위한 기초연구)

  • Han, Jae-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.189-190
    • /
    • 2017
  • As buildings take on more advanced features, mechanical facilities of buildings are accounting for increasingly greater significance in building construction projects. However, mechanical facility designers are forced to be content with design service fees that do not properly compensate their excessive workload, with lowest-bid-first tendering practices compounding their economic woes. In relation to this, this Study aims to offer suggestions for better standards for compensation of design service for mechanical facilities of buildings, highlighting five key suggestions in consideration of relatively small size of work and unmatched long duration of work.

  • PDF

A Study on Improving the Application fee E-payment (민원수수료 전자지불 개선방안 연구)

  • Kim, Young-Jin;Kim, Byung-Kon;Lim, Jae-Kyu
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2012.11a
    • /
    • pp.1671-1672
    • /
    • 2012
  • 최근 정부는 대민서비스 향상을 위해 인터넷 등 전자적으로 신청하는 민원의 신청수수료 전자납부 절차를 제공하고 있으나, 민원처리 과정에서 금액이 결정되는 허가수수료와 서면민원의 신청수수료는 전자납부 절차가 없어 수수료를 수입인지로 납부하고 있다. 본 연구에서는 기존 인터넷 민원 신청수수료 전자납부절차를 개선하여, 모든 민원수수료의 전자납부 방안을 제시함으로써 인허가기관의 민원수수료 관리의 투명성 및 업무효율성 제고와 대국민 불편해소를 도모하고자 한다.

Study on Establishment of Cadastral Surveying Fee System Suitable for Digital Cadastral Management Environment (디지털 지적관리 환경에 적합한 지적측량수수료 체계 확립 연구)

  • Hong, Sung-Eon
    • Journal of Digital Convergence
    • /
    • v.13 no.12
    • /
    • pp.23-30
    • /
    • 2015
  • The current cadastral business is being operated by conversion to a digital cadastral management system through computerized registers (land register and forest land register) and maps (cadastral map and forest cadastral map). Digital surveying methods, such as GPS surveying and electronic plane table surveying, are also used for cadastral surveying. At present, fees for cadastral surveying are calculated based on a standard pursuant to the Construction Standard Production Unit System and an announcement by the Ministry of Land, Infrastructure, and Transportation. In many cases, however, the cadastral surveying fee system announced at present fail to apply the digitalized environment depending on the item. This study sought to analyze the cadastral surveying fee system that requires improvement in the rapidly changing digital cadastral management environment, and to prepare a basis to establish a cadastral surveying fee system suitable to the digital environment by suggesting an improvement method for such system. As a result of the study, the following suggestions were made: a method of changing to terms suitable to the digital environment based on the current status analysis; preparation of a new estimation system regarding new estimation items; and re-survey of an estimation system of cadastral confirmation survey and preparation of an estimation system.

A Rating Method for the Estimation of the Additional Overhead Expenses incurred by Schedule Extension in Public Construction Projects (공공건설공사의 공기연장에 따른 추가간접비 산출을 위한 요율방식 제안)

  • Lee, Seung-Joon;Cha, Yongwoon;Han, Sangwon;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.3
    • /
    • pp.79-90
    • /
    • 2021
  • In domestic public construction, disputes are increasing due to differences among stakeholders regarding contract price adjustment. In particular, the actual cost-plus fee for overhead costs due to the schedule extension cannot be agreed upon at the administrative phase, and most of them seek judicial judgment. Thus, this study aims to propose a 'sufficiently satisfactory' alternative to reach an agreement before disputes in order to minimize disputes related to the calculation of additional overhead costs. To this end, this study proposes three alternatives based on the rate method. Firstly, when calculating additional overhead costs, it is not calculated as an actual cost-plus-fee method, but as a rate compared to direct labor costs among net direct costs. Secondly, the calculated indirect labor costs are compensated for up to the legal maximum of legal limit costs such as general management costs, profits and so on. Thirdly, it reflects overhead costs increased or decreased due to change orders. Risks were analyzed by collecting expert opinions on the proposed methods and applying actual cases. Finally, as a result of investigating the level of consensus for each stakeholder, it was confirmed that all stakeholders could agree regardless of the size of the company. The result of this study is expected to as a useful tool among stakeholders in the construction fields that can be able to easily agreed upon.

Cost Analysis of the Structural Work of Green Frame

  • Joo, Jin-Kyu;Kim, Sun-Kuk;Lee, Goon-Jae;Lim, Chae-Yeon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.4
    • /
    • pp.401-414
    • /
    • 2012
  • The adoption of Green Frame is expected to provide economic benefits, since construction costs are reduced by the in-situ production of precast concrete column and beam. The cost reduction can ultimately be realized by saving transportation costs and the overhead and profit of PC plants. The cost structure of Green Frame, which is built up using composite precast concrete members, is similar to that of a bearing-wall structure, but the difference in construction process has resulted in some cost differences for a few items. In particular, production and installation is the principal work involved in Green Frame made by precast concrete members, while form and concrete work is the principal work for a bearing-wall structure. As such, the rental time and fee for a tower crane should be compared through time analysis. To verify reliability, this study focused on developed residential projects to estimate the construction costs. Through this analysis, it was found that the costs of Green Frame were 1.57% lower than the costs of bearing-wall structure. The results of this study will help in the development of a management plan for the structural work of Green Frame.