• Title/Summary/Keyword: construction control

Search Result 5,207, Processing Time 0.033 seconds

A study on installation location of radar for minimizing blind area in the construction of VTS system of Kangjeong Port (강정항 VTS 시스템 구축시 음영구역 최소화를 위한 레이더의 위치설정에 관한 연구)

  • LEE, Seung-Hi;KIM, Kwang-Il;AHN, Jang-young;LEE, Chang-Heon;CHOI, Chan-Moon
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.53 no.2
    • /
    • pp.187-195
    • /
    • 2017
  • We have studied the efficient operation of the radar and the appropriateness of the installation location, when constructing the VTS system. As the Civil-Military Complex Harbour (Kangjeong Port) is completed in 2016, we set the control area within 10 nautical miles centering on Kangjeong Port, and found out and removed the operational radar blind area of VTS system to provide safe navigation information for vessels that navigating this area. Assuming that two international cruise ships entering at the same time, we performed the radar simulation and compared the images by considering the three sites of Kangjeong Port, Miaksan and Seoguipo Port. Simulation results for a single radar installed at Kangjung Port indicate that the blind area was largely affected by two large cruise ships and the surrounding islands. The blind area due to Kogunsan was considerably large when installed in Miaksan, but the blind area due to the influences of Beomseom, Moonseom and Seopseom was negligibly large. It seems that additional radar installation is necessary as a complementary solution to solve this blind area. When two radars were installed at Miaksan and Kangjeong Port, the residual blind area due to the Seopseom was $0.25km^2$ at 0.1~0.33 nautical miles in the southeast direction from Seopseom. In addition, the remaining blind area with two cruise ships mutually influenced was $0.18km^2$, which did not occur with a single cruise ship.

Analysis of the Working Conditions of Screen Fire Shutters in the Goyang Bus Terminal Fire (고양종합터미널화재 시 스크린방화셔터의 작동실태 분석)

  • Lee, Eui-Pyeong
    • Fire Science and Engineering
    • /
    • v.32 no.2
    • /
    • pp.82-91
    • /
    • 2018
  • This study analyzed the working conditions and problems of screen fire shutters in the Goyang Bus Terminal fire based on the fire investigation results. At that time, screen fire shutters in the 1st basement, which was under construction, did not work because the power was shut off. Four screen fire shutters in the 1st and 3rd floor did not work despite the power not being shut off. The following problems related to a screen fire shutter were found: shutting off the power to screen fire shutters for the fire compartment on each floor, even when the fire compartments were changed in each area; installing an integral type screen fire shutter without any regulations, installing a two-stage screen fire shutter in a place not related to obstacles during evacuation; stopping the function of the screen fire shutters for a fire compartment on each floor after a combustible sandwich panel was comparted; installing a screen fire shutter over 10 meters in width, in which its performance was not verified; and no safety control standards for reinstalling or maintaining a screen fire shutter.

Construction of New Transfer Vector of Nuclear Polyhedrosis Virus of the Silkworm, Bombyx mori (누에 핵다각체병 바이러스를 이용한 새로운 전이 벡터의 제작)

  • 우수동;김우진;진병래;강석권
    • Journal of Sericultural and Entomological Science
    • /
    • v.37 no.1
    • /
    • pp.46-51
    • /
    • 1995
  • In order to develope baculovirus expression vector system, we constructed new transfer vector of nuclear polyhedrosis virus of the silkworm, Bombyx mori. The promoter region containing only adenine of translation start codon of polyhedrin gene was cloned by polymerase chain reaction technique. And the 5' and 3' leader regions of polyhedrin gene was sequentially cloned. The polyhedrin coding gene was deleted from the +2 to the +597 position. As the result, we constructed new transfer vector which has EcoRI, SacI and KpnI sites for the cloning sites of foreign gene. New transfer vector was named as pBmKSKl. Escherichia coli $\beta$-galactosidase gene as foreign gene was inserted into pBmKSKl, under the control of the polyhedrin promoter and expressed in B. mori cells. The result showed that the new transfer vector pBmKSK1 is functional.

