• Title/Summary/Keyword: construction cost estimation

검색결과 493건 처리시간 0.024초

실적공사비 적산방식 도입을 위한 조경공사 공종분류체계에 관한 연구 -주택단지 조경공사를 중심으로- (A Study of Landscape Construction Work Classification for System Instruction of New Estimation System based on Historical Construction data. - With regard to Housing Landscape Construction -)

  • 박원규;김두하;안동만
    • 한국조경학회지
    • /
    • 제25권1호
    • /
    • pp.82-99
    • /
    • 1997
  • The purpose of this study is to establish work classification system of landscape construction in order to offer the basis of new estimation system of public landscape construction. New estimation system is based on historical construction data. For application of this system, the standard work classification system is necessary. Because extensive cost data should be accumulated under an unified construction work classification system. In the study of new estimation system carried by KICT(Korea Institute of Construction Technology), landscaping works belong to earth work of civil engineering. It looks very unreasonable work classification, because landscape archtecture has its own specialties and professional domain. In this study, information classification systems in the construction industry and various landscaping works of housing developments are analysed. As a result. a standard work classification system of housing landscape construction is proposed in section VI-3. This standard work classification structure consists of three levels divisions (i.e large work division, middle work division, small work division) . Now in this study, housing landscape construction works are divided into four large works and twenty six middle works. According to work attributes, middle and small work division is possible to subdivide into details.

  • PDF

해상 풍력발전의 경제성 분석 (Estimation of Cost of Energy for Offshore Wind Turbines)

  • 정태영;문석준;이한민;임채환
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2010년도 추계학술대회 초록집
    • /
    • pp.177.1-177.1
    • /
    • 2010
  • Large offshore wind farms have actively been developed in order to meet the needs for wind energy since the land-based wind farms have almost been fully developed especially in Europe. The key problem for the construction of offshore wind farms may be on the high cost of energy compared to land-based ones. NREL (National Renewable Energy Laboratory) has developed a spreadsheet-based tool to estimate the cost of wind-generated electricity from both land-based and offshore wind turbines. Component formulas for various kinds and scales of wind turbines were made using available field data. Annual energy production has been estimated based on the Weibull probability distributions of wind. In this paper, this NREL estimation model is introduced and applied to the offshore wind turbines now under designing or in production in Korea, and the result is discussed.

  • PDF

The Estimation Analysis Method of the Annual Operation Cost of Korean High-rise Condominiums

  • Ko, Eun Hyung;Choi, Jun Young
    • Architectural research
    • /
    • 제7권1호
    • /
    • pp.11-18
    • /
    • 2005
  • In today's building industry the emphasis has been geared more towards construction, thus building maintenance and life cycle have been neglected until now. A direct result of this neglect is the rapid aging of building, which leads to more cost-effective decision making methods for the prolongation of building life span. The following study is conducted in the area of Daegu and Seoul in order to develop the estimation analysis method of the annual operation cost of the Korean high-rise condominiums for the cost-effective decision making support through mathematical and statistical analyses including the present value and standardized measurement corrections. Based on the assumption that the life expectancy of the high rise condominium is 50 years, initial cost is ₩421,212/$m^2$, and a total sum of yearly operation cost during life expectancy is ₩2,154,499//$m^2$), yearly accumulated operation cost is shown as below: $AOC=0.7097t^4-38.803t^3+806.95t^2+11045t-496.52$ ($R^2=0.98$) (Here, AOC = Accumulated Operation Cost, t = given years)

STUDY ON LCC ANALYSIS OF BUILDING ACCORDING TO STRUCTURES - FOCUSING ON MILITARY ESTABLISHMENTS -

  • Hyo-Joong Kim;Jung-Whan Oh ;Min Yu ;Mi-Hye Lee ;Young-Dong Yu ;Tae-Keun Park
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1187-1192
    • /
    • 2005
  • Approximately 25% of military establishments became superannuated to unable perform their function, and it influences on the environment by construction wastes and the waste of national budget, as there is no rational and objective standard even though old facilities have been replaced through modernization project. Therefore, it has been searched to introduce industrial building system that can cope with the new building-construction and transference for the improvement of existing military establishments. However, as there is no economical estimation standard for practical use, industrial building-construction is still remaining at the initial stage, and the study is insufficient too. So. in this study, I would like to develope LCC cost model for rational LCC comparative analysis between industrial construction system (Modular) and existing reinforced concrete structure and cage, and to evaluate economical efficiency through case analysis.

