Co-operative (Co-op) education is a college program that integrates classroom studies with paid, productive and real-life work experience. A mandatory Co-op program for the degree is introduced with a sample curriculum from the Mechanical Engineering program at University of the Pacific. The mandatory Co-op program requires a minimum of 7 months of work experience with the option of pursuing a 12 month program. Students also have the opportunity of participating in an Engineering Industry Fellowship (EIF) program or an International Engineering Co-op program (IECP). University of the Pacific has engineering programs in Bio-Engineering, Civil Engineering, Computer Engineering, Electrical Engineering, Engineering Management, Engineering Physics, and Mechanical Engineering. All the programs are ABET-accredited except the Bio-Engineering program, which is relatively new. The Co-op employers evaluate the Co-op students at the end of the working period before returning to school, and the students also provide an evaluation of their Co-op experience. Co-op employer evaluations of student work are used in ABET assessment methods developed by the Mechanical Engineering program at University of the Pacific.
오늘날 산학 협력은 기업과 학계 상호간의 발전을 위해 매우 중요한 역할을 담당하고 있다. 기업은 학교 연구 기관의 우수한 자원과 시설을 충분히 이용하여 새로운 제품 개발을 위한 기술을 얻을 수 있는 이점이 있고 학교는 기업 현장의 실제적인 문제에 대한 연구를 시행함으로써 이론적 연구의 실제적 적용이라는 성과를 가질 수가 있다. 그러나 대부분의 산학 협력모델은 주로 대학원 연구 기관과 기업 프로젝터 중심에서 이루어지고 주로 연구 프로젝터의 형태를 띠고 있거나 학생들의 취업을 위한, 현장실습, 기업 현장 인력 보수 교육이 주를 이루고 있다. 하지만 공학 교육의 큰 주체라고 할 수 있는 학부 단위의 교육 과정과는 다소 거리가 있는 것이 현실이며 그러한 학부 단위의 산학 협력 모델은 구축하기에 있어 프로그램의 기획, 재정, 기업의 무관심과 같은 여러 가지 제약이 따르는 것이 현실이다. 이에 본 논문은 기존의 산학 협력 혹은 기업 공모전과는 색다르게 전개 되고 있는 LG 전자 디지털 디스플레이 본부에서 시행 하는 디스플레이 아이디어 공모전을 소개하고 이를 통하여 기업과 학교의 효용성과 국내에서 새로운 산학 협력 모델을 제시 하고자 한다.
Generally, a PLM education program in university consists of lectures of theory, software lab and software development raining as an advanced subject. Most industries want more than these, such as practical problem solving capabilities, teamwork skills and engineering communications including human relationship, rhetoric, technical writing, presentation and etc. Problem-Based Learning is a problem-stimulated and student-centered teaming method, and an innovative education strategy for collaborative and self-directed learning by applying real world problems. Education paradigm changes from "teaching" to "learning" accomplished by team working, and students are encouraged to develop, present, explain and defense their ideas, suggestions or solutions of a problem, and the "cooperative teaming" proceeds spontaneously during team operations. Co-operative education program is an into-grated academic model and a structured educational program combining classroom learning with productive work experience in a field related to a student's academic or career goals. Based on the partnership between academic institutions and industries, students are engaged in real and productive "work" in the industry, in contrast with merely observing. In this paper, PBL with Co-op program is suggested as an effective approach for PLM education, and we made and operated a PBL-based education course with industry co-op program. The Co-op education in industry accompanied with the PBL course in university can improve practical problem solving capabilities of students, including modeling and management of P3R(Product, Process, resource and Plant) using commercial PLM software tools. By the result, we found this to be an effective strategy for helping students, professors and industries succeed in engineering education, especially PLM area.