  • PDF

A Study of Fatigue Crack Growth Behaviour for Ferrite-Bainite Dual Phase Steel (Ferrite-Bainite dual phase 강의 피로균열진전 특성 평가)

  • Kim, Deok-Geun;Cho, Dong-Pil;Oh, Dong-Jin;Kim, Myung-Hyun
    • Journal of Welding and Joining
    • /
    • v.34 no.1
    • /
    • pp.41-46
    • /
    • 2016
  • With the recent increase in size of ships and offshore structures, there are more demand for thicker plates. As the thickness increases, it is known that fatigue life of the structures decrease. To improve the fatigue life, post weld treatments techniques, such as toe grinding, TIG dressing and hammer peening, are typically employed. However, these techniques require additional construction time and production cost. Therefore, it is of crucial interest steels with longer fatigue crack growth life compared to conventional steels. This study investigates fatigue crack growth rate (FCGR) behaviours of conventional EH36 steel and Ferrite-Bainite dual phase EH36 steel (F-B steel). F-B steel is known to have improved fatigue performance associated with the existence of two different phases. Ferrite-Bainite dual phase microstructures are obtained by special thermo mechanical control process (TMCP). FCGR behaviours are investigated by a series of constant stress-controlled FCGR tests. Considering all test conditions (ambient, low temperature, high stress ratio), it is shown that FCGR of F-B steel is slower than that of conventional EH36 steel. From the tensile tests and impact tests, F-B steel exhibits higher values of strength and impact energy leading to slower FCGR.

Development and Application of Integrated System with SATEEC, nLS and USPED for Gully Erosion Evaluation (걸리 침식 평가를 위한 SATEEC, nLS, USPED 연계 시스템의 개발 및 적용)

  • Kang, Hyunwoo;Park, Youn Shik;Kim, Nam Won;Ok, Yong Sik;Jang, Won Seok;Ryu, Ji Chul;Kim, Ki-Sung;Lim, Kyoung Jae
    • Journal of Korean Society on Water Environment
    • /
    • v.26 no.4
    • /
    • pp.637-647
    • /
    • 2010
  • The Universal Soil Loss Equation (USLE)-based modeling systems have been widely used to simulate soil erosion studies. However the GIS-based USLE modeling systems have limitation in gully erosion evaluation which is one of the most important factor in soil erosion estimation. In this study, the integrated soil erosion evaluation system using with Sediment Assessment Tool for Effective Erosion Control (SATEEC) system, nLS and Unit Stream Power-based Erosion/Deposition (USPED) model was developed to simulate gully erosion. Gully head location using nLS model, USPED for gully erosion, and the SATEEC estimated sheet and rill erosion were evaluated and combined together with the integrated soil erosion evaluation system. This system was applied to the Haean-myeon watershed, annual average sediment-yield considering sheet, rill and gully erosion was simulated as 101,933 ton/year at the study watershed. if the integrated soil erosion evaluation system is calibrated and validated with the measured data, this system could be efficiently used in developing site-specific soil erosion best management system to reduce soil erosion and muddy water inflow into the receiving waterbody.

A Study of Cutting Method of H-Pile for Explosive Demolition of SRC Structure (철골구조물 발파해체를 위한 H형강 절단방법에 대한 연구)

  • Min Hyung-Dong;Lee Yun-Jae;Song Young-Suk;Kim Hyo-Jin
    • Explosives and Blasting
    • /
    • v.23 no.3
    • /
    • pp.83-89
    • /
    • 2005
  • It follows in deterioration of the steel frame structure and becomes remodeling and removal. The construction work characteristic, economical efficiency and stability environment characteristic are planned and considered hereafter control plan of the steel frame structure which is deteriorated currently to cutting mettled plentifully sued on gas cutting of H beam. However it will not be able to apply from the explosives demolition which is makes a weak instantaneously and then collapses the building at the time. In this study, shape charge was used for cutting of the H-beam. That is the element testing to estimate explosives demolition for steel frame structure. As a result, it is found for single-side rutting method, both-sides rutting methods by H-beam thickness and pre-rutting process. It confirmed an affix method and an ease characteristic by fixing tool. Also, it is shown that air blasting decreased about 8dB(A) in order to reduce air blasting used by sand box. However, it will be required to reduce air blasting little more because explosives demolition will be done in urban site.

