• Title/Summary/Keyword: change construction design

Search Result 893, Processing Time 0.031 seconds

A Study on Participating virtual model house on the web (웹기반 참가형 가상모델하우스에 관한 연구)

  • Woo Sung-Ho
    • Korean Institute of Interior Design Journal
    • /
    • v.14 no.3 s.50
    • /
    • pp.216-223
    • /
    • 2005
  • In this study, we would like to suggest a virtual model house where the users participate in the planning of the apartment directly in order to supply the apartment which is suitable for the fast change of the resident's characterization, multiplication, and preference in this like high-speed information society. The users have various preferences and demands in the high level information society. It is necessary for the architect to communicate with the users in order to suggest the various styles of habitats that one can treat various life style and life cycle which reflects the demand. In addition, the object of this paper is the construction and using of the participating virtual model house that the resident can plan the preferred space design of the main house before moving Into the apartment and change space design of the main house after moving into the apartment following the variety of life style and the changing of life cycle. Regarding the effect of this study, firstly, it is possible to supply the plate type following the user's preference in order to enhance the quality of uniformed type apartment. Secondly, it is possible to maintain and control the high quality building using sharing the building information with planning, construction, maintain, interior, and related company by constructing the database. Thirdly, the unified database which is constructed by XML can supply the effective environment of apartment information exchange between other companies.

Study on Design Change of a Pipe Affected by Liquid Droplet Impingement Erosion (액적충돌침식 영향 배관의 설계변경에 관한 연구)

  • Hwang, Kyeong-Mo;Lee, Chan-Gyu;Bhang, Keug-Jin;Yim, Young-Sig
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.35 no.10
    • /
    • pp.1097-1103
    • /
    • 2011
  • Liquid droplet impingement erosion (LDIE) is caused by the impact of high-velocity droplets entrained in steam or air on metal. The degradation caused by the LDIE has been experienced in steam turbine internals and high-velocity airplane components (particularly canopies). Recently, LDIE has also been observed in the pipelines of nuclear plants. LDIE among the pipelines occurs when two-phase steam experiences a high pressure drop (e.g., across an orifice in a line to the condenser). In 2011, a nuclear power plant in Korea experienced a steam leak caused by LDIE in a pipe through which a two-phase fluid was flowing. This paper describes a study on the design change of a pipe affected by LDIE in order to mitigate the damage. The design change has been reviewed in terms of fluid dynamics by using the FLUENT code.

Improving Constructability for Partnering in Large Hospital Construction Projects (대형병원 프로젝트의 시공성 증대를 위한 파트너링 모델 구축)

  • Kim Sang-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.3 s.19
    • /
    • pp.153-165
    • /
    • 2004
  • Most engineering tasks require collaboration between many users in major hospital construction projects that have many reconstructions. Loss and change orders occurred in factors such as information exchange, misunderstandings, advanced technology in hospital projects. Moreover, changes in context, costs, requirements, deadlines, etc. require negotiation of issues that may modify important project characteristics. The objective of this paper is to reduce reconstruction for the pre-construction process of hospital projects, reconstruction factors were analyzed in recent hospital construction project the system was established in order to solve reconstruction factors, and this system was validated through applying to the real project. Therefore it is a major challenge to make high level of communication and to have mutual understanding.

Predicting the Design Rainfall for Target Years and Flood Safety Changes by City Type using Non-Stationary Frequency Analysis and Climate Change Scenario (기후변화시나리오와 비정상성 빈도분석을 이용한 도시유형별 목표연도 설계강우량 제시 및 치수안전도 변화 전망)

