• Title/Summary/Keyword: construction communication

Search Result 1,774, Processing Time 0.026 seconds

A Basic Study on the Correlation Analysis between Safety Perception Level of Domestic Construction Companies and Construction Productivity (국내 건설기업의 안전인식수준과 건설생산성간의 상관관계 분석 기초연구)

  • Jeon, Sang-Sub;Oh, Jun-Seok;Son, Seung-Hyun;Son, Ki-Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.47-48
    • /
    • 2019
  • Currently, the government has made a lot of efforts to improve construction productivity but there are few studies which measure between safety perception level and productivity in the South Korean construction industry. Therefore, the objective of this study is to analyze correlation between safety perception level of domestic construction companies and construction productivity. To achieve the objective, first, the concept of safety perception level was defined. Second, the safety perception level and construction productivity were investigated in the case projects. Third, correlation analysis was conducted between safety perception level and productivity. As a result, it was concluded that a high level of safety perception of executive and manager would increase construction productivity. In addition, To improve the safety perception level in the construction company, it is suggested that the provision safety resources for managements and the equal communication system between workers and managements and the development safety education tools considering the worker's experience. In the future, these findings can be utilized to develop future evaluation tools for a safety perception level in domestic construction company.

  • PDF

Information-based Smart Construction Management of High Rise Building Under the Complex Surrounding Environment in City Core Area

  • Liang, Haoqing;Li, Jian;Song, Weiqing
    • International Journal of High-Rise Buildings
    • /
    • v.10 no.3
    • /
    • pp.203-210
    • /
    • 2021
  • With the development of urbanization, the increasing of buildings density in urban core areas result in the complexity of construction environment. High-rise landmark building is always preferred in the construction of urban core areas. Super high-rise buildings construction are facing construction management difficulties due to the complex working conditions and enormous building system, especially with the complex surrounding environment of the urban core area, the construction management of super high-rise buildings in the area requires higher, refined and detailed standard. Based on a super high-rise project in a core area of Shanghai which has 370 m building height and 772,643 m2 building area, with complex surrounding environment, narrow construction site and many super-high-altitude crossing works. With the application of BIM technology, the Internet of Things, the LAN communication and other various intelligent mechanical equipment, information management systems, the efficiency and refinement of construction management are improved, ensuring the smooth implementation of the project while effectively controlling the impact on the surrounding environment.

A Construction Supply Chain Management Process with RFID/WSN-based Logistics Equipment

  • Shin, Tae-Hong;Yoon, Su-Won;Chin, Sangyoon
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.4
    • /
    • pp.11-19
    • /
    • 2012
  • Construction supply chain management (CSCM) has become one of the critical factors that determine the success of a construction project as it becomes increasingly complicated and mega-sized. Particularly for high-rise or mega-sized building construction, just-in-time supply chain management is required due to lack of storage space and effective logistics for construction components and materials at a construction site. Despite the fact that research and development of radio frequency identification (RFID) and wireless sensor network (WSN) technology have been performed, construction project managers still need to carry mobile devices and check material and component flow at each stage of the supply chain process. This research proposes that the equipment used in the construction supply chain process, such as movers, trailers, gates, and hoists, can become main actors in the supply chain process using RFID and WSN technologies. And the proposed equipment and process focused on a solution to the redundancy identification problem, which has been observed in operations that use RFID/WSN-based processes for construction logistics. This paper also presents issues identified through verification and validation of the research results and proposes further studies.

Design and Construction Problems of Semi-Shield Method (SEMI-SHIELD 공법의 설계 및 시공상 문제점)

  • Kim, Jong-In;Jung, Sung-Nam;Park, Yeong-Geon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.1275-1282
    • /
    • 2009
  • The tunnel excavations are used for construction of common utility tunnel, electric tunnel, communication line tunnel, water supply and public sewerage pile line in urban area. The trench cut methods were mainly used in the past, but now, tunneling method is more being used. The tunnel excavation method like as NATM, Messer-Shield, Semi-Shield Methods are being applied to small section tunnel in Korea. The actual construction results of seme-shield method are increasing due to simplified construction process and reduced noise and vibration. And also this method is being used frequently in waterway tunnel and construction of prevention flooding recently. The seme-shield method design guideline is absence except for electric line tunnel construction in Korea, because of the semi-shield method was developed in Europe and Japan. In the prescriptive design, engineer's subjects are tending to intervene, because of absence of standard and specification for details. Therefore, Design and Construction Problems of Semi-Shield Method were described and construction trouble was introduced for exam. These problem and construction troubles have to be examined thoroughly in advance.

