• Title/Summary/Keyword: construction communication

Search Result 1,784, Processing Time 0.039 seconds

A study of the communication infrastructure construction for u-City in Korea (u-City 통신 인프라 구축 연구)

  • Yoo, Jae-Duck;Park, Hong-Tae;Shin, Hyun-Sik;Shin, Yun-Ho
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.1 no.2
    • /
    • pp.127-135
    • /
    • 2006
  • The Korea built successfully e-Korea based on the best of internet infrastructure which was constructed in the world. Continually, Korea is constructing u-City for twenty-first century to enhance the quality of life and to grow up IT industrial. But there is no standard model for u-City because three main builders, central government, local autonomous entities, and communication carriers have respectively their objects, targets and domains. If u-City would be constructed by the common infrastructure for ubiquitous communication, it will be possible to provide any ubiquitous services and compatibility. And the communication infrastructure has to be reflected on the first stage of city planning to reduce high cost for u-City construction. This paper mentions firstly the ranges of communication infrastructure and shows how to construct it each range.

  • PDF

Communication Awareness Survey and Design Communication Method Using QFD (설계 커뮤니케이션 인식조사 및 QFD를 이용한 설계 커뮤니케이션 방안)

  • Bae, Yujung;Kwon, Won;Cho, Jaeho;Choi, Byungsun;Chun, Jaeyoul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.5
    • /
    • pp.50-58
    • /
    • 2017
  • The efficient communication process is essential to guarantee the completeness of design and secure the quality to meet the contractor's needs. However, using the existing communication methods based on the design and documents, it is difficult to effectively understand the drawings and specifications that are very complicated, and sufficient technical experiences would be required. Ineffective and inefficient communication among users, designers and project participants during the design process would raise the possibility of functional interferences of the object, induce conflicts, cause a design change, and accordingly incur losses of the project in terms of cost and time. The purpose of this study is to suggest improvement direction of communication in accordance with the requirements, by investigating the present state and the project participants' understanding of design communication. And also, it presents the application model of QFD that the project participants could share and define, and feedback the requirements as well as conducting analysis of improvement factors based on the survey.

Research on Efficient Applicability Through Review on Standard for Selection of Construction Method for Railway Underground Crossing Transit (철도지하횡단 통과 공법 선정기준에 관한 검토를 통해 효율적인 적용성에 대한 연구)

  • Hwang, Young-Ho;Shon, Jung-Chul;Baek, Jong-Myeong
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.595-600
    • /
    • 2007
  • Greater expansion and more frequent operation of the railroad transportation system anticipated due to its characteristics including low cost, safety and mass transportation. Recently, effects on the railway structures due to expansion of newly constructed road, construction of subway, city gas pipeline, communication network, electric power network and construction of other railway underground crossing in accordance with urban planning and organization has influenced safe operation of trains. Accordingly, standard for selection of construction method that will enable construction of more economical and rational subway underground crossing structures by preventing problems occurring at the time of above construction works and accidents in safe operation of trains due to construction in advance is definitively necessary. Although there are numerous construction methods that can be applied at the time of construction of railway underground crossing, there are much difficulties in selection of appropriate construction method that considers characteristics of each construction method on non-excavation type construction method, train operation plan of number of operational routes and on-site circumstances. Therefore, this research aims to present rational standard for selection of construction method for such, and standard for slowdown speed and interception of train when passing the areas of slowdown in sectors under construction.

  • PDF

A Review on the Decision-making Process for Calculating Land and Construction Costs in the Early Stages of the Project - Focusing on the Housing Vonstruction Project in Jeju Island - (사업초기단계에서 토지비 및 건축공사비 산정을 위한 의사결정프로세스에 관한 고찰 - 제주도 내 주택건설사업 중심으로 -)

  • Jo, Seong-Min;Cho, Sung-Hee;Jeon, SangHoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.321-322
    • /
    • 2021
  • This study is to develop a non-contact construction project management solution that can reduce cost and construction period through on-site information sharing, minimizing contact with others by COVID19, and improving the productivity of the construction industry. Decisions, checklists, and execution rates of construction costs can be checked with smart devices through sharing on-site photos and videos, exchanging opinions. Details and checklist data stored on cloud servers of sites that apply non-face-to-face construction project management solutions will be used as data for analyzing amounts and construction periods depending on the size of the construction. Real-time field information sharing will reduce expected problems and waste factors, expand communication channels with users to prevent or minimize construction disputes and claims, and contribute to the expansion and growth of new research industry markets in construction technology.

