건설공사 한 프로젝트의 전체공기는 개별 작업들이 수행된 날짜의 합이라 할 수 있다. 개별 작업들에서 지연이 발생할 경우 전체 공기 또한 늦어지기 마련이다. 이러한 개별 작업의 계획상에서 작업이 수행될 확률을 높인다면 프로젝트의 공기달성 확률 또한 높아지게 될 것이다. 따라서, 계획상의 작업 실행여부 확인을 위하여 건설 생산프로세스에서 각 작업의 수행 저해하는 제약요인을 도출하여 작업여건분석의 실시를 통해 저해요인의 사전 제거와 작업간의 상호의존성을 파악으로 작성된 개별 작업계획들의 실행 가능성 확인함으로써 공사전체의 공기지연을 방지하는 체계를 구축하고자 한다.
The 6th International Conference on Construction Engineering and Project Management
/
pp.527-531
/
2015
With the mounting concerns over environmental issues, green construction is gaining a place in the global construction industry. However, rare research has been conducted to analyze green construction projects, especially in the aspect of project schedule performance. As a result, this study aims to investigate the degree of project delay in green building construction, analyze the factors affecting schedule delay of green building projects, and finally provide recommendations to improve schedule performance of green building project. To achieve the objectives, a comprehensive literature review was carried out, followed by a survey conducted with 30 companies that provided data from 220 traditional and 96 green building projects. The analysis of the responses identified that 15.9% of the traditional building projects were delayed while 32.3% of the green building projects were completed behind schedule. Furthermore, the amount of the delays in green building projects was an average of 4.8% of their planned schedule. The top 5 critical factors that can cause delay in green building projects were identified as: (1) speed of decision-making by clients; (2) speed of decision-making involving all project teams; (3) communication/coordination between key parties; (4) level of experience of consultants; and (5) difficulties in contractors' project financing. Lastly, a list of recommendations was introduced, aiming to reduce schedule delay in green building construction projects based on the observations. This study will serve as s a base for further research on the enhancement of green building project schedule performance.
Mohamed, Mohd Amizan Bin;Teo, Melissa;Kajewski, Stephen;Trigunarsyah, Bambang
국제학술발표논문집
/
The 6th International Conference on Construction Engineering and Project Management
/
pp.477-480
/
2015
Construction projects are high-risk activities. When undertaking such projects in an international setting, it can be complicated by foreign exchange (FOREX) fluctuation risk. This affects the construction business performance in various ways, namely its progress due to delays, which in turn create further problems, specifically cost overruns as a result of price increase in raw materials, disputes, arbitration, litigation and even, total abandonment. Thus, the effective management of FOREX fluctuations is crucial. Previous studies have focused on the need for contract safeguards, adequate insurance, careful planning and management, as well as foreign exchange futures hedging to address some of the risks triggered by FOREX fluctuations. An analysis of FOREX fluctuations in the international construction industry revealed that more often it was focused on project-specific issues. Currently, there is a relative lack of awareness on Organizational Capabilities (OC), the abilities that owned by the organization, which is essential in managing the impact of FOREX fluctuations. Where research has focused on OC, these are viewed in isolation. Therefore, this study attempts to close the gap by proposing a framework on managing the impact of FOREX fluctuations in the international construction industry, employing the OC perspective.
Construction delays occur frequently in outrigger framework of tall buildings due to the unexpected conditions and lack of experience. However, delay factors of the outrigger framework has not been managed efficiently. Therefore, the systematic management is needed by perceiving possible delay factors before constructing management system. In this study, the major delay factors of outrigger framework are conducted to derive by using the Importance Performance Analysis(IPA). It is expected that the results of this study are utilized for planning of systematic scheduling in outrigger framework of tall building.
건설공사 한 프로젝트의 전체공기는 개별 작업들이 수행된 날짜의 합이라 할 수 있다. 개별 작업들에서 지연이 발생할 경우 전체 공기 또한 늦어지기 마련이다. 이러한 개별 작업의 계획상에서 작업이 수행될 확률을 높인다면 프로젝트의 공기달성 확률 또한 높아지게 될 것이다. 따라서, 계획상의 작업 실행여부 확인을 위하여 건설 생산프로세스에서 각 작업의 수행을 저해하는 제약요인을 도출하여 작업여건분석을 한다. 작업여건분석을 통해 저해요인 사전 제거와 작업간의 상호의존성을 파악으로 작성된 개별 작업계획들의 실행 가능성 확임함으로써 공사전체의 공기지연을 방지하는 체계를 구축하고자 한다.