  • PDF

RFID System with Localization Function Based on Zigbee RSSI (Zigbee RSSI 기반의 위치추정 기능을 탑재한 RFID 시스템)

  • Kim, Tae-Yun;Hwang, Suk-Seung
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.11 no.12
    • /
    • pp.1201-1208
    • /
    • 2016
  • Radio Frequency Identification (RFID) technology has a significant attraction throughout various industry sites, along with the development of wireless communication technologies. The typical applications of RFID include medical, logistics, and distribution, and, specially, it is effectively applied to non-contact environments, because it employs radio waves. Although, recently, construction cases of the RFID management systems for the inventory management of the construction materials have been increased, the related researches and experiments for the reused materials are not actively performed. In this paper, we propose the RFID system with the localization function for effectively managing the reuse of the construction materials, adding to the conventional inventory management system. The proposed system consists of a RFID reader unit and a receiver unit, and the location information of the material with the attached RFID tag is obtained by estimating the position of a RFID reader. The distance value for estimating the reader position is calculated using the Received Signal Strength Indicator (RSSI) value of Zigbee, and the performance evaluation of the proposed system is performed in the indoor space of $5m{\times}5m$.

The Present Status and Future of Disaster Safety Communication Network (재난안전통신망의 현황과 미래)

  • Hong, Sung-Hwa;Lee, Seong-Real
    • Journal of Advanced Navigation Technology
    • /
    • v.24 no.2
    • /
    • pp.115-120
    • /
    • 2020
  • PS-LTE, which is mentioned as a next-generation disaster network technology, is a communication technology that supports communication between terminals and group communication necessary for public safety communication based on LTE technology. Currently, Korea is establishing a PS-LTE network construction plan and installing a PS-LTE system. The world is currently making a lot of efforts to build a disaster network system using PS-LTE. However, due to the characteristics of the closed network that only the related persons can access, it can not be operated like the existing commercial network, so it is necessary to build a new network. And it is expected that many periods and costs will be required. In order to establish a disaster safety communication network efficiently, it is necessary to consider the linkage of PS-LTE network, which is newly constructed by complementing the problems such as security and access priority to existing LTE network rather than unconditional new construction.

Construction Status and Proposal for Information Communication Facility of Childcare Center -After COVID19, focusing on IT Technology Utilization- (어린이집 정보통신설비 구축현황 및 제안 -COVID19 이후 IT기술활용 중심으로-)

  • Lee, Jae-Yong;Shin, Seung-Jung
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.20 no.4
    • /
    • pp.43-50
    • /
    • 2020
  • The purpose of this study is to examine the case of constructing information and communication facilities in daycare centers and to propose an educational environment that can foster young talents who can lead the era of the fourth industrial revolution. In particular, after COVID19, a method was proposed to create an information and communication environment suitable for children to receive personalized education, and to create an environment for experiential education if possible, and at the same time to enable averaging of customized learning. Since there has been no research on information and communication facilities in daycare centers, we intend to place significance on starting, and in the future, to foster creative and contextual children, we will reduce the movement of teachers through smart speakers and mobile devices, and tailor the educational environment through AI data. I think that the design of the daycare center should be changed in the direction of making the product. To this end, the CM role of information and communication supervision is needed, and it is hoped that it will become a design standard for daycare centers after COVID19 by developing research on daycare centers.

Rapid Self-Configuration and Optimization of Mobile Communication Network Base Station using Artificial Intelligent and SON Technology (인공지능과 자율운용 기술을 이용한 긴급형 이동통신 기지국 자율설정 및 최적화)

  • Kim, Jaejeong;Lee, Heejun;Ji, Seunghwan
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.26 no.9
    • /
    • pp.1357-1366
    • /
    • 2022
  • It is important to quickly and accurately build a disaster network or tactical mobile communication network adapting to the field. In configuring the traditional wireless communication systems, the parameters of the base station are set through cell planning. However, for cell planning, information on the environment must be established in advance. If parameters which are not appropriate for the field are used, because they are not reflected in cell planning, additional optimization must be carried out to solve problems and improve performance after network construction. In this paper, we present a rapid mobile communication network construction and optimization method using artificial intelligence and SON technologies in mobile communication base stations. After automatically setting the base station parameters using the CNN model that classifies the terrain with path loss prediction through the DNN model from the location of the base station and the measurement information, the path loss model enables continuous overage/capacity optimization.

An Optimized Construction of Telecommunication Network for Train Control (열차제어를 위한 무선통신 네트워크 최적화 구축 기법)

  • Kim, Jong-Ki;Choi, Kyu-Hyoung
    • Proceedings of the KIEE Conference
    • /
    • 2006.04b
    • /
    • pp.296-297
    • /
    • 2006
  • This paper presents a method to optimize train radio communication network for train control (CBTC) or multimedia services. To determine the optimized distance between wayside radio stations in a radio communication network constructed along railway, radio frequency allocation and hand-over capability is studied in terms of radio communication cell coverage and roaming feasibility.

  • PDF

Quorum Sensing-Based Multiple Access Networks

  • Tissera, Surani;Choe, Sangho
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.41 no.7
    • /
    • pp.750-753
    • /
    • 2016
  • Quorum sensing (QS) is a bacterium-to-bacterium cell communication mechanism allowing bio-cell network construction but such mechanism is not well defined yet. We construct a QS-based multiple access network (MAN) and then numerically analyse its average uplink channel capacity as well as BER performance over diffusion-based 3-D molecular communication channels.