Redundancy operation method for a distributed public address system (분산형 전관방송 시스템의 이중화 운영 방법)

  • Ryu, Taeha;Kim, Seungcheon
    • Journal of the Korea Convergence Society
    • /
    • v.11 no.8
    • /
    • pp.47-53
    • /
    • 2020
  • In the case of a failure due to equipment deterioration in the public address system or a worker's mistake during construction, broadcasting becomes impossible. In this situation, we have designed a more advanced management broadcast system that can broadcast. The broadcasting service is operated using main broadcasting device, and local broadcasting device operates separately only in the local area. If the main broadcasting device becomes inoperable, the procedure for transferring the control activates the device with the local broadcasting devices based on data backed up by the main controller. This paper proposes an improved method of the conventional emergency broadcasting device duplication method. The existing method could not use the standby equipment in the normal state, but in the proposed method, the standby equipment can be used as local broadcasting equipment in usually. This method enables stable system operation while minimizing resource waste due to redundant configuration of expensive devices.

Construction of Expert Service for GPS Relative Positioning Data Processing (GPS 상대측위 자료처리를 위한 전문가 서비스 구축)

  • Park, Joon-Kyu;Kim, Min-Gyu;Lee, Jong-Sin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.5
    • /
    • pp.2481-2486
    • /
    • 2013
  • It requires a lot of time and effort for general users who do not have enough understanding of GPS to properly processing GPS data. However, the GPS data processing field heavily relies on foreign-produced software and there is almost no development of user-oriented technology. Therefore, in this study, it was attempted to build an expert service that enables non-experts to use high-precision GPS data processing. As a result, an expert service that can maximize user convenience simply by entering the minimum required information for GPS data processing was developed, and the expert service was verified by relative positioning processing of the observation data of satellite control point provided by National Geographic Information Institute and observation data obtained by GPS survey. The expert service significantly reduces the effort and time for processing GPS data, which will contribute to precise positioning and other various studies.

The Calculation of Illuminance Distribution in Complex Interior using Montecarlo Simulation (몬테카를로 시뮬레이션을 이용한 다면 공간의 조도계산)

  • Kim, Hee-Chul;Chee, Chul-Kon;Kim, Hoon
    • The Proceedings of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.7 no.6
    • /
    • pp.27-33
    • /
    • 1993
  • In order to improve complicated construction and complex control which are didvantage of optimal PWM technique aimed at harmonic elimination method, this paper presented MRA(Mode1 Reference Adaptive) PWM technique that gating signal of inverter is generated by comparing the reference signal with the induced feedback signal at the reference model of load. Design of controller is composed of microprocessor and analog circuit. MRA PWM technique used in the paper is able to compensate the degradation of voltage efficiency to be generated by the ratio of the output voltage to the DC supply voltage being low for using conventional sinusoidal PWM technique. When the trapezoidal signal is employed as the reference signal. the low order harmonics of line current can be reduced and the switching pattern is made by on-line computation using comparatively simple numerical analysis.

  • PDF

A Study on The MRA PWM Technique Using the Trapezoidal Waveform at Voltage Source Inverter(VSDI) (전압형 인버터(VSI)에서 사다리꼴파형을 이용한 MRA PWM 기법에 관한 연구)

  • 한완옥;원영진;이성백
    • The Proceedings of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.7 no.2
    • /
    • pp.36-40
    • /
    • 1993
  • In order to improve complicated construction and complex control which are disadvantage of optimal PWM technique aimed at harmonic elimination method, this paper presented MRA(Model Reference Adaptive) PWM technique that gatmg signal of inverter is generated by comparing the reference signal with the induced feedback signal at the reference model of load. Design of controller is composed of microprocessor and analog circuit. MRA PWM technique used in the paper is able to compensate the degradation of voltage efficiency to be generated by the ratio of the output voltage to the DC supply voltage being low for using conventional sinusoidal PWM technique. When the trapezoidal signal is employed as the reference signal. the low order harmonics of line current can be reduced and the switching pattern is made by on-line computation using comparatively simple numerical analysis.

  • PDF