• 제목/요약/키워드: complex project

검색결과 943건 처리시간 0.027초

A Study on Development of Main Producing Areas for Industrialization of complex and of fusion in Field

  • Young-Jun Park
    • 한국작물학회:학술대회논문집
    • /
    • 한국작물학회 2022년도 추계학술대회
    • /
    • pp.331-331
    • /
    • 2022
  • This research aims to developing new commercialization project of convergence agricultural industrial model. First, we established an inventory for the planning of convergence agricultural industrial model categorize the relevant factors identified, and then suggested three models which are the business profit model for convergence agriculture industrialization, the resource recycling complex and agricultural tourism model, and the smart agricultural model. Second, in order to investigate the feasibility of each industrial model, we investigated the willingness to participate in the project according to the pilot models such as related organizations and management agencies, and proposed the result of business feasibility analysis. Finally, we suggested the establishment of a demonstration complex through the systemization of element technologies at two models. The related systems and technologies was reviewed as a new commercialization plan through the modeling of convergence agricultural industrial types in main crop production complex presented, and set up mid- to long-term development direction. The results of this study can be applied to the design of convergence agricultural industrial model in main crop production complex.

  • PDF

플랜트공사 관리 효율화를 위한 공정정보 시각화 시스템의 주요 기능 구성방안 (Development of Major Functions of Visualization System for Construction Schedule Data in Plant Project)

  • 강인석;문현석;지상복;이태식
    • 한국건설관리학회논문집
    • /
    • 제9권1호
    • /
    • pp.66-76
    • /
    • 2008
  • 플랜트공사는 토목, 건축, 기계, 전기 공종들이 연동되어 작업이 진행되는 복합공종이다. 또한 일반 공사와 비교시 매우 짧은 공기에 대규모의 공사를 수행하여야 하는 공정상의 특징을 갖고 있다. 이러한 특성들로 인하여 플랜트공사에서 공정관리는 매우 중요한 요소가 되고 있다. 4D CAD에 의한 공정정보의 시각화는 이러한 복합공정에서 더욱 필요성을 갖게 된다. 본 연구에서는 플랜트공사의 특성을 고려한 4D CAD시스템 기능 구성방법론과 실제 시스템 개발을 시도한다. 이를 위하여 플랜트공사 현장의 공정작업 특성을 분석한 후 4D CAD 기능을 구성함으로써, 기존 시스템에서 시도되지 않은 플랜트공사에 특화된 공정시각화 기능구축을 시도하고 있다.

요구조건 기준의 개발 수행을 위한 우주발사체 개발사업의 실제적인 요구조건-검증 관리 체계 (Practical Requirements and Verification Management for Requirements-based Development Process in Space Launch Vehicle Development Project)

  • 조동현;장준혁;유일상
    • 시스템엔지니어링학술지
    • /
    • 제19권1호
    • /
    • pp.56-63
    • /
    • 2023
  • For the success of system development, it is necessary to systematically manage the requirements that are the basis of system development and its verification results. In order to follow the principles of SE(Systems Engineering)-based V&V(Verification&Validation) process, requirements can be managed by securing the requirements and their establishments, design compliances, and verification compliances according to the system development lifecycle. Especially, in a large-complex system research and development project, such as a space launch vehicle development project, many participants establish, verify, and validate numerous requirements together during the project. Therefore, logical and systematic requirements management, including guarantee of data integrity, change history, and traceability, is very important for multiple participants to utilize numerous requirements together without errors. This paper introduces the practical requirements and verification management for the requirements-based development process in the space launch vehicle development project.

지방자치단체 환경영향평가 조례 비교 연구 (A Comparative Study on the Local Governments' Environmental Impact Assessment Regulations in Korea)

  • 성현찬;민수현
    • 환경영향평가
    • /
    • 제12권3호
    • /
    • pp.137-150
    • /
    • 2003
  • This study aims to survey whether local governments have legislated laws and regulations on environment impact assessment system, to compare and analyze specific projects and their scale, assessment items, and procedures & discussion process, to identify issues and generate improvement plans, and to suggest a direction for future legislation to local governments that plan to legislate laws and regulations in the future. Major outcome of the study are as follows. First, terminologies used for environment impact assessment by local governments need to be unified. Also, laws and regulations need to be legislated soon. Second, in "urban development project" areas, a total of nine project areas including "quarrying of soil and stone, sand, gravel, and minerals" was essential common projects. A total of six project types were added or newly established compared to national systems. Among them, four project types were added within national-level project areas and two project types were not available under the national-level project areas and newly added due to the nature of local governments. Third, in terms of project scale, scale enhancement of "urban development project" was most common. Analysis showed that in case of clean natural environment such as Cheju Island, it is necessary to consider reinforcing project areas where development activities take place directly in forests or rivers such as "industrial base and complex development", "water resource development", and "development of tourism complex." Fourth, the discussion and review procedures of assessment reports were similar to those at government level. However, in case of Seoul city, it is required to write a "preparation plan" before drafting an assessment report. The city features partial introduction of scoping and screening, which allows to exempt discussion procedures if impact on environment is found to be minimal after drafting the assessment report. In case of national-level, it has a dual system that is split between Ministry of Construction and Transportation and Ministry of Environment. However, in case of environment impact assessment of local governments, it is a single system where city mayors and provincial governors are in charge of both project execution and environmental assessment. Therefore, the most important task is how to satisfy objectiveness and accountability.

