• Title/Summary/Keyword: concrete track

Search Result 393, Processing Time 0.028 seconds

A Parametric Study on the Serviceability of Concrete Slab Track on Railway Bridges (철도교 콘크리트 슬래브궤도의 사용성에 관한 매개변수 영향 연구)

  • Park, Hong-Kee;Jang, Seung-Yup;Yang, Sin-Chu;Park, Yong-Gul
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.1
    • /
    • pp.95-103
    • /
    • 2009
  • Deformations of bridge deck ends on abutments and piers bring about severe problems in track geometry and require maintenance work. In case of concrete slab track, more severe deformation and additional forces on rail and rail supports can be induced by bridge deck deformation, which affect the serviceability of track structure since concrete slab track is much stiffer than ballasted track and the behavior of track structure is integrated with that of bridge deck. In this study, the design variables affecting the serviceability of track structure are selected and the influence level is estimated by a parametric study. As a result, it is found that continuous span is advantageous than simply supported span and the stiffness of bridge bearing and rail fastener as well as the distance between last rail support and bridge bearing are most important parameters.

An Analytical Study on Running Safety and Ride Comfort in Case of Superimposition of Vertical and Transition Curves (종곡선과 완화곡선 경합시 차량주행안전성 및 승차감에 대한 해석적 연구)

  • Um, Ju-Hwan;Kim, Man-Cheol;Lee, Il-Wha;Goo, Byeong-Choon
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.2
    • /
    • pp.172-178
    • /
    • 2012
  • Superimposition of vertical and transition curves is not allowed for all types of tracks in Korean regulation of railway construction. However, this criterion has been established on the basis of difficulty of maintenance of the ballasted track. Comparing with the ballasted track, the concrete slab track has the advantage of maintenance and structural, which allows the superimposition of vertical and transition curves when it satisfies the criteria of running safety and riding comfort. In this study, running safety, ride comforts and track acting forces were analyzed and compared by numerical analysis using VAMPIRE program when the vertical and transition curves are superimposed for the ballasted track as well as the concrete slab track. From the analysis results, it was found that running safety, riding comforts and track acting forces in case of superimposition of vertical and transition curves for the both tracks meet all of the criteria. Therefore, although superimposition of vertical and transition curves for the ballasted track is not allowed because of a lot of maintenance works, it can be applied to the concrete slab track considering the advantage of maintenance and structural safety.

Parametric Study on Track Deterioration by Various Track Type of Serviced Line (운행선 궤도형식별 궤도열화에 미치는 매개변수 연구)

  • Choi, Jung-Youl;Park, Jong-Yoon;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.3
    • /
    • pp.239-244
    • /
    • 2022
  • In this study, the key parameters affecting the deterioration of each track type were derived based on field inspections and laboratory tests. The existing track deterioration model was limited to the ballasted tracks, and the deterioration evaluation of concrete tracks was insufficient. In this study, the laboratory test was performed to evaluate the performance and condition of track components to derive the deterioration factors reflecting the characteristics of various track structures. In addition, through analysis of track maintenance history data, parameters affecting track deterioration and maintenance were derived. The key parameters for presenting a track deterioration model based on the track performance of ballasted and concrete tracks through field inspection, track maintenance history data analysis, and performance test of track components using on-site specimens were identified as track support stiffness, Ballast gravel, track settlement and Resilience pad were presented.

The Fatigue Life Evaluation of Continuous Welded Rail on a Concrete Track in an Urban Railway (도시철도 콘크리트궤도 장대레일의 피로수명 평가)

  • Kong, Sung-Yong;Sung, Deok-Yong
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.3
    • /
    • pp.193-200
    • /
    • 2014
  • In this study, fatigue tests on existing continuous welded rail (CWR) on a concrete track were carried out. Based on the test results, a S-N curve expressing the remaining life of the CWR at a fracture probability of 50% was obtained using weighted probit analysis suitable for small-sample fatigue data sets. As rails had different histories in terms of accumulated passing tonnage, the test data were corrected to average out the accumulated passing tonnage. The remaining service life for the CWR on the concrete track in an urban railway was estimated using the prediction equation for the bending stress of rail developed in the past to estimate rail base bending stress and taking the surface irregularities into consideration. Estimating the remaining service life of the CWR in an urban railway showed that the rail replacement period could be extended over 200MGT. In addition, comparing the concrete track to the ballast track, the fatigue life of rail was analyzed as approximately 300MGT higher than. Therefore, the rail replacement criteria needs to distinguish between the ballast track and the concrete track, and not the criteria needs to be changed as a target for the maintenance, although it is necessary to remove longitudinal rail surface irregularities at welds by grinding.

