Development of an Eco-Value Engineering Support System

  • Sun-Im Kang;Jong-Hyeob Kim;Mi-A Jung;Chang-Taek Hyun;Sangwon Han
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.115-121
    • /
    • 2013
  • A number of urban renewal projects are currently being implemented around the world. Current project management tools are limited in effectively dealing with numerous issues regarding management of these projects (e.g., simultaneous execution of multiple projects). As an effort to address this deficiency, an Intelligent Program Management Information System (i-PgMIS) was developed for effective management of urban renewal projects. The i-PgMIS is a web-based system consisting of various modules including cost management, schedule management, risk management, change management, eco-value engineering (EVE) and so on. Based on the recognition of increasing awareness of creating sustainable built environment, this paper focuses on the EVE module that can support eco-value analysis at program-level management. The EVE module is expected to enhance value and sustainability of construction processes throughout the whole 'program' lifecycle and further to support program feasibility study based on life cycle costing.

  • PDF

Progressive Design-Build: Its Functions as a Contracting Method and the Four Pillars of Project Success

  • Jeong, Euiseok;Anderson, Connor;Lin, Ken-Yu;Migliaccio, Giovanni C
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.25-32
    • /
    • 2022
  • As a project delivery method, Design-Build (DB) has provided owner, architect, and contractor groups with a process of early design and rapid construction for the past three decades. Although there are many benefits to using standard DB, dissatisfaction has arisen due to limitations to innovate, limited owner involvement during design, and often lengthy procurement. Progressive Design-Build (PDB) has become an appealing alternative providing benefits not seen with standard DB. This paper investigates how PDB impacts a project and how it compares against standard DB; it also presents a proposed framework for evaluating the owner's responsibility and assessment of a project, which we named the "Four Pillars of Project Success". The four pillars are defined with respect to an owner's responsibility and assessment of a project, including project predictability, project risk, project schedule, and project cost. We conducted a literature review, examined several public project case studies, analyzed PDB project information collected by the Design-Build Institute of America (DBIA), and held stakeholder interviews with owners, contractors, and architects who have used both PDB and standard DB. This paper offers insight into PDB's structure and outcomes so an owner group can make an informed decision when considering PDB as their next construction contracting method.

  • PDF

Application of Big Data and Machine-learning (ML) Technology to Mitigate Contractor's Design Risks for Engineering, Procurement, and Construction (EPC) Projects

  • Choi, Seong-Jun;Choi, So-Won;Park, Min-Ji;Lee, Eul-Bum
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.823-830
    • /
    • 2022
  • The risk of project execution increases due to the enlargement and complexity of Engineering, Procurement, and Construction (EPC) plant projects. In the fourth industrial revolution era, there is an increasing need to utilize a large amount of data generated during project execution. The design is a key element for the success of the EPC plant project. Although the design cost is about 5% of the total EPC project cost, it is a critical process that affects the entire subsequent process, such as construction, installation, and operation & maintenance (O&M). This study aims to develop a system using machine-learning (ML) techniques to predict risks and support decision-making based on big data generated in an EPC project's design and construction stages. As a result, three main modules were developed: (M1) the design cost estimation module, (M2) the design error check module, and (M3) the change order forecasting module. M1 estimated design cost based on project data such as contract amount, construction period, total design cost, and man-hour (M/H). M2 and M3 are applications for predicting the severity of schedule delay and cost over-run due to design errors and change orders through unstructured text data extracted from engineering documents. A validation test was performed through a case study to verify the model applied to each module. It is expected to improve the risk response capability of EPC contractors in the design and construction stage through this study.

  • PDF

Modular reactors: What can we learn from modular industrial plants and off site construction research

  • Paul Wrigley;Paul Wood;Daniel Robertson;Jason Joannou;Sam O'Neill;Richard Hall
    • Nuclear Engineering and Technology
    • /
    • 제56권1호
    • /
    • pp.222-232
    • /
    • 2024
  • New modular factory-built methodologies implemented in the construction and industrial plant industries may bring down costs for modular reactors. A factory-built environment brings about benefits such as; improved equipment, tools, quality, shift patterns, training, continuous improvement learning, environmental control, standardisation, parallel working, the use of commercial off shelf equipment and much of the commissioning can be completed before leaving the factory. All these benefits combine to reduce build schedules, increase certainty, reduce risk and make financing easier and cheaper.Currently, the construction and industrial chemical plant industries have implemented successful modular design and construction techniques. Therefore, the objectives of this paper are to understand and analyse the state of the art research in these industries through a systematic literature review. The research can then be assessed and applied to modular reactors.The literature review highlighted analysis methods that may prove to be useful. These include; modularisation decision tools, stakeholder analysis, schedule, supply chain, logistics, module design tools and construction site planning. Applicable research was highlighted for further work exploration for designers to assess, develop and efficiently design their modular reactors.