Using Fuzzy Set Theory in Project Planning Problem

  • Park, Seung-Hun;Chang, In seong
    • 한국경영과학회지
    • /
    • 제20권1호
    • /
    • pp.131-145
    • /
    • 1995
  • This paper presents a method for solving project planning problem which the opinions of experts greatly disagree in each activity processing time. Triangular fuzzy numbers (TFNs) are used to represent activity times of experts. And we introduce a pessimistic project planning with major TFNs and an optimistic project planning with minor. TFNs, and illustrate the approach using a combination of the existing composite and the comparison methods, which is used to solve the complex project planning problem.

  • PDF

DATA WAREHOUSE PROTOTYPE SYSTEM TO SUPPORT THE MASTER PLAN OF URBAN REGENERATION PROJECT

  • Dong-Hyun Cho;Sang-Geum Lee;Hyung-Jin Park;Kyo-Jin Koo
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.361-368
    • /
    • 2009
  • In the Urban Regeneration Project, the scale becomes huge and the composition of participating organizations is complex. It is necessary to establish the master plan fast and effectively harmonize conflict options and interests in the early stage of the project. However, the master planner, who is tasked to establish the master plan, and the master planning team, are difficult to establish the master plan fast while effectively considering various and complex information related to regeneration. The Urban Regeneration Project is composed of various types of computer files like HWP, EXL, PDF, DWG and others. When the master plan is established, it is necessary to link the information items and physical files of urban generation in order to effectively save the files in storage for easy search and utilization. This study developed a prototype system to support participating subjects of the Urban Regeneration Projects. It will effectively utilize the information items in the physical computer files using information blocks and Metadata. The developed system provides the base to effectively manage large amount of documents in the early stage of the Urban Regeneration Project and make effective decision-making using the concept of data warehouse.

  • PDF

파이로 프로젝트에 프로젝트 관리 적용 방안 (Application of Project Management on Pyro Project)

  • 김정국;김혁종;고원일;구정회;남효온
    • 시스템엔지니어링학술지
    • /
    • 제13권2호
    • /
    • pp.26-33
    • /
    • 2017
  • Pyro project, one of complex project, is now under research and development. To manage this kind project successfully, it is essential to apply the processes of technical management (TM) based on systems engineering (SE) and project management (PM). In this paper, the project management processes from ISO-21500 standard, PMBOK guide, and PRINCE2 guide were reviewed, and then some common PM for the large national R&D project were selected. An integrated technical management and project management frame work was finally established and suggested for Pyro project.

e-비즈니스 IT 프로젝트 관리의 정성적 접근 모형의 개발 (A Qualitative Approach to eIT Project Management)

  • 정기호
    • 한국IT서비스학회지
    • /
    • 제1권1호
    • /
    • pp.45-55
    • /
    • 2002
  • This paper suggests a new approach to IT project management based on a regular project meeting results to consider the recent project environment. The greater part of recent IT projects are related to e-business transformation. Transforming to e-business is a new problem very different from those they have been worked, in several point of views. Under e-business era, therefore any IT project is being implemented in more complex, dynamic and uncertain environment than traditional. That is, project leaders must consider more factors to control projects including resources, quality, risks, and technologies, and human resources. The project organizations and software corporations thus need to develop and establish new concepts or methodologies to manage e-business projects. In this point of view, an entropy model in this study is introduced for estimating and managing the uncertainty in project control using multi-attributes of project meeting. This paper proposes a new frame work based on entropy model using project meeting results to consider eIT project environment with a small pilot study.

QFD와 AHP를 이용한 ITS 프로젝트관리자 핵심역량 연구 (A Study on Core Competencies of ITS Project Managers Using QFD and AHP)

  • 이봉우;김자희;김우제
    • 한국IT서비스학회지
    • /
    • 제10권1호
    • /
    • pp.89-103
    • /
    • 2011
  • ITS (Intelligent Transportation System) has been more popular but ITS project managements remain complex because of diverse stakeholders and multidisciplinary processes of ITS. The multidisciplinary process enforces specialized competencies on ITS project managers comparing to other system integration project managers. In this paper, we derived core competencies of ITS projects from previous researches, built the hierarchy of the competencies, and employed AHP (Analytic Hierarchy Process) surveying ITS project managers and auditors with the hierarchy. Finally, we analyzed the difference of evaluation model on ITS project manager between project managers and auditors using Mann-Whitney U test. Additionally we suggest a method of building MECE (Mutually Exclusive and Collectively Exhaustive) structure for AHP using the HoQ (House of Quality). We expect our model to give some inspirations for raising capable ITS project managers and selecting a proper project manager for an ITS project.

조직의 SEPMC 자체 평가에 유용한 참조기준 개발 (On the Development of Reference Guidelines for Self-evaluation of Organization's Systems Engineering and Project Management Capability)

  • 최영길;이재천
    • 시스템엔지니어링학술지
    • /
    • 제8권2호
    • /
    • pp.27-36
    • /
    • 2012
  • In modern systems, the operational capability of the system to the user needs is expanding rapidly to accommodate the size of the system, functionality, and interfaces are becoming increasingly complex. Accordingly, the systematic practice of project management and systems engineering in the system development process, as an important element in successful systems development is recognized. EIA/ANSI 632, ISO/IEC15288, the leading international standard for systems engineering and is the leading international standard on project management PMBOK. CMMI is also contains information about the activities of project management and systems engineering and worldwide basis to assess the maturity of an organization's ability to develop system being used. But CMMI model is too complex of structure and there are many overlap parts of contents. So there are many problems for members of organization understanding all of CMMI model, applying organization and, achieving improvement activity. In this study, through the analysis and integration between the model and the related standard coverage activities essential for successful systems development in organizations that require systems engineering and project management capabilities(SEPMC) for self-assessment and continuous improvement activities to provide useful reference guideline.