Nallathiga, Ramakrishna;Shaikh, Haris D;Shaikh, Tauseef F;Sheik, Farhan A
Journal of Construction Engineering and Project Management
/
제7권4호
/
pp.1-12
/
2017
India has accorded a high priority to road infrastructure development through Public-Private Partnership (PPP) and it has set a high target for investment inflows. Yet, it is widely held that road/highway infrastructure has not been developing at required pace and that the road infrastructure projects under PPP have been suffering from several hurdles and delays, thereby affecting project success/failure. This paper is an attempt to analyze the critical success/failure factors of road infrastructure projects under PPP in India. A questionnaire survey was conducted among a sample of the stakeholders of road infrastructure projects to identify the critical success/failure factors during all four major project stages using different approaches. Initially, the critical factors were identified through ranking based on the average/mean score. Later, the conventional RII score was used to identify the critical success/failure factors. Finally, the critical success/failure factors were also identified based on the stakeholder-wise ranking of the factors and their convergence. The assessment revealed that there was a greater convergence across the different methods and also that there was greater consensus among project stakeholder on the critical success/failure factors of road PPP projects.
In apartment housing construction, window frame installation work, which is conducted after the structural framework, is very important, because its completion time directly affects the starting time of successive interior finishing works, as well as the overall construction period. Construction delays in interior finishing works might occur due to problems inherent to the conventional window frame installation method, such as the poor verticality of window frames, and the water leakage around them. The primary objective of this study is to analyze the problems of a 'Gangform integrated PVC window frame pre-installation method' based on its pilot test results. Next, this study proposes an improved conceptual model that enables the end users to enhance the field applicability of this method in terms of productivity, time, and cost. The field applicability of the proposed 'Gangform integrated PVC window frame pre-installation method' was also verified through a survey.
The 5th International Conference on Construction Engineering and Project Management
/
pp.459-466
/
2013
Risk exists in all construction projects and resides among the collection of subcontractors and their array of individual activities. Wherever risk resides, the interrelation of participants to one another becomes paramount for the way in which risk is measured. Inherent risk becomes recognizable and quantifiable within network schedules in the form of consuming float - the flexibility to absorb delays. Allocating, owning, valuing, and expending such float in network schedules has been debated since the inception of the critical path method itself. This research investigates the foundational element of a three-part approach that examines how float can be traded as a commodity, a concept whose promise remains unfulfilled for lack of a holistic approach. The Capital Asset Pricing Model (CAPM) of financial portfolio theory, which describes the relationship between risk and expected return of individual stocks, is explored as an analogy to quantify the inherent risk of the participants in construction projects. The inherent relationship between them and their impact on overall schedule performance, defined as schedule risk -the likelihood of failing to meet schedule plans and the effect of such failure, is matched with the use of CAPM's beta component - the risk correlation measure of an individual stock to that of the entire market - to determine parallels with respect to the inner workings and risks represented by each entity or activity within a schedule. This correlation is the initial theoretical extension that is required to identify where risk resides within construction projects, allocate and commoditize it, and achieve actual tradability.
The construction environment has been declared as a hazard prone area due to high number of accident and death. The study aims to identify influential factors that contribute to poor safety practices and its consequences on construction workers in Cape Coast Metropolis. Seventy respondents were taken as the sample size for the study. Descriptive analysis was used to analyze the data obtained from the field. Findings show that poor site management, working without safety gadgets, failure to use their Personal Protective Equipment (PPE) and negligence of workers were the main causes of accidents on sites. Poor site management had the highest ranking among the seven variables. Effects of poor safety practices on building construction site and delays in work execution were due to injury of workers, extra cost due to payment of compensation to injured victims, not motivated due to injury of worker and declined reputation of firm. Management team should motivate workers for safe work done, provide adequate PPE for their workers on site and have documented health and safety policy on site. Site authorities and management team should be on site regularly to ensure proper safety practices on construction site.
In the construction industry, a great deal of research has been focused on productivity improvement because a minor change in labor productivity can often make the difference between a profit and a loss. This study shows how productivity measurement methods can be applied in practice, step by step, to analyze and identify potential problems both in productivity and methods performance for masonry work. A work sampling technique was conducted to determine the nature and extent of an observable activity as an aid to measuring overall performance. Also, a method productivity delay model was used to identify non-productivity in individual cycle times. From the work sampling technique, it was found that the masonry crew had a Labor Utilization Factor of 47.1%, and from the videotape analysis, it was found that the material and dumpster location need to be adjusted to reduce the travelling distance. We have found that efforts to improve the productivity of masonry work should be focused almost exclusively on machine and labor delays, based on the result from the method productivity delay model.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.