  • Jeung, Se-Jin;Kang, Dong-Ho;Kim, Byung-Sik
    • Journal of Environmental Science International
    • /
    • v.29 no.9
    • /
    • pp.871-883
    • /
    • 2020
  • Due to recent heavy rain events, there are increasing demands for adapting infrastructure design, including drainage facilities in urban basins. Therefore, a clear definition of urban rainfall must be provided; however, currently, such a definition is unavailable. In this study, urban rainfall is defined as a rainfall event that has the potential to cause water-related disasters such as floods and landslides in urban areas. Moreover, based on design rainfall, these disasters are defined as those that causes excess design flooding due to certain rainfall events. These heavy rain scenarios require that the design of various urban rainfall facilities consider design rainfall in the target years of their life cycle, for disaster prevention. The average frequency of heavy rain in each region, inland and coastal areas, was analyzed through a frequency analysis of the highest annual rainfall in the past year. The potential change in future rainfall intensity changes the service level of the infrastructure related to hand-to-hand construction; therefore, the target year and design rainfall considering the climate change premium were presented. Finally, the change in dimensional safety according to the RCP8.5 climate change scenario was predicted.

A Study on The Possibility of BIM(Building Information Modeling) Application of Construction Management (건설사업관리의 BIM(Building Information Modeling) 적용 가능성에 관한 연구)

  • Shim, Jin-Kyu;Yi, Hye-In;Kim, Jae-Jun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.10 no.2
    • /
    • pp.49-60
    • /
    • 2010
  • The production process of construction industry is different from thing of the general manufacturing, likewise various participants make temporary teamwork for success of the project through sharing of information. But the each role of participants is individually changed to step in construction process stage and moreover it has complicated, entangled interests. The Construction Management was inducted for the effective management and operation of construction project. The Key of the Construction Management success depends on the cooperative relationship relation to major participants. The domestic construction system is difficult with many trial and errors for the frequent plan change. As the building are more bigger and complicated, Building Information Modeling is demanded design and maintenance. This evaluation was done by the trust on the system as well as Construction Management. And then it applies the BIM it analyzes the example of construcrion project.

A Study on the Design Development and Construction Process in British Airways London Eye (런던아이의 디자인 전개와 건립과정에 관한 연구)

  • Woo, Dae-Seung
    • Journal of architectural history
    • /
    • v.15 no.1 s.45
    • /
    • pp.7-27
    • /
    • 2006
  • This study aims to identify and analyze the factors that influenced the construction of London Eye which was led by private groups, including characteristics in progress, differentiated value in design, the combination of technology and design, and construction costs. The results of this study were the followings. 1) London Eye provides a new construction method for a landmark in the downtown in that the architects became the clients of the project which might have been hoarded, procuring the construction costs and completing it by themselves. 2) London Eye presents a space utilization method where undeveloped spaces in the downtown are used in three-dimensions by erecting a structure on the river with a minimum land. 3) The process of design, production and erection is propelled the realization of technical intention design with one system and from at the initial stage, the participation of the engineer where the designer is equal with you must accompany. 4) London Eye is endowed with strong shape by a circle in design concept, which is the simplest geometrical figure, and it provides organic relationship between the past and the present by utilizing historical elements in various ways. 5) The construction was completed through four phases including idea phase, promotion phase, turn-key contract phase, and design-build phase. The most critical factor to the success is derived from the direct contact with Involved companies from the production phase. 6) In a project facing many challenges in terms of technology, the design-build method proves to be a more effective method than turn-key contract in that it may more allocate risks and enable coherent implementation of the core concept in design. The organization for the design-build method was composed of three phases including general affairs, responsible contracting by sector, and cooperative system by sector. Since that was a new concept structure, high-level contractors who hadn't had existing cooperative relationships with one another formed new cooperative relationship, while collaborating companies who had long cooperated led the responsible contracting and sub-cooperative system, which resulted in reduction of risks and time. 7) The major factors to change design were the design characteristics, derived from a technically great combination, and the opening time. 8) A new erection method was applied to London Eye, a structure that overcame the limitation in land and period, and the process of installation demonstrated that it is an important value for the construction of a landmark in the city. 9) In spite of many visitors and tremendous operational income, the factors that London Eye fails to free itself from debts include the construction costs expended double than expected, and interest burden to the investments, which occurred in the course of procuring the costs. Absolute limit in time increased the construction costs, resulting in being a great obstacle in the course of operation.

