• Title/Summary/Keyword: center pipe

Search Result 463, Processing Time 0.027 seconds

The Implementation of a Pipe-lined Grid Coverage and Grid Coverage Processor

  • Kim, Hong-Gab;Kim, Kyung-Ok
    • Proceedings of the KSRS Conference
    • /
    • 2002.10a
    • /
    • pp.70-73
    • /
    • 2002
  • This paper describes the way to embody the grid coverage and the grid coverage processor which can construct pipelines. The pipeline constructed by the developed grid coverages has internal pipelines that have different resolution and it provides the way of access to very large datasets efficiently. Several operations, such as filtering, image enhancement and band operation, are embedded in the developed grid coverage and grid coverage processor COM components. The practical usefulness of the developed grid coverage and grid coverage processor has been proven by applying them in developing an image processing software for very large images.

  • PDF

The Effects of Heat Input and Gas Flow Rate on Weld Integrity for Sleeve Repair Welding of In-Service Gas Pipelines

  • Kim, Y.P.;Kim, W.S.;Bang, I.W.;Oh, K.H.
    • International Journal of Korean Welding Society
    • /
    • v.2 no.2
    • /
    • pp.36-41
    • /
    • 2002
  • The experimental and numerical study has been conducted on the sleeve repair welding of API 5L X65 pipeline. SMAW and GTAW were applied to weld the sleeve. The macrostructure and hardness of repair welds have been examined. The finite element analysis of the multi-pass sleeve-fillet welding has been conducted to validate the experiment and investigate the effects of in-service welding conditions. The effect of gas flow rate on the hydrogen cracking was investigated. The effect of internal pressure on residual stresses and plastic strain was investigated. The allowable heat input was predicted considering the maximum temperature of inner surface of pipe and cooling rate at CGHAZ.

  • PDF

The Feasibility Study on a High-Temperature Application of the Magnetostrictive Transducer Employing a Thin Fe-Co Alloy Patch

  • Heo, Tae-Hoon;Park, Jae-Ha;Ahn, Bong-Young;Cho, Seung-Hyun
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.31 no.3
    • /
    • pp.278-286
    • /
    • 2011
  • The on-line monitoring for the wall thinning in secondary system has been considered one of main issues for the safety of nuclear power plants. To establish the on-line monitoring technique for the pipe wall thinning, the development of the ultrasonic transducer working in high-temperature is very important. In this investigation, the magnetostrictive transducer is concerned for high temperature condition up to $300^{\circ}C$. The magnetostrictive transducer has many advantages such as high working temperature, durability, cost-effectiveness, and shear waves, most of all. A thin Fe-Co alloy patch whose Curie temperature is over $900^{\circ}C$ was employed as a ferromagnetic material for magnetostriction. Wave transduction experiments in various temperature were carried out and the effect of bias magnets was considered together with the dry coupling performance of the transducer. From experimental results, consequently, it was found that the magnetostrictive transducer works stable even in high temperature up to $300^{\circ}C$ and can be a promising method for the on-line monitoring of the wall thinning in nuclear power plants.

Measurement of Particles Generated from PECVD Process using ISPM (ISPM을 이용한 PECVD 공정 내 발생입자 측정 연구)

  • Kim, Dongbin;Mun, Jihun;Kim, HyeongU;Kang, Byung Soo;Yun, JuYoung;Kang, SangWoo;Kim, Taesung
    • Particle and aerosol research
    • /
    • v.11 no.4
    • /
    • pp.93-98
    • /
    • 2015
  • Particles which generated from plasma enhanced chemical vapor deposition (PECVD) during thin film deposition process can affect to the process yield. By using light extinction method, ISPM can measure particles in the large-diameter pipe (${\leq}300mm$). In our research, in-situ particle monitor (ISPM) sensor was installed at the 300 mm diameter exhaust-line to count the particles in each size. In-house flange for mounting the transmitting and receiving parts of ISPM was carefully designed and installed at a certain point of exhaust line where no plasma light affect to the light extinction measurement. Measurement results of trend changes on particle count in each size can confirm that ISPM is suitable for real-time monitoring of vacuum process.

