The ISO/TS16949 APQP goal of defect prevention and decrease of spread waste, is the customer satisfaction which leads a continuous improvement and profit creation. The quality expense where the most is caused by but with increase of production initial quality problem occurrence is increasing to is actuality. Like this confirmation amendment. with the problem which is forecast in the place development at the initial stage which it does completeness it does not confront not to be able, production phase to be imminent, the problem accumulates and it talks the development shedding of which occurs. In opposition, prediction confrontation. is forecast in development early stage to and it is a structure which does not occur a problem to production early stage. Like this development is a possibility of accomplishing competitive company from production phase. Which attains an goal of, chance cause it leads a APQP activity (common cause) with special cause prevention & detection the connection characteristic of the focus technique against a interaction is important. And the customer requirement satisfaction and must convert a APQP goal of attainment at the key characteristics action step. (1) The Prevention - with Design FMEA application prevention of the present design management/detection, (2) the Detection (prevention/detection) - with Process FMEA application prevention of the present process control/detection, (3) Special Cause - statistical process control (SPC) 4M cause spread removal, (4) Common Cause - statistical process control (SPC) the nothing zero defect which leads the continuous improvement back of spread with application it will be able to attain with application.
This study aims to estimate the relative importance of quality management items through the defect analysis in the landscape construction process. The RIQMI are decided by the defect coefficient and it's cause weight. The defect items in the landscape construction process were classified by 56 items based on the classification form of '96 landscape architectural construction standard and the cause pattern were categorized 4 types as design, material, construction, and environment factors. To analyze the defect coefficient and the aucse weight by defect, the researcher surveyed the questionnaires on the 103 engineers and the 31 experts on the landscape architectural construction. The result of this study are as follows. The relative importance by facilities pattern turn out to be much higher construction, material fator than design. environment factor in wood facilities, paving facilities, and steel facilities, the RIQMI is very high in timber crack, timber vending, faulty of timber against decay, welding faulty of steel facilities in material factor, and timber crack, faulty of timber against decay, finish faulty of steel facilities, welding faulty of steel facilities in construction factor.
The 9th International Conference on Construction Engineering and Project Management
/
pp.213-221
/
2022
Defects are the risk factors in the construction process of buildings. They cause damage, delaying the construction duration. They especially cause adverse effects on the top-down construction method. This study analyzed the degree of construction delay induced by each work type, focusing on defects in the top-down method. Then, we derived construction delay induction coefficient from different work types in order by using the severity of construction delay per defect and the occurrence probability of defect; this assessment model measures the impact of defects on construction delay for each work type. Furthermore, by comparing each work type based on the defect frequency and the construction delay induction coefficient, we found work types that need to be administered attentively. We identified that plastering work was easy to overlook, requiring caution in defect management. This study provides an efficient defect management system suitable for the buildings that are built using the top-down construction method.
The domestic CANDU nuclear power plants have been operated for a long time and various unforeseen spent fuel defects have been discovered. As the spent fuel defects are important factors in the safety of the nuclear power plant, a study on the analysis of the spent fuel defects to prevent their recurrence is necessary. However, in cases where the fuel rods inside the fuel assembly are defected, it is difficult to dismantle the fuel assembly owing to their welded structure and the facility conditions of the plant. Therefore, it is impossible to analyze the spent fuel defect because it is difficult to visually check the shape of the fuel defect. To resolve these problems, an analysis technology that can predict the number of defected fuel rods and defect size was developed. In this study, we developed a methodology for investigating the root cause of spent fuel defects using a database of the earlier fuel defects in the plants. It is anticipated that in the future this analysis technology will be applied when spent fuel defects occur.
WDM(Wavelength Division Multiplexing) is called a wavelength division multiplexing optical transmission method and is a next-generation optical transmission technology. Case company F has recently developed and sold PLC(Planar Lightwave Circuit), a key element necessary for WDM system production. Although Chinese processing companies are being used as a global outsourcing strategy to increase price competitiveness by lowering manufacturing unit prices, the average defect rate of products manufactured by Chinese processing companies is more than 50%, causing many problems. However, Chinese processing companies are trying to avoid responsibility, saying that the cause of the defect is the defective PLC Wafer provided by Company F. Therefore, in this study, the responsibility of the PLC defect is clearly identified through estimating the defect rate of PLC using the sampling inspection method, and the improvement plan for each cause of the PLC defect for PLC yeild improvement is proposed. The result of this research will greatly contribute to eliminating the controversy over providing the cause of defects between global outsourcing companies and the head office. In addition, it is expected to form a partnership with Company F and a Chinese processing company, which will serve as a cornerstone for successful global outsourcing. In the future, it is necessary to increase the reliability of the PLC yield calculation by extracting more precisely the number of defects.
