International conference on construction engineering and project management
/
2005.10a
/
pp.1208-1211
/
2005
The design phase has a great influence on the success of subsequent phases in the project which can be connected with the success of the overall project. Several studies have focused on the effective design management. However, it is too complicated and difficult to manage the design process for the reason that it has a lot of participants and design information and consists of thousands of decisions by an architect alone. Accordingly, it is the main issue for the success of the project how well the design phase be organized and managed. In recent, even in domestic, the importance of design phase has begun to be referred in the conferences. Lean Construction also has a close look at those issues and makes ready to apply specific management methods, called to Lean Design & Construction. Managers can consider a variety of uncertainties to be under control through making the overall process effectively from the early stage. By establishing the efficient process from the design phase before the construction phase, managers can result in a desirable productivity. The aim of this study is to bring the concept (Lean Design & Construction) in domestic design circumstances and verifies the possibility how to apply the concept to the design phase.
Welding is a significant part of the construction industry. Since most high-rise building construction structures rely on a robust metal frame welded together, welding defect can damage welded structures and is critical to safety and quality. Despite its importance and heavy usage in construction, the labor shortage of welders has been a continuous challenge to the construction industry. To deal with the labor shortage, the ultimate goal of this study is to design and develop an automated robotic welding system composed of a welding machine, unmanned ground vehicle (UGV), robotic arm, and visual sensors. This paper proposes and focuses on automated weaving using the robotic arm. For automated welding operation, a microcontroller is used to control the switch and is added to a welding torch by physically modifying the hardware. Varying weave patterns are mathematically programmed. The automated weaving is tested using a brush pen and a ballpoint pen to clearly see the patterns and detect any changes in vertical forces by the arm during weaving. The results show that the weave patterns have sufficiently high consistency and precision to be used in the actual welding. Lastly, actual welding was performed, and the results are presented.
Proceedings of the Korean Institute of Building Construction Conference
/
2021.11a
/
pp.200-201
/
2021
According to the dispute cases filed for claiming the collective defect repair fees, inter-layer concrete joints turned out to be the most frequently disputed item. For this reason, this study selects the inter-layer concrete joints to further analyze the primary causes and details of each dispute case. From the results of this study, three primary causes of the disputes are found, which are 1) the absence of standard specifications for construction quality control and management after construction; 2) the absence of established standards for repair when construction defects are found. In order to prevent construction defects in inter-layer concrete joints, this study provides three suggestions including 1) the current standard specifications for inter-layer concrete joints should be further specified by the Ministry of Land, Infrastructure and Transport; 2) a construction defect should be judged according to the compliance to the standard specifications; and 3) a clear and institutional protocol needs to be established for defect repair in cases that new public apartment houses have been judged to have defects.
Kim, Hyeon Seung;Shin, Jong Myeong;Park, Sang Mi;Kang, Leen Seok
International conference on construction engineering and project management
/
2015.10a
/
pp.344-348
/
2015
The image data of the web camera is used to identify the construction status of the site in a remote office and it can be used for safety management. This study develops a construction schedule simulation system based on the active nD object linked with real image data of web camera from the construction site. The progress control method by 4D object uses a method that the progress of each activity is represented with different colors by progress status. Since this method is still based on a virtual reality object, it is less realistic description for practical engineers. Therefore, in order to take advantage of BIM more realistic, the real image of actual construction status and 4D object of planned schedule in a data date should be compared in a screen simultaneously. Those methodologies and developed system are verified in a case project where a web camera is installed for the verification of the system.
International conference on construction engineering and project management
/
2024.07a
/
pp.1104-1111
/
2024
In recent years, the development of digital design methods and structural analysis has made it possible to design complex building shapes. However, the construction of such buildings requires advanced knowledge of production, interaction with actual craftsmen, and verification of construction methods through mock-ups. Despite this, however, design education in Japanese universities is often limited to proposals at the predesign and schematic design stages, and students have few opportunities to study the design development and construction stages. However, in recent years, computer numerical control (CNC) machine tools have become relatively inexpensive and can be handled easily, even by beginners. Therefore, practical training programs intended to familiarize students with manufacturing techniques using such machines are becoming increasingly popular at Japanese universities. This paper reports on the content of a practical training program intended to provide students with practical experience from production to design in the field of manufacturing by using CNC machine tools and other digital fabrication equipment to create a mock-up of a complex curved surface for a building and simulate the process of construction production in the design development and construction management. It is difficult to create curved surfaces using only digital fabrication, and manual processes, such as bending wooden boards along curved surfaces, are required. Therefore, students were required to combine digital fabrication knowledge with hands-on manufacturing skills, including hand-bending and experiential learning, which helped students think about the necessary processes for constructing the shapes they designed.