Elucidation of Corrosion and Failure of Stainless Steel Tubing buried in Soil for Potable Water (토양매설 스테인리스강 상수도 배관의 부식원인 규명)

  • Kim, Young Sik;Park, Soojin;Hwangbo, Deok;Shin, Mincheol
    • Corrosion Science and Technology
    • /
    • v.11 no.1
    • /
    • pp.20-28
    • /
    • 2012
  • Since buried pipes contact the soil directly, corrosion by the soil could be occurred. Recently, some stainless steel pipes after 8 years burial at G area were corroded and leaked. In order to elucidate highly corroded phenomena(its rate was about 0.175 mm/y) of these pipes, the investigation for corrosion environment, soil, stray current's effect, and chemical analysis on the pipes were performed. Most of investigated sites were close to traditional water-closet and showed high moisture and thus those areas could be highly corrosive. In the investigation by two kinds of soil evaluation methods, it was revealed that the soils at G areas were highly corrosive, and moreover the contents of sulfate reducing bacteria in the soils were high. Also, open circuit potentials of many pipes showed different values and its potentials were high positive. Therefore, it was considered that corrosion of buried pipes at G area could be affected by high corrosive soil's environment and stray current corrosion.

A Study on Effects of Temperature Difference between the Inside and Outside the Meter-Run on Natural Gas Flow Measurement Errors (천연가스 계량배관 내$\cdot$외의 온도차가 계량오차에 미치는 영향에 관한 연구)

  • Ha Youngcheol;Lee Chulgu;Chang Seungyong;Lee Kangjin
    • Journal of the Korean Institute of Gas
    • /
    • v.2 no.1
    • /
    • pp.83-89
    • /
    • 1998
  • Experiments had been conducted Qualitatively regarding flow measurement errors of orifice flowmeter due to temperature difference between the inside and outside the natural gas meter-run in case of no pipe insulations. The primary factors considered in this study are fluid velocity and surrounding temperature. In addition, a portion of thermal radiation due to the sun was involved as a factor. The results showed that the considerable errors were not detected even in conditions of low flow rates and large temperature difference between the inside and outside the meter-run.

  • PDF

A study on the comparison by the methods of estimating the relaxation load of SEM-pile (SEM파일의 이완하중 산정방법별 이완하중량 비교 연구)

  • Kim, Hyeong-Gyu;Park, Eun-Hyung;Cho, Kook-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.3
    • /
    • pp.543-560
    • /
    • 2018
  • With the increased development in downtown underground space facilities that vertically cross under a railway at a shallow depth, the demand for non-open cut method is increasing. However, most construction sites still adopt the pipe roof method, where medium and large diameter steel pipes are pressed in to form a roof, enabling excavation of the inside space. Among the many factors that influence the loosening region and loads that occur while pressing in steel pipes, the size of the pipe has the largest impact, and this factor may correspond to the magnitude of load applied to the underground structure inside the steel pipe roof. The super equilibrium method (SEM) has been developed to minimize ground disturbance and loosening load, and uses small diameter pipes of approximately 114 mm instead of conventional medium and large diameter pipes. This small diameter steel pipe is called an SEM pile. After SEM piles are pressed in and the grouting reinforcement is constructed, a crossing structure is pressed in by using a hydraulic jack without ground subsidence or heaving. The SEM pile, which plays the role of timbering, is a fore-poling pile of approximately 5 m length that prevents ground collapse and supports surface load during excavation of toe part. The loosening region should be adequately calculated to estimate the spacing and construction length of the piles and stiffness of members. In this paper, we conducted a comparative analysis of calculations of loosening load that occurs during the press-in of SEM pile to obtain an optimal design of SEM. We analyzed the influence of factors in main theoretical and empirical formulas applied for calculating loosening regions, and carried out FEM analysis to see an appropriate loosening load to the SEM pile. In order to estimate the soil loosening caused by actual SEM-pile indentation and excavation, a steel pipe indentation reduction model test was conducted. Soil subsidence and soil loosening were investigated quantitatively according to soil/steel pipe (H/D).