Although it is widely accepted that a fire can occur due to electrical causes even when an engine stops, there is little introduction of detailed case analysis. This study analyzed a fire case caused by an electrical cause during engine stopping at parking lot in detail. Moreover, it was revealed that the fire was mainly caused by design defect.
본 논문에서는 반도체 산업 영상에서 반도체의 결함 원인 진단 기법을 제안한다. 제안 기법은 먼저 결함 영상에 대한 특징 데이터베이스를 구축한다. 다음으로 결함 영상과 입력 영상을 블록 단위로 영역 분할을 수행한 후 컬러 히스토그램을 계산하여 블록들 사이의 히스토그램 카이 제곱 거리를 이용한 블록 유사성을 측정한다. 다음으로 각 영상에서 탐색된 블록들에 대하여 클러스터링을 수행하여 영역을 연결된 객체 단위로 군집한다. 마지막으로 각 클러스터들의 특징을 추출하여 클러스터 간 유사성 측정으로 가장 유사성이 높은 결함 영상을 특징 DB에서 탐색하여 결함 원인 정보와 함께 제시한다. 검색 결과 유사도 상위 n개의 영상 중에서 입력 영상과 동일한 범주의 결함을 갖는 영상이 검색되는 비율을 구하여 제안 기법의 정확성을 검증하였다. n = 1, 2, 3에 대해서 결함 범주에 상관없이 검색 정확도는 모두 100%로 제안 기법은 실제 산업 응용이 가능한 정확한 검색 결과를 보여주었다.
Tile defects in apartment houses are caused by a combination of various factors. These factors cannot be specified, and it is difficult to determine the exact cause because a number of causes are intertwined. In addition, because the climate of Korea is different by season, the coefficient of thermal expansion between materials is different, which is a major cause of tile defects. Therefore, this study analyzed the difference between the construction location and the period of defect occurrence according to the types of tile defects caused by environmental differences between indoor and outdoor environments. Two-way ANOVA was used, indoor and outdoor spaces were selected, and defect types were selected accordingly to show the difference in the occurrence period of each defect.
Purpose: Facial tumor excision is a common cause of lower eyelid defect in old patients. Many methods have been introduced for the reconstruction of lower eyelid. However, conventional surgical method can cause various complications like scar, ectropion and unnatural color matching. Thus, we introduce a simple and aesthetically acceptable method for the reconstruction of lower eyelid defect. Methods: Three elderly patients with skin cancer in the unilateral lower eyelid were operated by the new method. Following a wide excision of skin cancer, subcilliary incision of lower blepharoplasty was carried out. Elevated skin flap of lower eyelid was redrapped for the correction of defect and the remnant skin from lateral portion of lower eyelid was used for full thickness skin graft (FTSG) to correct the remaining defect. Results: All grafts survived and color match of the graft was excellent without ectropion. Furthermore, wrinkles of the lower eyelid were improved after the blepharoplasty. Conclusion: Lower eyelid defect resulting from wide excision of malignant tumor in old patients could be reconstructed successfully by modifying the conventional lower eyelid blepharoplasty along with FTSG using the remnant skin.
The supply of apartments has continuously increased, and the housing supply rate has exceeded 100 percent and the demands and standards of tenants have also been raised as technology has developed. This has led to the conflict and caused social and economic losses. In this study, the case investigation and research methods of the prior research are analyzed as the basis for identifying the defects cases of causes and influences occurring in the apartment building. To analyze various studies, we divided the prior research into the defect management process and the study on the type of defects and countermeasures, and investigated the features and limitations. Future research will be conducted on apartment buildings within 10 years of completion among conglomerate's nationwide apartments to compensate for the limitations of prior research. In addition, AHP static method and relational chart will be used to identify the relationship between the type of defect and the cause and the importance of the influencing factors.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.