Initial Investment Cost Analysis of Facilities of B2S Track System (B2S궤도시스템의 초기 시설 투입비용 분석)

  • Kim, Hyo-San;Min, Jun-Ho;Ryu, Jae-Kwang;Lee, Dal-Jae
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.733-739
    • /
    • 2011
  • B2S(Ballasted track To Slab track) that is track system has been first developed in 2004 with foundation of rich experience and know-how of subway track upkeep and mending of facilities in 36 years to improve an existence pebble track at a concrete track. 'B2S' is admitted technology through patent registration in the domestic and Europe and it's made by a factory and put together at field, so it's able to construct precisely and to reduce a construction period. In addition, safety, the ecological balance and durability are excellent, and walking, cleaning, etc. has the advantage of easy maintenance. 'B2S' is currently laying 27.7km at Seoulmetro as of end of 2010 standard, but it'll be expected to be applied to a domestic Metro more from now on. It is possible to classify the total cost resolution structure of B2S system by R&D cost, test production and experiment cost, the initial facility cost, maintenance cost, disposal cost. In this research, it seems useful for selection evaluation which considered the life cycle cost or economics of the concrete track structure by analyzing an initial cost of facilities.

  • PDF

Design and Construction Method Considering Turnout for High-speed on The Bridge with Concrete Track (콘크리트궤도에 고속분기기 설치를 고려한 교량설계 및 시공기법)

  • Kim, In-Jae;Oh, Sei-Young;Joo, Hwan-Joong
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.71-79
    • /
    • 2008
  • The concrete track is being used at the Phase II of the Kyeongbu High Speed Railway and New Constructed Honam High Speed Railway. When it makes a decision of bridge type, It has to consider about longitudinal forces of Continuous Welded Rail, Displacement at the end of bridges, Up-lift forces for fastener on the track. If it is installed turnout on the bridge, There is likelihood of the deck twist by applying the each difference longitudinal forces at the 4 each rails and the buckling by concentration of rail stress at the turnout. Moreover, If it is installed turnout on the continuous bridge and REJ(Rail Expansion Joint) on the main track or turnout track. It is hard to keep a safety for rail because of coming to twist or folding at the expansion of deck on the turnout track. Therefore when it is a design of bridge with turnout. It need to take bridge type to minimize an additional axial force and a displacement at the turnout. This paper makes a study of the composite steel arch bridge that is able to resolve criteria requirements of safety for track with turnout and suggest a helpful design method for bridge considering track with turnout by being based on design and construction method of Eonyang Bridge at the north part of Ulsan Station in Phase II of the Kyeongbu High Speed Railway.

  • PDF

Shear Key Design of Concrete Track on Bridge (교량구간 콘크리트궤도의 전단키 설계)

  • Back, Hyo-Sun;Lee, Ho-Ryong;Bae, Sang-Hwan;Cho, Hyun-Cheol
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.3251-3255
    • /
    • 2011
  • Being the concrete track laid on bridge, due to track-bridge temperature difference, traction and brake force, and nosing force, the horizontal force can be applied to the track slab. Therefore, shear key structures to resist this horizontal force should be installed. The shear key structures installed in the Kyeong-Bu high-speed line are consisted of four shear keys at every slab with the length of 6 to 8m. However, in the point of view of construction, it is more advantageous to curtail the numbers of shear keys, and thus, the numbers and spacing of the shear keys should be carefully determined. In this study, hence, the effects of slab length, the numbers and spacing of the shear keys on design of shear key and track slab are examined.

  • PDF

Analysis of the Life Cycle Cost for the Ballasted Track and the Concrete Track Structures (자갈도상과 콘크리트도상 궤도구조의 생애주기비용 분석)

  • Baek, Jae-Wook;Song, Yoo-Seob;Park, Tae-Hyo
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1299-1305
    • /
    • 2006
  • In this paper, the objective is an evaluation of economics using Life Cycle Cost(LCC) analysis for the ballasted track and the concrete track. However, since the absence of reliable data on maintenance activities, the degree of a reliability about the results of the LCC analysis is insufficient yet. In order to remedy the problems, we surveyed a professional research group for an approximate estimation which can be represented a degree of maintenance through a application of examples. Hereby we found that it is possible to expect the retrenchment of cost using preventive maintenance management. Moreover we proposed appropriate and economical restrictions between track structures.

  • PDF