• 제목/요약/키워드: claim factors

검색결과 174건 처리시간 0.024초

건축턴키공사 입찰.계약 단계에서의 클레임 예방을 위한 클레임요인 분석 및 대응방안에 관한 연구 - 국내대형건축턴키공사 사례중심으로 - (A Sduty of Analyzing Claim Factor and Making Strategies to Prevent Claim in Bidding and Contracting Stage for Architectural Turn-Key Project)

  • 윤준선;백준홍
    • 한국중재학회지:중재연구
    • /
    • 제13권2호
    • /
    • pp.353-376
    • /
    • 2004
  • In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of pre-construction(from a bid to a contract) owing to the specialties of the turn key constructions. So the claim factors of the Korean turn key constructions were abstracted through the literature searches, the site document examinations, the case studies and the interviews with the experts. When the technicians meeting the interior turn key constructions for the first time and working here now are well acquainted with only these factors, many claims will be prevented. By analysing the degree of claims by claims factors through the questionnaires to the experts about the abstracted factors and surveying the amount of the claims through the case studies, what factors exerted how much of influence on the claims was tested and analyzed. Proposing the response devices to the factors affecting the claims much led the technicians in charge of internal turn key constructions to the prevention and the proper solution of the site claims.

  • PDF

건축턴키공사 초기 단계에서의 클레임 방지를 위한 클레임요인 분석 및 대응방안에 관한 연구 - 국내공사 사례중심으로 - (A Study of Analyzing Claim Factor and Making Strategies to Prevent Claim in Early Stage for Architectural Turn-key Project - Focusing on Domestic Project -)

  • 윤준선;유병억
    • 한국건축시공학회지
    • /
    • 제6권1호
    • /
    • pp.93-99
    • /
    • 2006
  • In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of pre-construction(from a bid to a contract) owing to the specialties of the turn key constructions. So the claim factors of the Korean turn key constructions were abstracted through the literature searches, the site document examinations, the case studies and the interviews with the experts. When the technicians meeting the interior turn key constructions for the first time and working here now are well acquainted with only these factors, many claims will be prevented. By analysing the degree of claims by claims factors through the questionnaires to the experts about the abstracted factors and surveying the amount of the claims through the case studies, what factors exerted how much of influence on the claims was tested and analyzed. Proposing the response devices to the factors affecting the claims much led the technicians in charge of internal turn key constructions to the prevention and the proper solution of the site claims.

건설 프로젝트 초기단계에서의 클레임 방지를 위한 클레임 요인 영향도 분석에 관한 연구 - 턴키공사 사레 중심으로 - (A Study on Analyzing Effect of Claim Factoy to Prevent Claim in Early Stage for Construction Project - Focusing on Turn-Key Project -)

  • 윤준선;서춘택
    • 한국중재학회지:중재연구
    • /
    • 제15권1호
    • /
    • pp.95-112
    • /
    • 2005
  • In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of pre-construction(from a bid to a contract) owing to the specialties of the turn key constructions. So the claim factors of the Korean turn key constructions were abstracted in antecedent paper. When the technicians meeting the interior turn key constructions for the first time and working here now are well acquainted with only these factors, many claims will be prevented. By analysing the degree of claims by claims factors through the questionnaires to the experts about the abstracted factors and surveying the amount of the claims through the case studies, what factors exerted how much of influence on the claims was tested and analyzed. Studying and Managing the factors affecting the claims much led the technicians in charge of internal turn key constructions to the prevention and the proper solution of the site claims.

  • PDF

설계시공일괄입찰공사의 설계변경 클레임요인 분석에 관한 기초 연구 (Preliminary Study on the Factors Analysis of Change Order-Claim in Design-Build Project)

  • 류혁준;박병주;유승규;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.129-130
    • /
    • 2012
  • Although the order of Design-Build is being expanded by increasing construction scale and demanding hybrid function, the suitable regulation of the contracts is not settled. Design-Build is way by government because there are big construction of much government leading in contract relation high position occupy. So, case that prebendary's claim institution develops by litigation is very rare. But, recently Design-Build is magnified. So, these dispute factors is becoming visualization gradually. The contract system is needed to be consistent by international standard to deal with the problem. This study suggests the useful solutions in detail concerned with the main factor of change order claim by each Design-Build phases through practical sorting and analysis of the causes of Change Order-Claim.