  • PDF

철근콘크리트골조 BIM기반 수량산출 및 견적 가이드라인 수립 (BIM-Based Quantity Takeoff and Cost Estimation Guidelines for Reinforced Concrete Structures)

  • 주선우;김치경;김시욱;노준오
    • 한국전산구조공학회논문집
    • /
    • 제30권6호
    • /
    • pp.567-576
    • /
    • 2017
  • 본 연구는 BIM 도입 효과를 극대화할 수 있는 현장 적용성 확보에 중점을 둔 철근콘크리트 골조공사의 BIM 견적모델 작성과 BIM기반 견적 업무 프로세스를 표준화한 가이드라인을 제시하는 것을 목적으로 한다. 이를 위하여 기존 지침 및 가이드라인의 BIM 견적모델 작성 범위 및 방식을 고찰하고, 철근콘크리트공사 수량산출 견적 지침 및 기준을 분석하며, 기존 견적 방식과 BIM기반 견적 방식에 대해 비교분석한다. 이를 통하여 BIM기반 견적 업무의 표준 프로세스를 수립하고, 콘크리트/거푸집/철근 견적모델의 작성 및 수량산출 기준을 도출하며, 철근콘크리트공사 BIM기반 수량산출 및 견적 업무의 성과물 목록 및 양식을 제시한다. 본 연구를 통해 작성된 BIM 견적 가이드라인은 BIM기반의 새로운 기술환경에 대한 진입장벽을 낮추고, 견적의 정확성 극대화를 통한 원가절감을 실현하며, BIM 업무와 건설산업의 생산성과 부가가치를 증대시켜, 궁극적으로 건설사업 전 생애주기에서 생산되는 정보를 통합 관리할 수 있는 기반을 구축하고 BIM 생태계를 조성하는데 기여할 것으로 기대한다.

초고층 커튼월 공정관리 최적화를 위한 건설성능 데이터 표준화 (Data Standardization of Construction Performance for Optimized Process Management in High-rise Curtain-wall Operations)

  • 이태희;고용호;김영석;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.283-284
    • /
    • 2012
  • High-rise building construction has been increasing for the recent years and the construction process has become more complicated. This suggests a need for precise planning based on reliable data to prevent cost overruns and delays. However, the process planning is implemented based mainly on the experience of engineers that can result in critical damage in cost and time. Accurate productivity estimation and unit cost analysis must be considered important matter to prevent such disaster. This study estimates productivity and unit cost of curtain wall operations in high-rise building construction by simulation techniques and statistical methodologies. This study suggests a decision making methodology for the site personnel that enables to compare various combinations of productivity and unit cost based on reliable data that has been collected in actual construction sites. It is expected that this study contributes to the following research of developing an optimized construction performance assembling model for the site personnel.

  • PDF

CM 대가 산정방식의 문제점 분석에 대한 연구 -문화예술회관 사례를 중심으로- (Diagnostic Analysis and Influential Factors of CM Fee Estimation)

  • 유병기;정찬영;김재준
    • 한국건설관리학회논문집
    • /
    • 제7권6호
    • /
    • pp.132-140
    • /
    • 2006
  • 1996년 12월 정부에서는 국내 건설산업의 효율성을 높이기 위하여 건설사업관리(CM) 제도를 처음 도입하게 되었다. 그러나, CM의 필요성을 인식하면서도 건설사업 초기단계에서 예상되는 문제점 및 낭비요소의 최소화와 객관적인 기술검토 등을 통한 의사결정능력은 향상되었지만, 발주자의 선택권이 보장되는 다양한 CM 서비스체계 구축과 CM대가 산정에는 많은 문제점이 존재한다. 정부가 발주하는 공공건설사업의 경우 발주자가 산정하는 방식과 CM업체가 산정하는 방식의 차이로 인해서 적정대가를 받지 못해 CM대가 산정이 제대로 이루어지지 않는다. 따라서, 본 논문에서는 실제 공공건설사업 중에서 문화예술회관 사례를 토대로 CM대가 산정에 대해 공사비비율에 의한 방식, 실비정액가산방식의 실제 계약된 금액을 다각도로 분석하여 어떤 불합리성이 존재하며, 아울러 그 원인은 무엇인지에 대해 분석하고자 한다. 이를 토대로 향후 CM의 적정대가 산정기준을 위한 연구의 자료에 일조를 하고자 한다.