Objective: The aim of this paper is to introduces Hyundai Heavy Industry's ergonomic risk assessment tool, H-OWAS, which is considering work load and frequency compared to the OWAS. Background: As prevalence of work-related musculoskeletal disorders(WMSDs) in ship building industries has been much higher than that in other industries, most of the large scaled corporations have implemented their own prevention program since legislation on the prevention of WMSDs had introduced in 2003. Method: This paper introduces WMSDs prevention program, HEMP(HHI Ergonomics Management Program) which consists of risk assessment, improvement efforts of working environments, medical treatment and training/evaluation and describes how to operate the program. We also describe application of OWAS method considering work load and frequency for risk factor analysis(H-OWAS) and shows methodology for assessing the ergonomic risk factor. And comparison of the assessment results between OWAS and H-OWAS is carried out by statistical analysis. Result: There was statistically significant difference in the assessment results between OWAS and H-OWAS, and regression shows H-OWAS explains the borg's scale of perceived exertion more clearly than OWAS. Conclusion: H-OWAS has been proved more effective tool than OWAS to evaluate ergonomic risk factor under real working condition. Application: H-OWAS can be widely applied to the many other companies when implementing the ergonomics risk assessment.
Graduate Students in engineering at The University of Tokushima can take part in an educational program which is offered long-term internship opportunities (at a company or the government). Onishi, one of authors, took part in this educational program. She is studying environmental conservation at the university and is interested in environmental conservation activities led by residents. Striking a balance between environmental conservation and human economic activities is seen as important to society. However, the continuing in environmental conservation activities is difficult. Therefore, collaborative activities attract attention as a way of the continuing in environmental conservation activities. A person called "co-coordinator" is a key to make many people to participate in the sustainable collaboration activities. The main role of co-coordinator is connecting people who are interested in environmental conservation activities. The purpose of joining in environmental conservation activities is different from person to person depending on where they belong to or where they live. Onishi took part in the educational program to learn the techniques of adjusting the differing interests. She did her internship at environmental consulting company in Kamikatsu town, Tokushima prefecture. She participated in several environmental conservation activities and work experience as a coordinator. Through this experience, she learned not only the technique but also the difficulty of the work. This paper reports the results obtained from her experience.
본 연구는 대규모 온실에서 작업관리와 인력관리 및 병해충 모니터링을 위한 HRM 프로그램을 개발하여 현장적용 시험을 수행하였다. 작업자의 전용 앱으로 작업지시와 현장의 작업내용 및 병해충 발생에 대한 정보를 입력할 수 있다. 관리자는 작업자의 작업내용별 노동시간과 작업속도, 작업품질을 평가하여 기록하고 이를 토대로 작업별 작업속도 기준을 설정할 수 있으며, 작업일정 수립이나 작업 투입인원의 결정이 용이하게 될 것이다. 따라서 고용인원을 효율적으로 운용하면서 작업수행을 용이하게 할 수 있으며, 작업자의 수급계획을 세울 때도 용이하게 사용될 수 있다. 시기별 작업분석을 통해 고용인원의 적정성을 평가할 수 있고 정규인력과 비정규 인력에 대한 수급비율을 조정할 수 있게 할 것이다. 작업자의 실시간 작업성과를 공개하며 작업자 간 경쟁을 유도하고 기준작업량 이하를 달성하는 작업자의 재교육 및 작업방법 개선을 통해 작업효율의 상승이 가능하다. 실증현장에서 분석해본 파프리카의 작업은 순치기, 수확 및 유인작업이 모든 작업시간의 91%이상을 차지하며, 수확작업보다 유인 및 순치기 작업시간이 두배정도 더 많은 것으로 나타났다. HRM 프로그램을 도입하기 전과 도입한 이후 가장 노동부하가 높은 시기인 수확과 유인 및 순치기 작업이 동시에 진행되는 시기를 비교했을 때 HRM 프로그램의 도입으로 37%의 작업량 향상을 가져왔다.
