• Title/Summary/Keyword: center pipe

Search Result 460, Processing Time 0.029 seconds

Behavior Analysis of Buried GFRP Pipes and Flanges (지중 매설 GFRP 관로 및 플랜지의 거동 분석)

  • Han, Taek Hee;Kim, Hyo-San;Jang, Young-Doo;Park, Yoon-Ho;Kang, Young-Jong
    • Journal of the Korean Society for Advanced Composite Structures
    • /
    • v.1 no.1
    • /
    • pp.27-33
    • /
    • 2010
  • Static analyses and buckling analyses were carried out for buried GFRP pipes by using finite element method. Vehicle loads, vertical and lateral soil pressures were considered as external loads, and supplying water pressure was considered as an internal load. Nine types of the factory-manufactured GFRP pipes were analyzed. Their maximum stresses and displacements were compared with the limit displacements and ultimate stress. Additionally, stress analysis on an enhanced flange, which was designed to reduce stress concentration, was performed. A cantilever analysis was carried out to know the maximum stress on the neck of the flange, which is the critical part. And a static analysis was carried for the buried flange. The test results showed that GFRP pipes were safe and stable against the external loads. And they showed that the enhanced flange decreased about 35% of the stress concentration.

  • PDF

A Study on the Dynamic Loss Coefficients of Non-standard Fittings in Ship Exhaust Gas Pipes

  • Park, Seongjong;Park, Yonghwan;Kim, Bongjae;Choi, Jaewoong
    • Journal of Ocean Engineering and Technology
    • /
    • v.33 no.5
    • /
    • pp.479-485
    • /
    • 2019
  • As exhaust gas systems of ships become more complicated, it is necessary to calculate an accurate pressure loss at their design stage. If the dynamic loss coefficients of non-standard fittings mainly used in exhaust gas pipe (EGP) are well-documented, it would be possible to calculate precise pressure loss more readily than using the conventional method that analyzes the entire system. In the case of a ship's EGP, the flow rates and temperatures of exhaust gas are determined by engine specifications, and the range of the flow rate and temperature is limited according to operating conditions. In addition, as it is possible to define non-standard fittings frequently used in an EGP, a database can be easily constructed and effective. This paper illustrates effective parameters and analysis cases of several types of non-standard fittings mounted in ship EGPs. The analysis procedure proposed in this paper is verified using existing research results on HVAC fittings. The numerical procedure, which is minimally affected by manpower and grid, is established such that it can be applied at the industry level.

A Study of Hydraulic Turbine Design for The Discharge Water Energy Harvesting (방출 수 에너지 하베스팅을 위한 수차 설계에 관한 연구)

  • Cheong, Han Seok;Kim, Chung Hyeok
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.34 no.1
    • /
    • pp.78-83
    • /
    • 2021
  • We modeled the helical turbine and three modified helical turbines for the structure of the hydraulic turbine for discharge water energy harvesting. A structure that can reduce the load applied to the blade by placing a center plate is our basic concept. The shape was reduced to 1/5, fixed to a size of 240 mm in height and 247 mm in diameter, and modeled by changing the width and the angle of the hydraulic turbine blade. The pipe inner diameter of the simulation pipeline equipment is 309.5 mm, and the simulation section was 4 m in the entire section. The flow velocity was measured for two cases, 1.82 m/s and 2.51 m/s, with the parameters being the amount of power generation, hydraulic turbine's torque, and hydraulic turbine's rotation speed. The measurement results confirmed that the flow velocity at the center, which has no pipe surface resistance, has a great influence on the amount of power generation; therefore, the friction area of the turbine blade should be increased in the center area. In addition, if the center plate is placed on the helical turbine, durability can be improved as it reduces the stress on the blade.

Minimizing the Measurement Error from Gas Compositions of Gas Vent in Sanitary Landfill (쓰레기 매립지 가스 포집관에서 가스조성에 따른 계측오차의 최소화)

  • 이해승;이문형
    • Journal of environmental and Sanitary engineering
    • /
    • v.17 no.1
    • /
    • pp.28-35
    • /
    • 2002
  • A methods of minimizing the measurement error brought from gas compositions was proposed by Hot wire Anemometer which don't have measurement resistance to calculate of gas vent in sanitary landfill. It was determined measurement error to compared velocity at the center of pipe to calculate using rotor meter and density gas compositions with velocity at the center of pipe to calculate using water head indicator which don't have measurement resistance. Considering the methods of minimizing gas velocity in sanitary landfill using hot wire anemometer and rotor meter, it was found to minimize within 10% as error of gas vent in sanitary landfill.

Effect of the Design Parameters of Geothermal Heat Exchanger Design Length (설계변수가 수직밀폐형 지중열교환기 설계길이에 미치는 영향)

  • Min, Kyong-Chon;Choi, Jae-Ho
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.7 no.2
    • /
    • pp.10-15
    • /
    • 2011
  • A ground loop heat exchanger for the ground source heat pump system is the core equipment determining the thermal performance and initial cost of the system The length and performance of the heat exchanger is dependent on the ground thermal conductivity, the operation hours, the ground loop diameter, the grout, the ground loop arrangement, the pipe placement and the design temperature. The result of this simulation shows that higher thermal conductivity of grouting materials leads to the decrease length of geothermal heat exchanger from 100.0 to 84.4%.

