• 제목/요약/키워드: civil works

검색결과 767건 처리시간 0.024초

A Prototype of Distributed Simulation for Facility Restoration Operation Analysis through Incorporation of Immediate Damage Assessment

  • Hwang, Sungjoo;Choi, MinJi;Starbuck, Richmond;Lee, SangHyun;Park, Moonseo
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.339-343
    • /
    • 2015
  • To rapidly recover ceased functionality of a facility after a catastrophic seismic event, critical decisions on facility repair works are made within a limited period of time. However, prolonged damage assessment of facilities, due to massive damage in the surrounding region and the complicated damage judgment procedures, may impede restoration planning. To assist reliable structural damage estimation without a deep knowledge and rapid interactive analysis among facility damage and restoration operations during the approximate restoration project planning phase, we developed a prototype of distributed facility restoration simulations through the use of high-level architecture (HLA) (IEEE 1516). The simulation prototype, in which three different simulations (including a seismic data retrieval technique, a structural response simulator, and a restoration simulation module) interact with each other, enables immediate damage estimation by promptly detecting earthquake intensity and the restoration operation analysis according to estimated damage. By conducting case simulations and experiments, research outcomes provide key insights into post-disaster restoration planning, including the extent to which facility damage varies according to disaster severity, facility location, and structures. Additional insights arise regarding the extent to which different facility damage patterns impact a project's performance, especially when facility damage is hard to estimate by observation. In particular, an understanding of required type and amount of repair activities (e.g., demolition works, structural reinforcement, frame installation, or finishing works) is expected to support project managers in approximate work scheduling or resource procurement plans.

  • PDF

반도체 제조회사의 근골격계부담작업 유해요인조사 실태와 개선방안 (A Study on the Risk Assessment and Improvement of Musculoskeletal Burden Works in the Semiconductor Manufacturer)

  • 정예영;박재희
    • 한국안전학회지
    • /
    • 제37권1호
    • /
    • pp.49-54
    • /
    • 2022
  • In Korea, companies which have work-related musculoskeletal burden works should have conducted legal risk assessments every three years from 2004 onwards. However, due to problems with the legal definition of work-related musculoskeletal burden works, some companies may have been exempted from the risk assessment even though their workers still experience work-related musculoskeletal pain. For example, the manufacturing process used by a particular semiconductor manufacturing company involved a great deal of legal musculoskeletal bueden works. However, this company eliminated the musculoskeletal burden works by continuously introducing automated processes, and finally, in 2016, all work which was legally defined as musculoskeletal burden work were removed from the company's manufacturing process. Nevertheless, in a 2016 survey, 9.6% of the company's workers still complained of musculoskeletal pain, and in a 2019 survey this proportion actually increased to 15.7%. This incident demonstrates the limitations and problems of the current legal risk assessment of work-related musculoskeletal burden work. Therefore, this study proposes two improvements to solve these problems. Firstly, it is necessary to broaden the current legal definition of work-related musculoskeletal burden works. For example, vibration risk factors and push/pull tasks that are currently missing from the definition should be included. Secondly, it is proposed that a survey on musculoskeletal pain should be conducted for all workers, regardless of whether they are engaged in musculoskeletal burden works. The results of this study could be used to improve the legal risk assessment of work-related musculoskeletal burden works.

A review of rotorcraft Unmanned Aerial Vehicle (UAV) developments and applications in civil engineering

  • Liu, Peter;Chen, Albert Y.;Huang, Yin-Nan;Han, Jen-Yu;Lai, Jihn-Sung;Kang, Shih-Chung;Wu, Tzong-Hann;Wen, Ming-Chang;Tsai, Meng-Han
    • Smart Structures and Systems
    • /
    • 제13권6호
    • /
    • pp.1065-1094
    • /
    • 2014
  • Civil engineers always face the challenge of uncertainty in planning, building, and maintaining infrastructure. These works rely heavily on a variety of surveying and monitoring techniques. Unmanned aerial vehicles (UAVs) are an effective approach to obtain information from an additional view, and potentially bring significant benefits to civil engineering. This paper gives an overview of the state of UAV developments and their possible applications in civil engineering. The paper begins with an introduction to UAV hardware, software, and control methodologies. It also reviews the latest developments in technologies related to UAVs, such as control theories, navigation methods, and image processing. Finally, the paper concludes with a summary of the potential applications of UAV to seismic risk assessment, transportation, disaster response, construction management, surveying and mapping, and flood monitoring and assessment.