Purpose: This paper was attempted to focused on the analysis of job stress and job satisfaction according to the moderating effects of social support. Method: Data collected from 302 staff nurses in 2 general hospitals, with self-reporting questionnaires(Wolfgang's HPSI, modified Hagihara's social support, and MSQ). Descriptive statistics, Cronbach's alpha, Pearson correlation, ANOVA, and moderated regression analysis were used. Result: The subjects exhibited significantly highest level of 'the work and patients' conditions'. The perceived job stress was negatively correlated with supervisor and co-workers' support, and job satisfactions. Also supervisor and coworkers' support were positively correlated with job satisfactions. The main factor that affected the job satisfactions was 'work and patient conditions' and it was explained 35.5% out of the total variance of the job satisfactions with 'the work load and disturbing factor', 'supervisor support' and 'co-workers' support'. Supervisor support moderated the relationships between 'the patient care responsibilities and career development factor' and satisfaction. Conclusion: For developing the stress management program for hospital nurses, 'the work and patients' conditions', and the strategies of strengthening 'supervisor and co-workers' support' should be considered. In addition to, it may be considered to examine the effects of social support on the other criterion variables.
KOREATECH has operated a Co-op program called 'Industry Professional Practice (IPP)' that allows students to work full-time in relevant industries for at least four months since 2012, and also developed a systematic performance evaluation model on the basis of Kirkpatrick's four-stage assessment model. This study aims to share KOREATECH's Levels 3 and 4 evaluation results which are clearly what practitioners and academic investigators of cooperative education want to know the most. For this purpose, a questionnaire survey was conducted for KOREATECH graduates and their superiors to examine influence of IPP experiences on employment and job performance. A total of 730 alumni who graduated within last 5 years participated in the survey, with 213 (29.2%) having IPP experiences, and 162 superiors rated their subordinates on seven performance criteria. The analysis results were mixed. On the one hand, employment rate of IPP participants was 89.7%, compared to 86.8% of alumni without field experiences. Participants of the IPP program were more satisfied with their salary and felt less unfair about their career and promotion opportunities than alumni without field experiences. On the other, superiors rated their subordinates without IPP experiences slightly more positively than IPP participants in terms of job performance. These contrasting results are judged to show strengths and weaknesses of the IPP program at the same time. The limitations of the study and future research directions are discussed at the last part.
Since the Fukushima accident in 2011, the importance of the electrical systems in nuclear power plants (NPPs) has been emphasized. The result has been that NPP regulators are enhancing their monitoring of loss of offsite power (LOOP) events. Korea Hydro & Nuclear Power Co. (KHNP) is reviewing the status and issues related to LOOPs, and is attempting to establish specific countermeasures to prevent LOOPs, because they can have severe consequences in the complicated maintenance schedule during an outage. A starting point for preventing LOOPs is the control of the loss of voltage (LOV)-initiating components. In order to reflect this in the risk assessment program, an LOV monitor is being developed for use during plant outages.
시각 프로그램은 GUI(graphic user interface)모듈과 프로세스 로직(logic) 모들로 구성된다. 시각 프로그램의 빠른 개발을 위한 대부분의 RAD(rapid application development)툴 들은 큰 규모의 시각 프로그램 개발에 있어 다중 개발자 참여를 지원하지 않는다. 또한 기존의 공동 작업 도구는 우선권 및 병행성(concurrency) 제어에 있어 유연성이 부족한 단점이 있다. 본 논문은 시각 프로그램 개발에 있어 개발자간 즉각적인 의견 교환을 통한 분업 개발을 지원할 수 있는 공동 개발 환경을 제안하다. 제안하는 공동 개발 환경은 개발자간 다양한 개발 정보 교환과 의견 수렴을 위한 통신 창을 제공하며 공동 작업 공간에서의 개발 공유 객체에 대한 접근 우선권 및 병행성 제어를 위한 실시간 작업 제어기를 포함한다. 따라서 개발자들은 공동 개발 단계에서 충분하고 즉각적인 의견 수렴이 가능하고 공동 개발 과정에 대한 일관성과 신뢰성을 유지할 수 있다. 특히, 제안하는 공동 개발 환경은 대규모 시각 프로그램 개발에 있어 단일 개발자의 개발 부담을 줄이고 개발자의 개발 능력과 특성에 따라 분산 형태의 공동 개발 참여를 유도하여 관련 시각 프로그램 개발 속도와 효율을 높일 수 있을 것으로 기대된다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.