  • PDF

Development of Non-Contact Construction Management Supporting System For Cost Reduction and Duration Reduction By Real-Time Data Sharing (건설공사에서 실시간 현장 정보 공유에 의한 원가절감, 공기단축을 위한 비대면 건설사업관리 솔루션 개발)

  • Kang, Sang-Chan;Kim, Min-Jin;Jang, Myunghoun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.323-324
    • /
    • 2021
  • This study is to develop a non-contact construction project management solution that can reduce cost and construction period through on-site information sharing, minimizing contact with others by COVID19, and improving the productivity of the construction industry. Decisions, checklists, and execution rates of construction costs can be checked with smart devices through sharing on-site photos and videos, exchanging opinions. Details and checklist data stored on cloud servers of sites that apply non-face-to-face construction project management solutions will be used as data for analyzing amounts and construction periods depending on the size of the construction. Real-time field information sharing will reduce expected problems and waste factors, expand communication channels with users to prevent or minimize construction disputes and claims, and contribute to the expansion and growth of new research industry markets in construction technology.

  • PDF

Design and Implementation of Fugitive Dust Measurement System using Optical Method (광학기법을 이용한 비산 먼지 측정 시스템의 설계 및 구현)

  • Chae-Hoon, Ban;Hyun-Gun, Son
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.17 no.6
    • /
    • pp.1237-1242
    • /
    • 2022
  • Fugitive dust, which accounts more than 50% of fine dust, is an air pollutant, that is generated by a lot in construction work(29.5%) and the law provides standards for facility installation and measures to control this. However, small-scale construction sites are not subject to management standards, and the law to measure and manage fugitive dust generated from construction sites is insufficient. In this paper, we designed and implemented the method to easily measure and monitor fugitive dust using the digital optical method for turbidity of dust. We presented the method to measure the turbidity of fugitive dust using the digital optical method and measured the actual turbidity of fugitive dust at the construction sites after implementing the fugitive dust measurement system.

A Study on the Improvement Plan of Construction Noise Monitoring (공사장 소음모니터링 개선방안에 관한 연구)

  • Park, Young-Min;Kim, Kyoung-Min
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.23 no.12
    • /
    • pp.1056-1065
    • /
    • 2013
  • Noise generated from Construction site has been raised most civil complaints to 64.4 % among the environmental pollution in 2011. Therefore, local government recommends and prescribes that construction sites over a certain scale install sound level meter for noise monitoring. For example, Seoul has implemented a 24 hour noise monitoring system, with real time communication, to the large construction sites more than 10,000 $m^2$ from the end of August 2012. But it is difficult to use noise measurement data for the construction noise assessment, since the installation standards and technical specifications for construction noise monitoring system are not presented. In this paper, we proposed noise monitoring system improvement plan including technical specifications and installation standards using the investigating results of the problems of current noise monitoring system and the foreign cases.

A Study of Cost Management Utilizing Resource Quantity Data in Nuclear Power Plant Construction Project (원전건설 물량데이터를 활용한 사업비관리 방안)

  • Lee, Sang-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.185-186
    • /
    • 2017
  • Even large construction projects of nuclear power plant construction and production data is increasing dramatically due to the introduction of ICT technologies, such as 3D scanning technology, wireless communication technology, virtual construction management technology. There are various attributes and types of data to be produced and managed because the documents generated by the contract method are different from the cost processing method. According to the requirements of the international nuclear bid, it is required to present the cost that is calculated based on resource quantity. This research considers ways in which the cost management based on the resource quantity.

  • PDF

A PRACTICAL HUMAN RESOURCE MANAGEMENT PLAN FOR FOREIGN CONSTRUCTION WORKERS

  • Seung-Heon Han;Eui-Jae Jin;Sang-Hyuk Park
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1216-1222
    • /
    • 2005
  • A shortage of construction field workers has been a serious problem, both in the developed and in the developing countries. As a solution for conquering this problem, these countries import foreign laborers from nearby less-developed countries. While this contributes to lessening the labor deficiency, foreign workers are relatively inefficient in productivity and are often exposed to the cross-cultural risks due to cultural differences, communication difficulties, different work ethics and customs, etc. Despite these facts, construction firms do not well address these issues and are lagged in establishing an appropriate management strategy against it. This paper presents a practical management plan for foreign construction workers through Focus Group Interviews (FGI) and survey investigation. On this basis, this study examines the level of awareness and important managerial aspects of the issue of foreign laborers. Finally, it suggests a cross-cultural and ready-to-use practical human resource management plan for facilitating the foreign worker's productivity.

  • PDF

IMPLEMENTING WEB-BASED COLLABORATION PLATFORMS IN CONSTRUCTION: EVALUATING THE LANE COVE TUNNEL (LCT) EXPERIENCE

  • Rodney A. Stewart ;Debbie Smit ;Martin Betts
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.544-549
    • /
    • 2005
  • Web-based collaboration platforms present construction project teams with an opportunity to improve the efficiency of document exchange, better control project communications and enhance team collaboration. However, many construction professionals are still not convinced that these platforms, in their current form, are fit-for-purpose and yield sufficient efficiencies for the construction procurement process. In an attempt to improve the current ICT diffusion process, this paper evaluates the implementation of a web-based collaboration tool on the Lane Cove Tunnel (LCT) project in Sydney, Australia. Moreover, the paper provides strategies for achieving more effective implementation of web-based collaboration platforms in the construction sector.

  • PDF