Empirical Analysis of Man-hour Data to Support a Cost-Plus Pricing Approach for Estimating BIM Service Costs

  • Koo, Bonsang;Lee, Ghang;Kim, Chung-woon;Shin, Byungjin
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.660-661
    • /
    • 2015
  • Building Information Modeling (BIM) is a nascent technology in Korea, and currently lacks formal guidelines to assist Architectural and Engineering (AE) firms in estimating BIM service fees, while also allowing government agencies to allocate budgets for the rendered BIM services. This research provides a method to estimate costs for BIM services based on the cost-plus pricing framework. The approach requires a generalized estimate of the man hour per floor area data to calculate the direct labor costs. Man-hour data were collected from forty five projects that have implemented BIM. Interpolation of the man-hours was performed to develop a general reference table for 'Type 2' (i.e., public schools and office buildings, etc.) projects. By providing an objective approach for estimating the costs of BIM services, it allows clients and AE firms to agree upon a fair cost for BIM related services, and thus expedite its adoption in Korea.

  • PDF

COST ANALYSIS OF STRUCTURAL PLAN FOR REDUCING FRAMEWORK CONSTRUCTION DURATION OF REINFORCED CONCRETE RESIDENTIAL BUILDINGS

  • Seon-Woo Joo;Moonseo Park;Hyun-Soo Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.493-498
    • /
    • 2009
  • Recently, the number of complex construction projects, such as high-density development and long-span mega structure construction, has been increasing globally. Therefore, the construction duration has become an even more important factor for success. Nevertheless, in domestic residential construction projects, it usually takes more time than twice as much as North American cases. The long construction duration causes a number of problems, for example growth of financial costs, fall in productivity, and weakness of competitiveness. If the framework construction duration can be shortened to 3 ~ 4 days, then it is also expected to complete the finish work of building in shorter duration, be led to reduce the entire construction duration, and eventually to save a great deal of indirect costs. For shortening the construction duration, previous researches pointed out that the development of simplified plan design should precedes. But, in reality, lack of experience of new design and innovative techniques tends to be the obstacle to wide adoption of the simplified plan design in construction fields. In this paper, a simplified structural plan design is proposed, and the construction cost is quantitatively compared between when traditional construction technique is applied to the traditional plan and when the duration-shortening key technique is applied to the developed plan.

  • PDF

공동주택용 외단열 적층시공 공법 개념모델 개발 (The Conceptual Framework of Concurrent Construction Method for EIFS in Apartment)

  • 임현수;김태훈;조훈희;강경인
    • 한국건축시공학회지
    • /
    • 제15권4호
    • /
    • pp.413-423
    • /
    • 2015
  • 공동주택의 에너지 의무 절감률이 현재 40%에서 2017년에는 60%까지 단계적으로 상향 조정되면서 에너지 절감을 위해 외단열 공법이 주목받고 있다. 그러나 기존 외단열 공법은 내단열 공법에 비해 추가되는 공사비와 공사기간으로 인해 활성화가 미흡한 실정이다. 따라서 본 연구는 외단열공사와 골조공사를 연속적으로 시공함으로서 공사기간을 단축하고 공사비를 절감할 수 있는 외단열 적층시공 공법의 개념모델을 개발하고 사례적용을 통해 공법의 타당성을 검증하였다. 연구결과 외단열 적층시공 공법은 기존의 외단열 공법에 비해 6.7%의 공기절감 효과와 13%의 외단열 공사비 절감효과가 있는 것으로 나타났다. 본 연구의 결과인 적층시공 공법은 외단열 공법적용의 저해요소를 해결하여 향후 외단열 공법 활성화에 기여할 것으로 기대된다.

도로포장 유지보수 공사비산정기준 개정에 대한 연구 (A Study on Revising Construction Cost Calculation for Road Paving Maintenance Work)

  • 오재훈;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.155-156
    • /
    • 2020
  • Unlike new construction projects, road paving maintenance work shows large productivity discrepancies depending on the conditions of the worksite. The current construction cost calculation scheme, however, only provides daily construction volume categorized by work scope and scale: There are no detailed standards that can be implemented on various types of worksites. To develop standards that enable the calculation of appropriate construction costs by taking into account worksite conditions, the current study conducted on-site surveys and interviews. The on-site research and analysis revealed that location, construction width, the day's worksite lot, work scope, and construction objectives were found to cause differences in construction volume. In addition to the existing work scope and work scape variables, the current study added weight constants reflecting the daily work volume based on movement conditions at site and the size of the worksite lot. In this process, the current study found that even one type of construction project can have fifteen different levels of daily construction volume. Such detailed classification was deemed to enable the proper calculation of construction costs based on worksite conditions.

  • PDF

런던아이의 디자인 전개와 건립과정에 관한 연구 (A Study on the Design Development and Construction Process in British Airways London Eye)

