• Title/Summary/Keyword: construction costs

Search Result 1,544, Processing Time 0.029 seconds

Analysis of accident types at small and medium-sized construction sites based on web scraping and text mining (웹 스크래핑 및 텍스트마이닝에 기반한 중소규모 건설현장 사고유형 분석)

  • Younggeun Yoon
    • The Journal of the Convergence on Culture Technology
    • /
    • v.10 no.1
    • /
    • pp.609-615
    • /
    • 2024
  • The construction industry's fatality count stands at 402, comprising approximately 46% of total industrial accidents. Notably, construction costs less than 5 billion won account for about 69%, so strengthening safety management at small and medium-sized construction sites is required. In this study, 19,511 accident investigation data were collected using web scraping. Through statistical analysis of the collected structured data and text mining analysis of the unstructured data, accident types and causes of accidents were analyzed by construction costs at sites less than 5 billion won. As a result, it was confirmed that there were differences in accident types and causes depending on the construction costs. It is hoped that the results of this study will be used for customized safety management at small and medium-sized construction sites.

Analysis of Causes of Increase in Construction Cost and Minimize Increase of Cost through Performance Evaluation of Public Construction Projects (공공건설사업의 성과평가를 통한 공사비 증가 원인 분석 및 증가 최소화 방안)

  • Moon, Hyunseok;Ryoo, Geunho;Hong, Hyunki
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.4
    • /
    • pp.567-575
    • /
    • 2024
  • The government and local governments are utilizing regulations, policies, and various project management techniques at each project stage to effectively and systematically manage public construction projects. However, the increase in construction costs continues to occur. In order to solve these problems, this study attempted to collect cases of existing public construction projects and analyze historical data. And it would like to derive the impact factor of increased construction costs. Based on the results, a plan was proposed to prevent the causes of increase and minimize in construction costs. The main reasons for the increase in costs were the occurrence of civil petition, differences between design documents and site conditions, and changes due to requests from the owner and changes in the business plan. And to solve these problems, this study proposed improvement for each cause from an institutional perspective, along with interview with experts and project owners. The results of this study are significant in improving the process of existing public construction process and presenting key inspection and review items for each major inspection stage in order to solve problem resulting from the analysis of the performance of public construction projects.

Analysis of Cost Estimate Method Based on Engineering 3D Model for Nuclear Power Plant Construction Project (엔지니어링 3D모델 기반 원전 건설사업비 산정방안 분석)

  • Lee, Sang-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.294-295
    • /
    • 2018
  • Nowadays, the construction industry utilizes 3D models in the designing process, on which research is being conducted to establish an automated system for project cost estimation in connection with information related to construction such as material unit costs and wages, beyond the level of design interference review and construction quantity estimation. In this process, the project cost is estimated in connection with unit price data after takeoff the quantity based on the 3D model attributes and data types. A way to reduce cost and risk would be first developing prototypes of some of essential buildings and works, comparing and validating the outcomes, and then extending to the whole scope, because estimates differ on the basis of the scope and level of 3D design models as well as the data accuracy. This study analyzes case studies of project cost estimation by computing the quantity on the basis of 3D model in the construction industry and explores methodologies and management measures applicable for estimating nuclear power plant construction project costs.

  • PDF

Application of Activity-Based Costing(ABC) for Modular Construction Quality Management (활동기준원가계산을 이용한 모듈러 건축 프로젝트의 품질관리방안)

  • Lee, Jeong-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.5
    • /
    • pp.485-496
    • /
    • 2022
  • Modular construction projects offer advantageous over conventional construction projects in the area of quality control through factory production. However, as clear standards and definitions for quality control activities have yet to be not established, it is difficult to judge the appropriateness of the scale of quality control costs, and it is also difficult to classify quality control activities by process stage. Therefore, in this study, a method for classifying quality management activities based on activity standards was presented, in addition to a method for classifying quality costs according to the PAF standards to check how effective the costs and activities are for quality control in the future. The findings of this study can be used to define the quality management activities for each stage of the modular construction project in the future, and to develop a database of evidence to determine the appropriateness of cost distribution accordingly.

The Research on Environmental-Friendly Manhole Repair and Construction Technology (친 환경적 맨홀 보수 및 시공 기술개발에 대한 연구)

  • Seo, Jeong-Hwan;Yang, Hae-Jeong;Kim, Kwang
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.21 no.5
    • /
    • pp.836-841
    • /
    • 2012
  • The repair of road pavement and manhole has been resulted long construction times and traffic jams, environmental pollution from construction wastes, and budget waste due to excessive construction costs. In order to resolve such problems, we have developed the new construction method using C-ring, which can fix and raise the manhole securely. This technology is the method by driving in a wedge after inserting C-ring and expanding it in order to raise manhole to the regular height. This has been approved by the test reports of KOLAS(Korea Laboratory Accreditation Scheme), and was confirmed safety, durability and reliabilty in result. In this paper we approved this technology was able to short working times to around 20% and construction costs to around 50% with compare other construction methods. Also, environmental pollution and civil complaints will be prevented because there will be no longer any noises, vibrations, dust, or construction wastes.