산업플랜트 건설 프로젝트의 주요 공정 시퀀스 분석을 통한 리스크 평가 (Project Risk Assessment Through Construction Sequence Analyses for Industrial Plant Construction Projects)

  • 이규성;최재현
    • 한국건설관리학회논문집
    • /
    • 제14권4호
    • /
    • pp.140-151
    • /
    • 2013
  • 2011년과 2012년 국내건설기업의 해외건설시장 공종별 수주구조는 플랜트분야가 약 645억 달러(전체의 73%)로 타 건설분야에 비해 압도적이며 수주금액 또한 역대 최고액을 기록하였다. 이러한 플랜트 건설시장의 비중과 수주율은 당분간 지속될 전망이다. 하지만 국내 기업이 보유한 플랜트 건설기술은 상세설계와 건설시공 분야에서 비교적 높은 경쟁력을 보이나, 엔지니어링의 원천기술 및 기본설계 분야와 사업관리 분야는 기술 선진국의 60%~70% 내외이다. 국내 기업의 사업관리 경쟁력을 향상시키기 위해 플랜트 건설 공정관리 기술의 고도화와 프로젝트 수행과정에서 발생하는 리스크의 체계적인 평가 방안을 마련하는 것이 시급하다. 본 연구에서는 산업플랜트 건설프로젝트의 주요 공정 시퀀스 모델을 개발하여 프로젝트 초기에 공정계획 수립의 주요 항목설정과 공사의 흐름 및 공정 간의 연관관계 등을 명확하게 정립할 수 있도록 하였다. 특히 공종별 주요 액티비티 분석을 통해 주요 공정 시퀀스를 도출하였고, 퍼지이론을 활용하여 프로젝트 수행 단계별 위험도 평가 방안의 개발 및 중점 관리 공정 프로세스를 제시함으로써 산업플랜트 건설 프로젝트 공정개발과정과 주공정 수행과정의 리스크 분석에 용이성을 향상할 수 하도록 하였다.

CM at Risk를 적용한 공동주택의 확률론적 초기 GMP 산정방안 (Probabilistic Earlier GMP Calculation Method for Apartment Using CM at Risk)

  • 현창택;고건호;김정훈
    • 한국건축시공학회지
    • /
    • 제18권3호
    • /
    • pp.295-303
    • /
    • 2018
  • 현재 DBB 발주방식에서는 설계단계와 시공단계가 분리되어 있어, 잦은 설계변경이 발생하고 있다. 아울러 공사비초과, 공기지연 및 품질저하를 야기하는 문제점들을 초래하고 있다. 최근에 발주자의 다양한 요구, 제한적인 예산 및 공기 등의 제약조건에 대응할 수 있는 발주방식인 CM@R 발주방식이 대두되고 있다. CM@R 발주방식에서는 설계단계에서 발주자와 협의하여 GMP를 정하고, GMP 내에서 CM수행자가 책임을 지고 공사를 수행하는 방식이다. 그러나 CM@R 특성상 완성되지 않은 도서를 기준으로 GMP를 산정하기 때문에 불확실성이 내재되어 있다. 본 연구에서는 GMP 산정시 불확실성을 고려하기 위하여, CBR를 이용한 공사비 예측 및 MCS를 적용한 확률론적 초기 GMP 산정방안을 제시하였으며, 초기 GMP 산정 이후 사업진행에 따라 GMP 협의를 수행할 수 있는 프로세스를 제시하였다. 사례연구 및 검증을 통하여 확률론적 초기 GMP 산정방안을 검증하였다. 본 연구에서는 제시된 확률론적 GMP 산정방안을 통하여 GMP의 범위를 설정하고 발주자와 CM수행자가 협의을 통해 리스크를 줄임으로써, CM@R의 성공적인 국내 도입에 일조하고자 하였다.

민자사업의 사업관리 사례분석

  • 이관영;김세종
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.13-19
    • /
    • 2004
  • 민자사업의 사업관리주체는 몇몇 사업을 제외하고는 해당 사업의 시행을 위해서 별도로 설립된 사업시행법인인 경우가 대부분이다. 본 연구에서는 민자사업의 사업관리사례로서 사업시행법인 자체의 조직과 인력을 활용한 발주자CM의 형태로 사업관리를 수행한 서울외곽순환(일산$\~$퇴계원)고속도로 민자사업의 사례를 분석, 제시하고자 하였다. 시간관리의 측면에서 사업시행법인은 시공단계의 단순한 공정관리 틀에서 벗어나 사업의 계획. 설계, 인허가, 시공, 그리고 운영 및 유지관리까지 사업 전단계에 걸친 사업관리주체라는 관전으로 접근하였으며, 비용관리의 측면에서 시공단계의 사업비 증파에 대한 risk의 부담주체는 민간이라는 기본 전제하에 설계VE 등을 통한 사업비 절감요인 도출 등 보다 적극적인 사업비 관리가 요구되었다.