AN APPROACH FOR ESTIMATING TOTAL COST OF OCCUPATIONAL SAFETY FOR BUILDING CONSTRUCTIONS

  • Gurkan Emre Gurcanli;Nesimi Teoman Korkutan;Ugur Mungen
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.168-175
    • /
    • 2011
  • Construction accidents are major problem in Turkish Construction industry and especially fatally rates are very high. Current legislative system on occupational safety in Turkey enforces employers to implement safety measures as well as safety management systems. However level of consciousness in the industry is unsatisfactory and safety are perceived as extra cost and unnecessary expenditure. Moreover, especially in small residential building constructions which have a big share in the industry and unfortunately safety measures to mitigate or abate construction risks do not exist. The study focuses on small residential building construction sites and in the scope of this study, thirty building projects are examined. For each building project, project cost including labour and material costs, service and consultancy costs for mechanical, electrical systems as well as architectural and structural services, costs for supervision and finally general expenditures for construction site facilities were calculated. On the other hand, occupational safety costs for personal protective equipment, collective protective measures, consultancy and training were determined. Work breakdown structures were established and for each work item firstly occupational risks were evaluated and furthermore according to risk scores safety measures to be implemented were defined and related costs were calculated. The study gave results for total safety cost on average, in terms of percentage of total project cost (3.73% of total project cost), safety cost per man-hour (0.40 USD) and safety cost in terms of unit construction area (11.60 USD per square meter). Since safety management is a part of whole project management process, study gives suggestions and techniques to calculate safety costs and implement safety measures as a part of project management service for professionals. Authors believe that suggested approach may easily developed by the usage of more data to establish a model for estimation not only for building construction sites but also for all construction projects.

  • PDF

임대실태 분석을 통한 건설기계경비 산정시스템 개발 (Development of Cost Estimate System of Construction Equipment through Analysing Its Domestic Rental Market)

  • 안방률;태용호;서상욱;허영기
    • 한국건설관리학회논문집
    • /
    • 제13권6호
    • /
    • pp.121-132
    • /
    • 2012
  • 건설공사 예정가격을 산정하는데 사용되는 표준품셈의 기계경비산정시스템은 종합건설업자가 직접 장비를 보유하여 운영한 60년대초에 기계손료 및 운전경비를 근거로 산정토록 제정되어, 대부분의 건설기계가 시공업체의 직접운영 보다는 장비임대업체를 통하여 임대 형태로 현장에 투입되고 있는 현재의 건설산업 운영실태를 반영하지 못하고 있는 실정이다. 본 연구에서는 실제 현장에서 운용되고 있는 건설기계의 임대단가를 실적자료로 활용하기 위해 반드시 필요한 사용자 편익을 고려한 현실적인 건설기계경비 산정시스템을 개발하였다. 이를 위해 대표적인 건설기계 7기종 9규격(굴삭기 무한궤도($0.2m^3$), 굴삭기 타이어($1.0m^3$), 덤프트럭(15ton, 25ton), 진동롤러(자주식 4.4ton), 크레인 무한궤도(50ton, 300ton), 아스팔트피니셔(3m), 콘크리트펌프카($80m^3/hr$))을 선정하고 전국 217개 임대사업체 및 건축 토목현장 11곳을 대상으로 지역별 및 임대유형별 임대료를 현장방문 및 면담을 통해 조사 분석하였다. 임대기반 건설기계경비 산정시스템은 사용자가 건설기계의 종류, 규격 및 임대유형을 선택하여 해당 기계의 전체지역 평균 임대료 및 각 지역별 임대료를 편리하게 열람 할 수 있도록 기반을 제공함으로써 건설공사 예정가격산정기준 및 관련 연구의 기초가 될 수 있으리라 기대한다.

비정형 콘크리트 패널의 수학적 알고리즘을 이용한 생산-설치 데이터 생성모델 기초연구 (A Basic Study on Data Estimation Model of Production-installation Using Mathematical Algorithm in Free-Form Concrete Panel)

  • 손승현;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.166-167
    • /
    • 2016
  • Unlike the past, supported by the development of digital technologies, free-form buildings are frequently designed with creative thoughts of architectural designers. However, there are some difficulties preventing successfully completion of projects, like reduced productivity and increased construction duration and cost upon the process of producing and installing concrete panels for free-form structures. In particular, there are active studies on the CNC machine for production of free-form concrete panels. Yet, it is difficult to effectively and easily come up with information on production and installation of free-form, curve-surfaced panels which are difficult to be mathematically defined. This requires a lot of manpower and time to implement the curved surfaces of free-form buildings as intended by architects. Accordingly, it needs a model that can effectively create production-installation data of free-form concrete panels for successful free-form building projects. Thus, the purpose of the study is to suggest data estimation model of production-installation using mathematical algorithm in free-form concrete panels. The study results will realize effective production and installation of free-form concrete members, allowing improved productivity of projects, reduced cost and shortened construction duration.

  • PDF