Thin-Plate-Type Embedded Ultrasonic Transducer Based on Magnetostriction for the Thickness Monitoring of the Secondary Piping System of a Nuclear Power Plant

  • Heo, Taehoon;Cho, Seung Hyun
    • Nuclear Engineering and Technology
    • /
    • v.48 no.6
    • /
    • pp.1404-1411
    • /
    • 2016
  • Pipe wall thinning in the secondary piping system of a nuclear power plant is currently a major problem that typically affects the safety and reliability of the nuclear power plant directly. Regular in-service inspections are carried out to manage the piping system only during the overhaul. Online thickness monitoring is necessary to avoid abrupt breakage due to wall thinning. To this end, a transducer that can withstand a high-temperature environment and should be installed under the insulation layer. We propose a thin plate type of embedded ultrasonic transducer based on magnetostriction. The transducer was designed and fabricated to measure the thickness of a pipe under a high-temperature condition. A number of experimental results confirmed the validity of the present transducer.

Validation of diesel engine gas flow one-dimensional numerical analysis using the method of characteristics (특성곡선법을 이용한 디젤엔진 가스유동 1차원 수치해석의 타당성 평가)

  • KIM, Kyong-Hyon;KONG, Kyeong-Ju
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.56 no.3
    • /
    • pp.230-237
    • /
    • 2020
  • In order to design a diesel engine system and predict its performance, it is necessary to analyze the gas flow of the intake and exhaust system. A gas flow analysis in three-dimensional (3D) format needs a high-resolution workstation and enormous time for analysis. Therefore, the method of characteristics (MOC) was used for a gas flow analysis with a fast calculation time and a low-resolution workstation. An experiment was conducted on a single cylinder diesel engine to measure pressure in cylinder, intake pipe and exhaust pipe. The one-dimensional (1D) gas flow was analyzed under the same conditions as the experiment. The engine speed, valve timing and compression ratio were the same conditions and the intake pressure was inputted as the experimental results. Bent pipe such as an exhaust port that cannot be realized in 1D was omitted. As results of validation, the cylinder pressure showed accuracy, but the exhaust pipe pressure exhibited inaccuracy. This is considered as an error caused by the failure to implement a bent pipe such as an exhaust port. When analyzed in 3D, calculation time required 61 hours more based on a model of this study. In the future, we intend to implement a bent pipe that cannot be realized in 1D using 3D and prepare a method to supplement reliability by using 1D-3D coupling.

Evaluation on in-situ Heat Exchange Efficiency of Energy Slab According to Pipe Materials and Configurations (파이프 재질 및 형태에 따른 에너지 슬래브의 현장 열교환 성능 평가)

  • Lee, Seokjae;Oh, Kwanggeun;Han, Shin-in;Park, Sangwoo;Choi, Hangseok
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.13 no.4
    • /
    • pp.1-7
    • /
    • 2017
  • The energy slab is a ground coupled heat exchanger equipped in building slab structures, which represents a layout similar to the horizontal ground heat exchanger (GHEX). The energy slab is installed as one component of the floor slab layers in order to utilize the underground structure as a hybrid energy structure. However, as the energy slab is horizontally arranged, its thermal performance is inevitably less than the conventional vertical GHEXs. Therefore, stainless steel (STS) pipes are alternatively considered as a heat exchanger instead of high density polyethylene (HDPE) pipes in order to enhance thermal performance of GHEXs. Moreover, not only a floor slab but also a wall slab can be utilized as a heat-exchangeable energy slab in order to maximize the use of underground space effectively. In this paper, four field-scale energy slabs were constructed in a test bed, which consist of the STS and HDPE pipe, and a series of thermal response tests (TRTs) was conducted to evaluate relative heat exchange efficiency per unit pipe length according to the pipe material and the configuration of energy slabs. The energy slab equipped with the STS pipe shows higher thermal performance than the energy slab with the HDPE pipe. In addition, thermal performance of the wall-type energy slab is almost equivalent to the floor-type energy slab.

Effect of Embankment-Pile on Preventing Lateral Movement of Buried Pipe (성토지지말뚝의 지하매설관 측방이동 방지효과)

  • Kim, Jae-Hong;Hong, Won-Pyo
    • Journal of the Korean Geotechnical Society
    • /
    • v.30 no.12
    • /
    • pp.63-72
    • /
    • 2014
  • To observe the behavior of lateral deformation of buried pipe and the preventing effect of embankment piles against the lateral deformation, a series of full-scale field tests were performed on a reclaimed coastal area. A buried pipe was installed in the west coast undergoing reclamation and embankment was performed by three steps. Then vertical settlement and lateral displacement were measured by the settlement plate and the inclinometer. Embankment pile system were applied to prevent the lateral displacement of buried pipe. Heave of the buried pipe slightly happens during embankment and following settlement. Finally the behavior steadily converged. The preventing effect of the embankment pile was approximately two times stronger than non-reinforcement. Both settlement and lateral displacement appear to be bigger at upper ground and smaller at lower ground.

Fundamental Study on the Development of a New Incremental Roll Forming Process for Structural Pipe Manufacturing (구조용 파이프 생산을 위한 새로운 점진적 롤 성형 공정 개발에 관한 기초 연구)

  • Son, Jong Youn;Yoon, Hee Seok;Park, Won Kyun;Shim, Do Sik
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.34 no.3
    • /
    • pp.217-224
    • /
    • 2017
  • Structural pipe frames are usually manufactured by complex processes, in which a straight pipe with an arbitrary cross-section is prepared via a roll-forming process and then fabricated into three-dimensional shapes by a secondary process. These conventional processes have low productivity. Recently, the inefficiency of the conventional processes has created the need to develop new forming technologies. In this study, a new incremental roll-forming process is proposed. The study is aimed at verifying the feasibility of the proposed process and investigating the fundamental process parameters using finite-element simulations. The result of the simulation demonstrates that the proposed process can be used effectively for cold fabrication of various shapes of structural pipes. In addition, the result of the investigation of parameters shows that the forming amount, number of roll sets, and distance between roll sets are significant factors to be considered in resolving dimensional errors of the product and improving its quality.