  • PDF

Sight Distance at Crest Vertical Curves Under Consideration of Construction Errors (볼록형 종단곡선에서 시공오차를 고려한 정지시거에 관한 연구)

  • Lee, Myeong-Han;Kim, Dong-Nyong
    • Journal of Korean Society of Transportation
    • /
    • v.23 no.8 s.86
    • /
    • pp.153-162
    • /
    • 2005
  • This study is carried out to evaluate the sight distance change due to construction errors of vertical crest curves. Various design speeds and grades as well as various size of construction errors are incorporated in this study. After showing theoretical methodology numerical results are compared and analysed for the given ranges of parameters. New vertical curve change rate(m/%) is suggested to guarantee minimum sight distance under construction errors. As to the results, the reduction of sight distance are $2.8{\sim}21.3m$ at 120km/h, $2.0{\sim}15.1m$ at 100km/h, $1.4{\sim}10.6m$ at 80km/h, $1.0{\sim}7.5m$ at 60km/h $0.5{\sim}3.9m$ at 40km/h. Vortical curve change rates need to be increased about $6{\sim}25%$ to provide minimum stopping sight distance according to design speed.

A Study on the Space Analysis of Rural House Plans and Types in Bonghwa Area Using the Space Syntax (봉화지역의 농촌주택 유형과 공간구문론에 의한 공간 분석)

  • Hwang, Yong-Woon
    • Korean Institute of Interior Design Journal
    • /
    • v.24 no.2
    • /
    • pp.142-150
    • /
    • 2015
  • The purpose of this study is to analysis the change of rural house type and house plans in Bonghwa province. According to definition of rural area, the scopes of the research of rural houses limited the Bonghwa rural area(1 eup, 9 myeon). The method of study is to compare and analyze about housing situation, structure of house, housing type and construction of house space etc. through the statistical data of Bongwha statistical yearbook, space syntax(convex analysis) and other various data etc. during these 10 years. As a results of the analysis 1) According to Change of family member the supply ratio of detached house is steadily decreasing and changing from a detached house to multi-household house in Bongwha areas. 2) Most of houses structure were using lightweight steel construction because of cost-cutting of construction and easy way to construct etc.. 3) The highest Integration space is living space in rural house plans 4) The highest segregation space is bathroom space of master bed room in rural house plans. Some of bed rooms are classed as segregation space regardless of Integration space 5) Traditional front yard's function is changing from the place with the various functions to the place with the specific functions.

Application of BIM Elements for Owner's Decision - Making Support (발주자 참여 확대를 위한 BIM 적용요소에 관한 연구)

  • Lee, Kyung-Ha;Park, Jae-Hyun;Cho, Sung;Cho, Yong;Yun, Seok-Heon;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.185-188
    • /
    • 2009
  • Recently clients requirements and social requirements are complex and large sized in construction projects. Futhermore, processes and steps are more complexed than before. Unsuitable reflection of clients brings mistaken opinions. A phase of middle change makes delay and change. It brings problems of waste expense and time. 80, first stage of planning and schematic design processes have to reflect of clients opinion actively. by increasing of constructions project competitiveness. Recently, BIM(Building Information Modeling is being researched frequently. Through visualization of information proceed step by step and it helps cognition of adapting information. 80, this paper finds and suggests solution of reflecting clients opinion and requirements and non professional clients and positively support of client participation watching based on BIM.

  • PDF

A study on the changes in the main space of Deoksugung Palace in the 1910s through the 『Deoksugung wonan』 (『덕수궁원안(德壽宮原案)』을 통한 1910년대 덕수궁 중심공간의 변화 고찰)

  • Su, Young-Ok;Kim, Wang-Jik
    • Journal of architectural history
    • /
    • v.31 no.5
    • /
    • pp.45-56
    • /
    • 2022
  • The purpose of this study is to understand the architectural changes that occurred in the main space of Deoksugung Palace based on the Deoksugung Wonan. In the 1910s, constructions in the Deokhongjeon area and Hamnyeongjeon area caused a change in the main space of Deoksugung Palace, which is similar to the change in the central space of Changdeokgung Palace. In both palaces, the space composition, architectural structure, construction equipment, and architectural design of the palace were changed due to the changed architectural organization and construction system.