• 제목/요약/키워드: concrete movement

검색결과 239건 처리시간 0.026초

Shrinkage movement analysis of reinforced concrete floors constructed in stages

  • Kwan, A.K.H.;Ng, P.L.
    • Computers and Concrete
    • /
    • 제6권2호
    • /
    • pp.167-185
    • /
    • 2009
  • Reinforced concrete floors constructed between movement restraints often crack seriously due to shrinkage after completion. One common mitigation measure is to construct the concrete floors in stages to allow part of the shrinkage movement to take place before completion. However, shrinkage movement analysis of concrete floors constructed in stages is quite cumbersome, as the structural configuration changes during construction, thus necessitating reanalysis of the partially completed structure at each stage. Herein, a finite element method for shrinkage movement analysis of concrete floors constructed in stages is developed. It analyses the whole structure, including the completed and uncompleted portions, at all stages. The same mesh is used all the time and therefore re-meshing and location matching are no longer necessary. This is achieved by giving negligibly small stiffness to the uncompleted portions, which in reality do not exist yet. In the analysis, the locked-in strains due to increase in elastic modulus as the concrete hardens and the creep of the hardened concrete are taken into account. Most important of all, this method would enable fully automatic shrinkage movement analysis for the purpose of construction control.

재령초기 콘크리트포장 줄눈거동에 미치는 온도의 영향 (Effect of Temperature on Joint Movement of JPCP at Its Early Age)

  • 최기효;정진훈;천성한;박문길
    • 한국방재학회:학술대회논문집
    • /
    • 한국방재학회 2007년도 정기총회 및 학술발표대회
    • /
    • pp.340-343
    • /
    • 2007
  • 콘크리트포장의 줄눈의 초기균열발생과 움직임에 영향을 주는 중요한 인자는 콘크리트 내부의 초기온도이므로 이를 측정하고 분석하는 것은 매우 중요하다. 이를 연구하기 위해 인천국제공항 포장공사 지역에 써머커플과 습도센서, 진동형스트레인게이지, 디멕디스크 등을 설치하였다. 초기균열 거동은 디멕게이지를 이용하여 측정하였고, 초기균열 및 줄눈분 균열은 육안으로 확인 하였다. 분석결과, 콘크리트포장의 온도는 줄눈거동에 크게 영향을 주는 것으로 나타났다. 줄눈에 발생한 균열의 폭은 콘크리트슬래브의 열팽창의 영향으로 온도가 하강하는 야간이나 새벽에 증가하고, 온도가 상승하는 주간에는 줄어드는 것을 확인할 수 있었다. 균열이 발생하지 않은 줄눈의 거동은 이와는 반대의 경향을 나타내었다.

  • PDF

3차원 수치해석을 이용한 강관합성말뚝의 보강효과 분석 (Analysis of Reinforcement Effect of Steel-Concrete Composite Piles by 3-Dimensional Numerical Analysis)

  • 김성렬;이시훈;정문경;이주형
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2009년도 세계 도시지반공학 심포지엄
    • /
    • pp.404-411
    • /
    • 2009
  • The steel pipe of steel-concrete composite piles increases the pile strength and induces the ductile failure by constraining the deformation of the inner concrete. In this research, the load-movement relations and the reinforcement effect by the outer steel pipe in the steel-concrete composite pile were analyzed by performing three-dimensional numerical analyses, which can simulate the yielding behavior of the pile material and the elasto-plastic behavior of soils. The parameters analyzed in the study include three pile materials of steel, concrete and composite, pile diameter and loading direction. As the results, the axial capacity of the composite pile was 1.9 times larger than that of the steel pipe pile and similar with that of the concrete pile. At the allowable movement criteria, the horizontal capacity of the composite pile was 1.46 times larger than that of the steel pile and 1.25 times larger than that of the concrete pile. In addition, the horizontal movement at the pile head of the composite pile was about 78% of that of the steel pile and about 53% of that of the concrete pile, which showed that the movement reduction effect of the composite pile was significant and enables the economical design of drilled shafts.

  • PDF

지하 전력구조물의 거동에 대한 방수층의 대응 성능 평가 방법 개발 (10 mm 거동 대응형 방수시스템 Mock-Up 시험 방법) (A Performance Test Method of Waterproofing System to Evaluate the Responsiveness to the Movement of Box Culvert Structure for Underground Electronic Power Facility (Mock-Up Test Method of Waterproofing Layer to Response 10 mm Movement of Expansion Joint))

콘크리트 구조물의 누수방지를 위한 점착.팽창성 유연형 도막방수재의 개발 및 적용에 관한 연구 (A Study on Development and Application of Waterproofing and repair material mixed Ruberic Asphalt Component With Adhesive and Swelling Performance)

  • 오상근;곽규성;이성일;강혜정
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2002년도 학술논문발표회
    • /
    • pp.65-68
    • /
    • 2002
  • This study of concrete movement confronting a scope inspects the problems about the waterproofing method and leakage/repairement at present and research the mechanism with the variety of applying examples introducing adhesion and inflation using the flexible type of waterproofing and repairement and the substitution method developed with polymer resign composite. The polymer resign transmitted into adhesion or inflation materials under wet environment absorbs adjoining moisture, wraps impurities of concrete surface. get the waterproofing layer and concrete surface adhere toughly, reorganizes the impaired waterproofing layer and get over the detachment of it from concrete surface.