  • PDF

Facilitating the Usage of Value Management Processes by Charactering Capital Facility Projects

  • 차희성
    • 한국건설관리학회논문집
    • /
    • 제5권2호
    • /
    • pp.144-152
    • /
    • 2004
  • Defining value as a measure of how well the project value objectives are met, Value Management Process (VMP) is considered to be any management effort or process that can proactively pursue one or more project objectives (i.e., security/safety, cost effectiveness, schedule optimization, and risk containment). The collection of 44 VMPs has been established based on a rigorous effort conducted by Construction Industry Institute (CII). Because varying circumstances on each project determine the level of suitability, it is crucial to identify which VMP should be implemented on a particular project. The current VMP selection process is primarily based on human intuition. The main objective of this paper is to provide a systematic method to facilitate the usage of VMPs on a particular project. This paper identified and quantified the selection principles (i.e., targeted value objectives, timing of initiation, project characteristics, and relative impact). The data collected from industry practitioners and VMP experts characterized each VMP in terms of the magnitude of benefit. An automated selection tool by Visual Basic Application (VBA) on MS Excel TM, was developed and proved its validity. As a pioneering study, this paper provides a comprehensive and structured knowledge on the subject of VMPs. From the industry's perspective, the automated selection tool, the premier of this study, contributes the facilitation of the VMP implementations in the construction industry thereby maximizing the potential benefits to a particular project.

프로그램 수준 건설사업에서 지연관리지수(Delay Management Index)를 활용한 공사지연 예방 사례연구 (A Case Study on the Prevention of Construction Delays Using the Delay Management Index in Program Level Construction Projects)

  • 유준혁;김옥규
    • 한국건축시공학회지
    • /
    • 제21권4호
    • /
    • pp.347-359
    • /
    • 2021
  • 최근 건설공사는 초대형화로 단일 공사규모가 복잡해지고 천문학적인 공사비가 소요되는 프로그램 관리 형태의 성격을 지니는 사업이 등장하고 있다. 특히, 대규모 건설사업과 같이 프로그램 수준에서 관리가 절대적으로 필요한 사업은 계획된 일정 및 비용에 대한 전제적인 관리가 필요하다. 하지만 국내의 경우 구체적인 공사지연에 관한 관리기준이 부재한 현실이다. 이에 본 연구에서는 대규모, 장기간 진행되는 프로그램 수준의 대규모 건설사업을 성공적으로 수행하고 공정지연 및 부진사업을 사전에 방지하기 위한 지연관리지수(Delay Management Index, DMI)를 개발하였다. 이를 통해 대규모 복합건설 프로젝트를 대상으로 사례연구를 수행하였으며, 프로그램 수준 건설사업을 위한 지연예방체계를 구축하였다.

E.P.B(Earth Pressure Balance) Shield TBM 공사의 공기지연 사례연구 (A Case Study of Delay Analysis for E.P.B Shield TBM Method in Construction Site)

  • 곽준환;박형근
    • 대한토목학회논문집
    • /
    • 제29권6D호
    • /
    • pp.737-743
    • /
    • 2009
  • 터널 공사에 있어서 Shield TBM 장비의 활용이 증가함에 따라 Shield 공법의 효율성 증대를 위한 다양한 연구 또한 수행되어졌다. Shield TBM에 대한 연구들은 대부분 굴착 대상이 되는 지반의 특성을 고려하여 Shield TBM 장비 선정, 굴진속도 계산, 모델식 개발 등에 초점을 맞추고 있으며, 굴착의 주체가 되는 Shield TBM 장비와 장비에 의해 발생하는 트러블로 인한 공기지연에 대한 연구는 수행되어지지 않았다. 따라서 본 연구에서는, Shield 터널 공사 중 Shield 장비의 초기굴진을 대상으로 하여, 굴진 시 발생하는 트러블에 의해 야기되는 공기지연 시간 및 원인을 FMEA기법을 이용하여 분석하였고, 공기지연 방지를 위한 관리 방한의 제시를 목적으로 각각의 트러블 항목들에 대한 우선순위를 결정하는 연구를 수행하였다. 그 결과 이전까지의 연구들에서 지반적 요소들에 비해 상대적으로 소홀히 다루어진 Shield TBM의 기계적 요소들의 트러블이 공기지연을 일으키는 주요 원인이라는 것을 알 수 있었다. 각각의 공기지연 발생 요소 중 공기지연 위험도가 큰 몇몇 항목을 대상으로 트러블 관리방안을 제시함으로써, 본 굴진 및 향후 유사 조건의 프로젝트 수행 시 보다 효율적으로 공사를 수행할 수 있을 것으로 기대된다.