IT 기반의 지하 대공간 설계/안정성 평가 시스템 개발 (Development of IT-based Cavern Design/Stability analysis System)

  • 유충식;김선빈;조완기;유광호;박인준
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 춘계 학술발표회 초청강연 및 논문집
    • /
    • pp.34-41
    • /
    • 2008
  • This paper concerns the development of a IT-based tunnel design system within the framework of artificial neural networks(ANNs). The system is aimed at expediting a routine cavern design works such as determination of support patterns and stability analysis of the selected support patterns. The detailed system development process and functions of sub modules are provided in this paper.

  • PDF

불법매립폐기물에서 선별된 토사의 지반환경공학적 특성 분석 (Geoenvironmental Characteristics of Sorted Soil From Unregulated Landfill Wastes)

  • 정하익;김상근;류권;이용수
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2001년도 봄 학술발표회 논문집
    • /
    • pp.605-610
    • /
    • 2001
  • There has been a steady increase in geoenvironmental engineering projects where geotechnical engineering has been combined with environmental concerns. Many of these projects involve some investigation on geoenvironmental characteristics related to waste landfill and waste soil. This study was carried out to evaluate the geoenvironmental properties of sorted soil from unregulated landfill wastes. The physical, mechanical, and environmental Properties of sorted soil were investigated for utilization in civil works.

  • PDF

중기 밀턴의 종교적, 윤리적, 정치적 이상주의 -그의 영웅적 소네트와 산문의 관련성을 중심으로 (Religious, Ethical, and Political Idealism in Middle Milton: Focusing on the Relationship between His Heroic Sonnets and Prose Works)

  • 최재헌
    • 영어영문학
    • /
    • 제56권1호
    • /
    • pp.135-156
    • /
    • 2010
  • In the 1640's and 1650's, Milton wrote many prose works on a variety of topics such as education, church polity, divorce, censorship, regicide, tithing, civil liberty, and blindness. Much of his prose shows us turbulent decades of English history. In this period, he also published his first collection of poems and wrote sonnets. He wrote 23 sonnets in his life, and many sonnets Milton wrote after he had become Latin secretary are occasional poems in historical time. Milton's sonnets, as Annabel Patterson says, are a marker in his personal development, in his life, in his career as a writer, and in the history of his time. Four sonnets (15, 16, 17, 23), written between 1648 and 1655, were not published in the collected edition of Milton's poem in 1673. These sonnets, addressed to leaders of the Parliamentary party during the English revolution, Thomas Fairfax, Oliver Cromwell, and Henry Vane, and to his friend Cyriack Skinner, have been known as "commonwealth" sonnets. They are also called as "heroic sonnets" because they have the common style and theme with his later heroic epic poems. These sonnets were finally published in 1694 by Milton's nephew John Phillips. Milton was interested in religious, domestic, and political liberty for his lifetime, and his heroic sonnets also deal with these ideas of liberty. Milton asks civil liberty from Fairfax, freedom in religion from Cromwell, and from Vane for the reconciliation of both. The aim of this article is to examine how the rhetorical strategies of his "left-handed" prose interact with those of his "right-handed" poetry. This paper explores the relationship between Milton's heroic sonnets and his prose works, such as The Second Defense of the People of England, A Treatise of Civil Power, and The Likeliest Means to Remove Hirelings. Milton deals with the critical issues of religious tolerance, the separation of church and state, liberty of conscience and defense of his blindness, and attempts to define the statesman's role in peacetime England in these heroic sonnets and prose works.

공공 건설공사 발주방식에 따른 비용성과 비교연구 (Comparison of Cost Performance for Delivery Methods on Public Construction Projects)

  • 이유섭;강태경;신은영;박원영
    • 대한토목학회논문집
    • /
    • 제33권6호
    • /
    • pp.2575-2582
    • /
    • 2013
  • 공공건설공사 발주제도 운영에 있어 기술경쟁을 지향하는 턴키 및 대안방식 등 설계 시공일괄방식의 경우, 시설물의 품질향상 및 건설기술 발전에 기여하였음에도 불구, 계약되는 공사비가 설계 시공 분리발주방식을 적용하는 공사보다 높아 예산낭비 우려가 있다는 지적과 함께 수주독점, 입찰담합, 심의비리 등의 문제가 쟁점이 되고 있다. 그러나 실제 발주방식별 사업성과와 효과에 대해 정밀 비교분석한 사례가 없는 실정이며, 단순히 낙찰률 등 사업의 한정된 일반적 정보만으로 사업효과를 논의하고 판단하는 것은 자칫 오류를 범할 우려가 있다. 이에 공공 건설공사를 대상으로 계약에서 준공에 이르기까지 실제 집행한 공사비 자료를 광범위하게 조사하여 비용의 투입구조 및 변동추세 등 발주방식별 특성을 비교분석하고 공공건설공사 발주제도의 올바른 이해와 효율적 운영을 도모하고자 한다.