  • PDF

클레임 핵심관리요인을 기반으로 한 건설공사 중의 클레임 관리 (Claim Management during Construction based on Key Claim Management Factors)

  • 이준형;이현수;박문서;김인호
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.463-468
    • /
    • 2007
  • 건설 프로젝트는 다양한 이해관계자들이 참여하기 때문에 당사자들 간의 분쟁이 발생하기 쉬우며, 이러한 분쟁은 프로젝트 참여자들에게 있어 매우 중요한 사안이다. 최근 클레임의 제기가 증가하고 있지만, 클레임의 상당수가 청구한 금액에 대한 보상을 제대로 받지 못하고 있다. 이처럼 제기된 클레임이 목적을 달성하지 못하는 가장 큰 원인에는 건설 프로세스 진행 중 클레임에 대비한 관리가 제대로 이루어지지 않는 점이다. 불가피한 클레임에 대해서는 부당하게 피래를 입은 이해관계자가 적절한 보상을 받도록 미리 대비책을 마련하는 것이 필요하다. 그러므로 현장에서 실무자들에 의해 수행되는 관리 업무들이 어떤 것들이 있고 그 업무들이 클레임과 어떤 관련이 있는지를 파악하는 것은 매우 중요하다. 본 연구의 목적은 클레임 핵심관리요인과 관련 있는 관리 업무의 분석을 통해 효과적인 클레임관리방안을 제안하는 것이다.

  • PDF

Decision of Abnormal Quality Unit Lists from Claim Database

  • Lee, Sang-Hyun;Lee, Sang-Joon;Moon, Kyung-Li;Kim, Byung-Ki
    • Journal of Information Processing Systems
    • /
    • 제4권3호
    • /
    • pp.113-120
    • /
    • 2008
  • Most enterprises have controlled claim data related to marketing, production, trade and delivery. They can extract the engineering information needed to the reliability of unit from the claim data, and also detect critical and latent reliability problems. Existing method which could detect abnormal quality unit lists in early stage from claim database has three problems: the exclusion of fallacy probability in claim, the false occurrence of claim fallacy alarm caused by not reflecting inventory information and too many excessive considerations of claim change factors. In this paper, we propose a process and methods extracting abnormal quality unit lists to solve three problems of existing method. Proposed one includes data extraction process for reliability measurement, the calculation method of claim fallacy alarm probability, the method for reflecting inventory time in calculating claim reliability and the method for identification of abnormal quality unit lists. This paper also shows that proposed mechanism could be effectively used after analyzing improved effects taken from automotive company's claim data adaptation for two years.

국내 중재사례를 통한 주요 건설 클레임 예측 방안 (Forecasting the Effects of the Claims in the Korean Construction Industry)

  • 김지혜;임혜경;최재현
    • 한국건설관리학회논문집
    • /
    • 제17권5호
    • /
    • pp.35-44
    • /
    • 2016
  • 건설 프로젝트의 특성 상, 예측하기 어려운 리스크 인자에 노출되기 쉽고, 다양한 이해관계자들이 함께 동일 프로젝트를 수행하는 과정에서 발생하는 분쟁이 주요 리스크 인자로 인식된다. 다양한 분쟁은 주로 클레임 제기, 조정, 중재, 그리고 소송으로 나타나며 막대한 비용과 시간의 손실을 초래할 수 있다. 따라서 국내 건설기업의 건설 프로젝트 수행과정에서 발생하는 클레임, 분쟁의 유형과 원인을 도출하고, 각 원인의 영향도 분석을 통해 클레임, 분쟁관리에 대한 적극적인 대비가 필요하다. 본 연구는 국내 건설프로젝트에서 발생한 클레임, 분쟁 판례를 수집하여 유형과 원인에 따른 빈도와 영향도를 정량화 하고, 중요도 분석을 통해 주요 클레임 원인을 도출하였다. 도출된 주요 클레임 원인은 공사변경, 상대방의 부당한 행위, 공사 지연에 관한 클레임으로 해당 클레임 원인이 발생할 경우 클레임 비용에 대한 예측을 회귀 모형화 하였다. 주요 클레임 원인별 영향도 예측 결과 공사변경의 경우 전체공사비의 16.1%, 상대방의 부당한 행위는 전체공사비의 5.7%, 공사 지연은 전체공사비의 2.7%로 발생하는 것으로 분석되었다. 본 연구결과를 통해 국내 건설산업의 주요 클레임 요인을 도출하고, 클레임 비용을 예측함으로써 보다 적극적인 클레임 대비에 활용 될 수 있도록 하였고, 더 나아가 국내 건설기업의 프로젝트 관리 역량 평가 및 향상에 기여하고자 하였다.