  • PDF

경기도내 농업용 저수지의 제체 및 구조물의 노후도 조사 연구 (Studies on Structural Degradation of Agricultural Reservoirs in Kyungki Province)

  • 장병욱;송창섭;박영곤;우철웅;원정윤
    • 한국농공학회지
    • /
    • 제39권4호
    • /
    • pp.90-97
    • /
    • 1997
  • Field inspections and laboratory tests for 31 agricultural reservoirs in Kyungki province were performed to provide basic data for maintenance and rehabilitation of agricultural reservoirs and to evaluate structural degradation of agricultural reservoirs Results of the study are as follows : 1) From survey's results of embankments, signs of settlement and lateral movement are appeared in 17 reservoirs. Crest settlement of 20~80cm, downstream settlement of 10~90cm, and 20~160cm lateral movement of embankments are detected from settlement and movement analysis of 17 reservoirs. Crest and downstream settlements and lateral movement are greatly occurred in 20 ~ 40 years after embankment construction. 2) About 39% of total reservoirs shows seepage problems occurred in the lower part of berm and retaining wall located between embankment and spillway. Probability of seepage problems is higher at retaining wall than others. 3) Concrete strength estimated by Schmidt hammer in structures of reservoirs is a range of 100~l50kgf/$cm^2$ and average deviation of concrete strength is about l0kgf/$cm^2$. Strength difference$({\delta}S)$ between compressive strength estimated by Schmidt hammer and uniaxial compressive strength of concrete core is about $\pm$100kgf/$cm^2$. This difference is due to absence or presence of reinforced bar in concrete core, variable length of concrete core and limitation of Schmidt hammer. 4) About 68% of total reservoirs shows leaching, 58% alkali-aggregate reaction and 71 % abrasion/frost. Leaching, alkali-aggregate reaction and abrasion/frost occurred in most reservoirs when passed 10 years after construction of structure parts.

  • PDF

수치해석을 이용한 강관합성 군말뚝의 보강효과 분석 (Analysis of Reinforcement Effect of Steel-Concrete Composite Group Piles by Numerical Analysis)

  • 김성렬;이시훈;정문경;이주형;곽기석
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 춘계 학술발표회
    • /
    • pp.1132-1139
    • /
    • 2010
  • The steel pipe of steel-concrete composite piles increases the pile strength and induces the ductile failure by constraining the deformation of the inner concrete. In this research, the load-movement relations and the reinforcement effect by the outer steel pipe in the steel-concrete composite pile were analyzed by performing three-dimensional numerical analyses, which can simulate the yielding behavior of pile material and the elasto-plastic behavior of soils. The parameters analyzed in the study include three pile materials of steel, concrete and composite, pile diameter, pile distance and loading direction. As the results, the axial capacity of the composite pile was about 73% larger than that of the steel pipe pile and about 14% larger than that of the concrete pile. In addition, the horizontal movement at the pile head of the composite pile was about 51% of that of the steel pile and about 19% of that of the concrete pile.

  • PDF

Prediction of Time-dependent Lateral Movement Induced by Differential Shortening in Tall Buildings Using Construction Stage Analysis

  • Ha, Taehun;Kim, Sangdae;Lee, Sungho
    • 국제초고층학회논문집
    • /
    • 제6권1호
    • /
    • pp.11-19
    • /
    • 2017
  • High-rise buildings move during construction due to time-dependent material properties of concrete (creep and shrinkage), construction sequences, and structural shapes. The building movements, including vertical and horizontal displacements, result from the sum of axial and lateral deformation of vertical members at each level. In addition to the vertical shortenings, the lateral movement induced by differential shortening can have adverse effects on the construction tolerance and serviceability of non-structural elements such as elevators and curtain walls. In this study a construction stage analysis method is developed to predict lateral movement induced by shortening, including the effect of creep and shrinkage. The algorithm of construction stage analysis is combined with the FE analysis program. It is then applied to predict lateral movement of a 58-story reinforced concrete building that was constructed in Kuala Lumpur, Malaysia. Gravity induced lateral movement of this building is predicted by the construction stage analysis. A field three-dimensional laser scanning survey is carried out to verify the prediction results, and satisfactory agreement is obtained.

콘크리트 균열 진단 보수 전자매뉴얼 (Development of an Inspection and Repair Manual for Concrete Cracks)

  • 오광진;안상구;안동근
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2006년도 춘계학술발표회 논문집(I)
    • /
    • pp.558-561
    • /
    • 2006
  • In many case, reinforced concrete structures are deteriorated by construction errors, design errors, settlement and movement, and weathering. The diagnose and repair of concrete deterioration is important for effective management of concrete structures. This manual is to provides guideline on evaluating the deterioration of the concrete in a structure and selecting an appropriate repair material and method.

  • PDF