건설현장 물체에 맞음 사고 저감을 위한 줄걸이 작업 전문 자격제도 도입에 관한 연구 (A Study on the Introduction of a Rigging and Slinging Certificate System to Reduce a Struck by Object Accidents)

  • 염춘호;이진호;박현
    • 한국안전학회지
    • /
    • 제33권5호
    • /
    • pp.92-100
    • /
    • 2018
  • According to 'The Analysis of Industrial Accidents in 2016' by Ministry of Employment and Labor, the number of deaths caused by accidents in the construction field is 391, accounting for 47% of 826 industrial fatalities in all industries. The breakdown of the 391 fatalities of the construction industry shows that 'struck by an object' accident had 30 fatalities, the 3rd in frequency following falling (235) and crashing (32) accidents. This study aims to explore ways to reduce the 'struck by an object' accident with emphasis on safety education and certificate system for rigging and slinging works. This study reviews literature on rigging and slinging works and analyzes 'struck by an object' accidents. The rules and regulation on the rigging and slinging works are also reviewed both for Korea and other countries with best practices in construction safety such as Singapore, Japan, U.K., and U.S. The rigging and slinging certificate systems of those countries are also reviewed to find any advantage in the construction safety management. In addition, a pilot rigging and slinging certificate system was executed in one of domestic construction site followed by two surveys: one on the riggers who participated in the pilot operation and the other on general managers in domestic construction sites. Based on the analysis of the 'struck by an object' accidents and pilot operation, this study proposes a rigging and slinging certificate system to reduce accidents, enhancing safety condition of construction sites. The certificate system was proposed in a way to accommodate working practice of construction sites. Depending on rigging careers and a crane load capacity, riggers are eligible to apply either basic or master certificate which makes difference in the level of rigging works. The safety condition of rigging and slinging work could be substantially enhanced if workers, managers, supervisors, administrators, and policy makers work together consistently.

ANALYSIS ON THE EVALUATION OF PROJECT EFFICIENCY BASED ON BUDGET EXECUTION: PLANNED OUTAGE MAINTENANCE (POM) FOR ELECTRICITY POWER PLANT

  • Sungkon Moon;Sangwon Han;Myoungwon Kang
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.66-73
    • /
    • 2011
  • With rapid industrialization, electric power consumption has been increasing every year in Korea and in other countries. The provision of additional power stations to produce more electricity is one possible response to this steady increase in consumption. Another alternative is to improve the efficiency of existing stations through timely and effective maintenance works. Since the construction of a new power plant involves a large amount of capital as well as difficulties in the selection of sites, the improvement of existing power stations' efficiencies is often a preferred solution. Therefore, this paper focuses on maintenance project management to address this issue. Among several types of maintenance works, this paper concentrates on planned outage maintenance (POM). This focus arises from the critical impact of POM on other maintenance work, as well as the entire process of electricity production. Unlike other maintenance work, POM is done on the basis of mid and long-term plans. In addition, only POM works are conducted during the outage of all power plants. To evaluate the efficiency of POM works, budget data relating to 164 POM projects between 2001 and 2008 was collected from 7 sites in South Korea. Data envelopment analysis (DEA) was selected as a methodology for evaluation. From this analysis, comparative study was used to determine the categories of projects that had performed well, and those with the most optimized budget structures. Moreover, through discussion with industry, this research develops a feasible proposed method by which to enhance the efficiency of POM projects.

  • PDF

실적공사비 적산방식 도입을 위한 조경공사 공종분류체계에 관한 연구 -주택단지 조경공사를 중심으로- (A Study of Landscape Construction Work Classification for System Instruction of New Estimation System based on Historical Construction data. - With regard to Housing Landscape Construction -)

  • 박원규;김두하;안동만
    • 한국조경학회지
    • /
    • 제25권1호
    • /
    • pp.82-99
    • /
    • 1997
  • The purpose of this study is to establish work classification system of landscape construction in order to offer the basis of new estimation system of public landscape construction. New estimation system is based on historical construction data. For application of this system, the standard work classification system is necessary. Because extensive cost data should be accumulated under an unified construction work classification system. In the study of new estimation system carried by KICT(Korea Institute of Construction Technology), landscaping works belong to earth work of civil engineering. It looks very unreasonable work classification, because landscape archtecture has its own specialties and professional domain. In this study, information classification systems in the construction industry and various landscaping works of housing developments are analysed. As a result. a standard work classification system of housing landscape construction is proposed in section VI-3. This standard work classification structure consists of three levels divisions (i.e large work division, middle work division, small work division) . Now in this study, housing landscape construction works are divided into four large works and twenty six middle works. According to work attributes, middle and small work division is possible to subdivide into details.

  • PDF