손해사정회사 종업원의 직장만족 결정요인 연구 (A empirical study on the Employee's Workplace Satisfaction for Insurance Claim adjusting company)

  • Kim, Jaetae;Yoo, kyungjin;Choi, Youngjin;Kim, Jongwon
    • 한국재난정보학회 논문집
    • /
    • 제11권2호
    • /
    • pp.245-252
    • /
    • 2015
  • 태풍 등 재난발생 시에 손해액을 평가하는 손해사정회사 종업원들의 직장만족은 손해평가업무에 영향을 미치며 종국적으로는 피해자의 보상만족에 영향에 미치게 된다. 따라서 종업원의 직장만족은 재난피해자의 보상만족에 영향을 미치는 요인 중 하나이다. 본 연구는 손해사정회사 종업원의 직장만족 결정요인에 대한 실증연구로 연구결과는 종업원들의 심리차원의 요인, 조직차원의 요인 및 개인차원의 요인이 종업원들의 직장만족에 통계적으로 유의하게 영향을 미치는 것으로 나타났다. 그중에서 심리차원의 요인이 가장 크게 영향을 미치고, 다음으로 조직차원의 요인과 개인차원의 요인이 비슷한 크기로 영향을 미치는 것으로 나타났다. 인지차원의 요인은 종업원의 직장만족에 통계적으로 유의하지 않은 것으로 나타났다. 손해사정회사들은 종업원직장만족의 향상을 위하여 이러한 연구결과를 활용할 수 있을 것이다.

국내 아파트공사의 클레임요인 분석 및 예방대책 (Analysis and Prevention Countermeasures of Claim factors in Domestic Apartment Construction)

  • 임종찬;송용식;김선국;한충희
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.341-344
    • /
    • 2002
  • 건설시장의 개방 분위기와 더불어 클레임에 대한 부정적 시각의 변화로 인해 국내 건설업계에도 클레임의 제기가 조금씩 증가하고 있는 추세이다. 그러나 아직도 국내 건설업계는 발주자 우위의 오랜 관행으로 인해 많은 클레임요인이 잠재적으로 내재해 있는 상태이며, 이러한 요인들이 관리 및 해결되지 않으면 앞으로 많은 건설분쟁이 발생하리라는 것은 분명한 사실이다. 이에 본 논문은 국내 아파트공사를 대강으로 클레임요인을 조사한 후 설문분석을 통해 클레임요인들이 공기, 원가, 품질과 같은 공사관리항목에 미치는 영향도를 분석하여 가장 먼저 개선되어야 할 클레임요인들을 도출하였으며, 이러한 클레임요인이 발생되는 원인을 관련 계약조항 상에서 찾아 문제점을 지적하고, 예방대책을 제시하였다.

  • PDF

Usefulness of medical review in the insurance claims

  • Lee, Eui-Kwan;Hwang, Jin-Sup;Lee, Sin-Hyung
    • 보험의학회지
    • /
    • 제28권1_2호
    • /
    • pp.31-35
    • /
    • 2009
  • Background : Many of internists have been working for insurance industry. Insurance medicine is use of medical knowledge for insurance industry. There is social role of insurance medicine in terms of soundness of insurance administration. Recently social role of internists also have been being watched. Although theme of insurance medicine is medical risk selection, insurance claims administration also needs medical experts'opinion. There are not any corroborative study of medical consulting for insurance claims. Among insurance industry, someone called this medical review of insurance claims as 'medical claims review'. Aim : To investigate usefulness of medical review of insurance claims. Design : Questionnaire survey with claim staffs in one of insurance claim adjustment company in Korea. Methods : 265 claim staffs were divided into 4 groups and conducted survey using a questionnaire of 20 questions. Utility score, job satisfaction score, and difficult factors of claims administration were measured. Results : Utility score and job satisfaction score are highest in medical claims review group. The most difficult in claim administration to claim staffs was demonstrated to medical knowledge. Conclusion : Medical review of insurance claims is proved to be worthy. Document-based consulting method, namely medical claims review, is more useful than telephone-based simple query among claim staffs...Subjects of the medical claims review are medical record and it's principle is independent medical examination with evidence-based approach, it also has role of protecting fraud of insurance claims. Two main question types of medical claims review are verification and advice.

  • PDF