  • 우대성
    • 건축역사연구
    • /
    • 제15권1호
    • /
    • pp.7-27
    • /
    • 2006
  • This study aims to identify and analyze the factors that influenced the construction of London Eye which was led by private groups, including characteristics in progress, differentiated value in design, the combination of technology and design, and construction costs. The results of this study were the followings. 1) London Eye provides a new construction method for a landmark in the downtown in that the architects became the clients of the project which might have been hoarded, procuring the construction costs and completing it by themselves. 2) London Eye presents a space utilization method where undeveloped spaces in the downtown are used in three-dimensions by erecting a structure on the river with a minimum land. 3) The process of design, production and erection is propelled the realization of technical intention design with one system and from at the initial stage, the participation of the engineer where the designer is equal with you must accompany. 4) London Eye is endowed with strong shape by a circle in design concept, which is the simplest geometrical figure, and it provides organic relationship between the past and the present by utilizing historical elements in various ways. 5) The construction was completed through four phases including idea phase, promotion phase, turn-key contract phase, and design-build phase. The most critical factor to the success is derived from the direct contact with Involved companies from the production phase. 6) In a project facing many challenges in terms of technology, the design-build method proves to be a more effective method than turn-key contract in that it may more allocate risks and enable coherent implementation of the core concept in design. The organization for the design-build method was composed of three phases including general affairs, responsible contracting by sector, and cooperative system by sector. Since that was a new concept structure, high-level contractors who hadn't had existing cooperative relationships with one another formed new cooperative relationship, while collaborating companies who had long cooperated led the responsible contracting and sub-cooperative system, which resulted in reduction of risks and time. 7) The major factors to change design were the design characteristics, derived from a technically great combination, and the opening time. 8) A new erection method was applied to London Eye, a structure that overcame the limitation in land and period, and the process of installation demonstrated that it is an important value for the construction of a landmark in the city. 9) In spite of many visitors and tremendous operational income, the factors that London Eye fails to free itself from debts include the construction costs expended double than expected, and interest burden to the investments, which occurred in the course of procuring the costs. Absolute limit in time increased the construction costs, resulting in being a great obstacle in the course of operation.

  • PDF

실적공사비 산정시스템에 관한 연구 - 공동주택을 중심으로 - (A Study on the Construction Cost Estimating System based on Historical Data in Apartment Housing)

  • 전석한;최인성
    • 한국건축시공학회지
    • /
    • 제5권1호
    • /
    • pp.111-121
    • /
    • 2005
  • This study purposed to derive a model to estimate appropriate construction costs for the application of the estimation system based on historical construction data. For this purpose, it analyzed data ($1999\sim2004$) on the construction costs of reinforced concrete apartments (Long-Lamina-type apartments), which have been highly standardized and have a lot of relevant objective data using statistical analysis techniques and developed an estimation model.

Bayesian Model for Cost Estimation of Construction Projects

  • Kim, Sang-Yon
    • 한국건축시공학회지
    • /
    • 제11권1호
    • /
    • pp.91-99
    • /
    • 2011
  • Bayesian network is a form of probabilistic graphical model. It incorporates human reasoning to deal with sparse data availability and to determine the probabilities of uncertain cases. In this research, bayesian network is adopted to model the problem of construction project cost. General information, time, cost, and material, the four main factors dominating the characteristic of construction costs, are incorporated into the model. This research presents verify a model that were conducted to illustrate the functionality and application of a decision support system for predicting the costs. The Markov Chain Monte Carlo (MCMC) method is applied to estimate parameter distributions. Furthermore, it is shown that not all the parameters are normally distributed. In addition, cost estimates based on the Gibbs output is performed. It can enhance the decision the decision-making process.

FMEA 기법을 이용한 설계시공일괄방식 주요 클레임 요인 도출 (Identification of Claim Elements for Design Build Projects using FMEA Method)

  • 윤석민;현창택;한상원;차용운
    • 한국BIM학회 논문집
    • /
    • 제5권2호
    • /
    • pp.26-33
    • /
    • 2015
  • Design-build projects were devised to enhance the design technologies of the domestic construction industry and the efficiency of public works, contributing greatly to the development of construction technologies. However, as various stages of the process, such as formulation of basic plans and design documents, and deliberations proceed, claims, including changes in the requirements of clients, and design changes occur. These claims result in the delay in construction and an increase in construction costs. In this regard, this study attempted to identify main claims that delay construction and increase the costs of design-build projects, prevent claims in the future, and improve the efficiency of project implementation.

ATYPICAL EMPLOYMENT IN TAIWAN'S CONSTRUCTION INDUSTRY

  • C.F. Huang;J.H. Chen;J.Z. Lin
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.601-610
    • /
    • 2007
  • Responding to the fierce market competition and trying to cut personnel costs, the construction industry in Taiwan is adopting atypical employment in human resource. To discover this trend, this study employed a questionnaire survey to investigate the current use of atypical employment by domestic contractors and its possible impacts on the industry. According to the 103 returned valid questionnaires, 40.8% of the respondent contractors have applied some atypical employment types in recent three years and most of them used fixed-term employment. The major reasons the contractors used atypical employees are to reduce personnel costs, to deal with business fluctuations and to streamline personnel. According to the respondents, there is no significant difference between the advantages and disadvantages of using a large number of atypical employees in the short term. However, in the long term, atypical employment is generally more disadvantageous than advantageous.

  • PDF

MANAGERIAL AND ECONOMIC OPTIMIZATIONS FOR PREFABRICATED BUILDING SYSTEMS

  • Ahmed Abdallah
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.606-614
    • /
    • 2005
  • This paper deals with new realizations of research, scientific development, managerial and economic optimizations for prefabricated building systems. In the literature, all scientific fields are worked out based on the efficiencies, costs, benefits, choice of execution design, technical demands, aesthetical point of view, as well as the total economics. In the present example of a school-building for communities in the third world, the following criteria have been regarded: The optimal superstructure of prefabricated concrete building systems; the particularity of countries of the Third World (e.g. the climate, the political and the economic conditions); the time for construction and necessary innovative developments for an economically optimized superstructure. Added to this are alternative construction-methods and costs for a simple but variable system which can be adapted to changing functions, where variability should be the main point. For example, a school building that is to be adapted by varying number of rooms to cater for the growing number of pupils.

  • PDF