A Segment-based Minimum Cutset Method for Estimating the Reliability of Water Distribution Systems (상수관망의 신뢰도 산정을 위한 Segment 기반의 Minimum Cutset 방법)

  • Jun, Hwan-Don;Park, Jae-Il;Baek, Chun-Woo;Kim, Joong-Hoon
    • Journal of Korea Water Resources Association
    • /
    • v.40 no.9
    • /
    • pp.735-742
    • /
    • 2007
  • In this study, a methodology which is based on segments and minimum outsets to estimate the reliability of a real water distribution system efficiently and accurately is suggested. The current reliability assessment models based on minimum cutset consider a pipe as only area impacted by a pipe failure which incurs underestimation of pipe failure impact. In contrary, the suggested methodology adopts "segment" and "unintended isolation" with the hydraulic pressure failure area to define the actual service interruption area in a water distribution system due to a pipe failure, which is different from the Previous reliability estimating methodologies. In addition, a minimum cutset is defined as a single segment incurring abnormal operating conditions and the success mode approach is used to account for the probability of multiple failure combinations of minimum outsets. The model considers numbers and locations of on-off valves when the service interruption area is defined. Once the methodology is applied to a real water distribution system, it is possible to define actual service interruption areas and using the defined areas, the reliability of the water distribution system is estimated reliably, compared with the previous reliability assessment methodologies.

Identifying Risk Management Locations for Synthetic Natural Gas Plant Using Pipe Stress Analysis and Finite Element Analysis (배관응력해석 및 유한요소해석에 의한 SNG플랜트의 리스크 관리 위치 선정)

  • Erten, Deniz Taygun;Yu, Jong Min;Yoon, Kee Bong;Kim, Ji Yoon
    • Journal of Energy Engineering
    • /
    • v.26 no.2
    • /
    • pp.1-11
    • /
    • 2017
  • While they are becoming more viable, synthetic natural gas (SNG) plants, with their high temperatures and pressures, are still heavily dependent on advancements in the state-of-the-art technologies. However, most of the current work in the literature is focused on optimizing chemical processes and process variables, with little work being done on relevant mechanical damage and maintenance engineering. In this study, a combination of pipe system stress analysis and detailed local stress analysis was implemented to prioritize the inspection locations for main pipes of SNG plant in accordance to ASME B31.3. A pipe system stress analysis was conducted for pre-selecting critical locations by considering design condition and actual operating conditions such as heat-up and cool-down. Identified critical locations were further analyzed using a finite element method to locate specific high-stress points. Resultant stress values met ASME B31.3 code standards for the gasification reactor and lower transition piece (bend Y in Fig.1); however, it is recommended that the vertical displacement of bend Y be restricted more. The results presented here provide valuable information for future risk based maintenance inspection and further safe operation considerations.

Properties of Permeable Block using Artificial Permeable Pipe and Polymer Powder VAE to Improve Permeability (투수성을 개선시키기 위해 인공투수관 및 분말형 폴리머 VAE를 사용한 투수블록의 특성)

  • Yoo, Beong-Young;Lee, Won-Gyu;Pyeon, Su-Jeong;Kim, Dea-Yeon;Lee, Sang-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.5
    • /
    • pp.447-453
    • /
    • 2018
  • Since 1960, Korea the town center was developed intensively due to rapid industrial development. As a result of the development, the population was concentrated in urban areas and the green area was decreased. Due to the decrease of the green area, the circulation system of the rainwater was changed, hence the rainwater was not introduced into the groundwater., On the other hand, the water on the surface of the road was changed into the water for flowing to the river and evaporation. The changes in the water flow cause many problems, and the depletion of the groundwater does not create an environment in which microorganisms and plants can live. in Korea, permeable pavement construction is increased to solve these problems, but existing pavement blocks have many problems. The pores of the permeable block are clogged due to the accumulation of dust or whitening phenomenon, and the permeability is lost. In this study, the solution of the problems of existing permeable block were suggested by using polymer and artificial permeable pipe, and strength, permeability and service life are increased, The relationship between the substitution rate of the polymer and the mixing ratio of the artificial permeable pipe was analyzed.