Analysis of Cost Benefit Related to Appointing a Health Care Manager in the Construction Industry (건설업 보건관리자 선임 관련 비용편익분석)

  • Jung, Hye-Sun;Yi, Jee-Seon;Shin, In-Jae;Choi, Eun-Hi
    • Korean Journal of Occupational Health Nursing
    • /
    • v.25 no.2
    • /
    • pp.130-140
    • /
    • 2016
  • Purpose: The construction worker has diverse harmful factors such as noise, dust, and dealing with chemicals. Therefore this research aimed to examine the necessity of appointing a health manager in the construction industry by examining the cost-benefit analysis when the construction industry appoints a health manager. Methods: In order to calculate the healthcare staff employment cost and the benefits from their activities in 1,425 construction companies with the staff of 300 or more people during 2011, this study analyzed existing data and existing research data, as well as national data. Results: Total annual costs were 99,920,070,900 won and total annual benefits were 324,807,182,625 won. Benefits were found to be 224,887,111,725 won exceeding costs. Benefit/cost ratio resulting from appointing a health manager in the construction industry workplaces was 3.25 times. Conclusion: The findings of this research can be used as the base data to make rational decision to positively encourage the employment of healthcare staff in construction companies pursuant to relevant laws.

Improvement of Bill of Quantities of Door and Window Work for BIM-based Cost Estimation (BIM 기반 견적을 위한 창호공사 내역 작성체계 개선 방안)

  • Kim, Mi-Hyeon;Jo, Chan-Won;Yun, Seok-Heon
    • Journal of KIBIM
    • /
    • v.10 no.2
    • /
    • pp.12-20
    • /
    • 2020
  • Recently, interest in BIM technology has been growing in the domestic construction market as the number of construction projects requiring the application of BIM technology has increased. The use of BIM allows the use of various visualization functions through 3D models as well as drawing interference review, quantity calculation and integrated management of information. In particular, estimates of construction costs based on BIM can increase work efficiency by reducing the burden of calculating construction costs and managing them. In order to increase the efficiency of BIM-based cost estimates, it is necessary to improve the correlation between the BoQ(Bill of Quantity) information and the BIM model. For this purpose, the ratio of the amount and item to the detailed construction of the current BoQ was analyzed, especially the problem of the calculation of construction cost in the window work in this study. In addition, we would like to suggest a method for systematically linking the BoQ information with the BIM model by improving the BoQ information structure of the window work. It is expected that this will increase the efficiency of the quantity calculation and analysis work of construction cost of window work. In addition, it is expected that this method will help to analyze and predict changes in construction cost of windows and doors by facility characteristics and type.

A Study on the Calculation of Construction Costs and Their Annual Equivalent Recovery at PECT and GCT (컨테이너부두의 건설원가와 연간투자비 회수에 관한 연구)

  • 이태우;임종길
    • Journal of Korean Port Research
    • /
    • v.14 no.2
    • /
    • pp.165-173
    • /
    • 2000
  • Major factors that are considered to determine lease charges of container terminals are, among others, construction cost of berth, discount rate, financing cost, and size of annual equivalent recovery. This paper aims to calculate construction costs at PECT and GCT and their annual equivalent recovery on the basis of historical data, and to identify whether or not the relationship of the above result and current lease charges at the two terminals are justifiable.

  • PDF

The Improvement Plan on Fare and Ticketing System of Seoul Metropolitan Subway Considering Construction and Operational Costs (건설.운영비를 고려한 수도권 전철의 운임체계 및 승차권제도 개선방안)

  • Lee, Tai-Sik;Ryu, Jong-Won;Chung, Chul;Lee, Dong-Wook
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.3 s.40
    • /
    • pp.327-336
    • /
    • 2007
  • Operation a subway company requires high amount of early construction, operation and maintenance costs. Seoul Metro, one of the public subway companies in Seoul, Korea, has undergone operational deficit from its establishment, and the main reason is that the early construction and operation cost exceed the total revenue. Therefore, detailed researches on current operation system and possible alternatives are conducted to settle down finance trouble of the company. In particular, problems on operation and ticketing systems are analyzed, and based on that, necessity and detailed plan of railroad pass for one day are introduced and analyzed.

SEOUL TOLL PLAZA VALUE ENGINEERING STUDY CONSIDERING PERFORMANCE MEASUREMENT AND LIFE-CYCLE COSTS

  • Jong-Kwon Lim;Min-Jae Lee ;George Hunter;Sung-il Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.621-626
    • /
    • 2005
  • Recent increases in construction costs on Korean public works projects, largely due to change orders caused by poorly elaborated design, become a motivation of applying VE process in Korean construction industry. The Seoul Toll Plaza project, recently value analyzed by four VE teams, demonstrates how value management helps save time, money and increase functional performance. The objective of this project is to upgrade and expand existing pay and ticket booths system on "Kyungboo Express Highway", the main artery for the Korean peninsula linking Seoul to Pusan. The value management study generated several innovate alternatives capable of saving up to 50% of project cost from the baseline project plan.

  • PDF