Recently, concrete structures with carbon fiber reinforced polymer (CFRP) reinforcements have been commonly used for the bridge and building construction. In this paper, pier caps were strengthened by prestressed near surface mounted CFRP. To verify the effectiveness of the strengthening method, 7 pier cap specimens were fabricated. One specimen was designed for control, two for external prestressing steel strands, two for CFRP plates, and two for CFRP bars. Experimental variables consist of type of reinforcement materials and prestressing levels. The results of laboratory have shown that the ultimate load capacities of prestressed near surface mounted CFRP specimens were about $20{\sim}33%$ greater than that of a control specimen. Also, ultimate load capacities of prestressed near surface mounted CFRP specimens were similar to those of external prestressing specimens with steel strands.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.444-447
/
2006
Construction managers need to pay a close attention to the resource utilization in order to deliver the construction project successfully. Construction scheduling is crucial for resource control in that it provides information when and how much to bring down work force to sites. In scheduling, activity duration is projected based on the productivity of historical data or the intuition of scheduler. This paper studies the opportunity of applying cost-based productivity for estimating activity duration. For cost-based productivity, the cost of resource is used as an input and the work quantities as an output. Out of historical data, regression model has been developed to understand the validity of applying cost-based productivity in projecting activity duration. The result of study will work as a prerequisite for implementing the environment of database-based construction scheduling.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.449-454
/
2008
The purpose of this study is to analyze, applications of the construction management delivery systems according to characteristics of facilities. The adapted research method is to selected four mall in the capital region and then divided them into two groups: CM for Fee or CM at Risk. After analyze each applications and administrations, it could propose proper applications of CM for fee according to CM at Risk. The results of this study are as follows: 1) the CM for Fee was suitable for the projects focused on completing on time and constructing the effective business plan of quality control, and 2) the CM at Risk was suitable for the projects concentrated on the cost reduction through shorten the construction time and the related businesses on quality control.
Ha, Ju-Hyung;Cho, Yun-Gu;Hyun, Tae-Yang;Lim, Chang-Keun;Seo, Tae-Seok
Journal of the Korea Concrete Institute
/
v.25
no.2
/
pp.195-200
/
2013
New thermal crack control system for mass concrete was developed to increase quality and to save construction period and cost. The principle of this system is that the curing water having proper temperature is supplied automatically to the surface of mass concrete member to keep the temperature difference between center and surface of concrete less than generally recommended temperature difference ($20^{\circ}C$). Mock-up test was conducted to investigate the validity of newly developed curing system. As a result, no crack was founded in the specimen using automated curing system developed in this study, while many cracks occurred in another specimen without automated curing system. It was also confirmed that the strength and the durability of the concrete cured by automated curing system were improved.
Kim, Soung-Jik;Kim, Tae-Hui;Min, Kyung-Seok;Kim, Ok-Gyu;Kim, Chan-Kyu
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.495-498
/
2007
The latest parceling-out price upper limit ancestor memorial service enforcement, Sale in lots circle is elated interest of society each floor for construction working expenses by open etc. but private investment law for society basis facilities, because circle that is presenting in parceling-out price upper limit ancestor memorial service back is different system (configuration item), cross is expected. A lot of study results connected with cost control expense arbor in the mountains etc. were presented until present, but persistent DB expulsion prohibition. Cost information is standardization unpreparedness of system. It is real condition that is hoarded since research and development by practical use plan presentation unpreparedness etc. Therefore, in this study, desire does actual date use plan presentation by purpose through DB construction after process by information form of good quality so that can collects efficiently and manages and utilizes at construction production step flag firm' s results data which is achieved. Can utilize to data of tool development that maximize ultimately comprehension about employer' s business and business order ability through persuasion, and diverts in cost control business hereafter.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.