• Title/Summary/Keyword: calculation method

Search Result 7,840, Processing Time 0.038 seconds

Section Voltage Calculation while a Loop Operation by Tie-Switch Close in a Distribution Management System (배전운영 시스템에서 상시개방 연계 스위치 투입에 의한 루프 운전 중 구간전압 계산 방법)

  • Seo, Jeong-Soo;Lim, Il-Hyung;Park, Jong-Ho;Shin, Yonh-Hak;Choi, Myeon-Song
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.3
    • /
    • pp.397-403
    • /
    • 2016
  • Generally, an electrical distribution configuration is a radial system with one-way current in a distribution management system (DMS). All feeders in a DMS have tie-switches to make radial system. Sometimes, DMS should change a tie-switch for operation. In that case, the tie-switch has to be closed first; then a switch is opened as another tie-switch in order to prevent blackout for customers. At the moment when the tie-switch is closed, distribution system is operated in a loop state, not radial. Before the loop operation, DMS operator has to check any expected events for stable distribution system operation; and the most important event is a mis-operation of a protection relay. In addition, DMS operator should check voltage profile violation but a calculation method of section voltages had not been used. Thus, this paper proposes a calculation method of section voltages at a loop operation in a DMS. The proposed calculation algorithm is verified by Matlap Simulink.

Flow Analysis around a High-speed Planing Hull Model (고속 활주선 모형 주위의 유동해석)

  • Kim, Byoung-Nam;Kim, Wu-Joan;Yoo, Jae-Hoon
    • Journal of Ocean Engineering and Technology
    • /
    • v.23 no.4
    • /
    • pp.38-46
    • /
    • 2009
  • Two sets of numerical simulations were carried out for a planing hull model ship. In the first, the WAVIS 1.4 linear and nonlinear potential solver was utilized with the free support condition, in which the running posture was determined during calculation. The linear and nonlinear potential calculation results showed qualitative agreement in the trim and resistance coefficient with the MOERI towing tank test. However, the nonlinear potential calculation gave better results than the linear method. In the next simulation, Fluent 6.3.26 with a VOF model and the WAVIS 1.4 nonlinear potential solver were used with the given running posture from the measurement carried out in the MOERI towing tank. Fluent with the VOF method had substantially better agreement with model test results than the results from the WAVIS nonlinear potential calculation for the total resistance coefficient, and for the bow and stern wave patterns, in spite of the much greater computational costs. Both methods can be utilized in planing hull design when their limitations are perceived, and the running posture should be predicted correctly.

A Study on the Load Distribution Factor in the Perforated Square Plate with Elastic Support at Four Corners (彈性支持를 받는 四角多孔板의 荷重分布係數에 관한 연구)

  • 임정식;이영신
    • Transactions of the Korean Society of Mechanical Engineers
    • /
    • v.13 no.4
    • /
    • pp.563-571
    • /
    • 1989
  • The load distribution factor in the perforated square plate under concentrated load acting at arbitrary points through elastic media are calculated. For the calculation the perforated plate was converted into an orthotropic plate using the method suggested by J.B. Mahoney. In the process of the calculation the angle support at each corners was equivalent to a point support having equivalent stiffness. The deflections for the calculation of the load distribution factor were obtained using auxiliary plate extended in both directions of the plate and compared with the results from ANSYS calculations. After showing the validity of the current method, the calculation of the load distribution factor was performed. The result showed that the load distribution factor at the periphery of the plate is larger than that of in the central locations. This load distribution factor could be used for re-distribution of the applied load in more accurate analysis of the plate as well as it can be used in the analysis of the elastic media as the load factor.

Research on flexural bearing capacity of cold-formed thin-walled steel and reinforced concrete sandwich composite slabs

  • Qiao, Wentao;Huang, Zhiyuan;Yan, Xiaoshuo;Wang, Dong;Meng, Lijun
    • Steel and Composite Structures
    • /
    • v.45 no.2
    • /
    • pp.219-230
    • /
    • 2022
  • The aim of this paper is to study the mechanical behaviors of the cold-formed thin-walled steel and reinforced concrete sandwich composite slab (CTS&RC-SCS) under vertical loads and to develop the calculation methods of its flexural bearing capacity and section stiffness. Two CTS&RC-SCS specimens were designed and manufactured to carry out the static loading test, and meanwhile, the numerical simulation analyses based on finite element method were implemented. The comparison between experimental results and numerical analysis results shows that the CTS&RC-SCS has good flexural capacity and ductility, and the accuracy and rationality of the numerical simulation analysis are verified. Further, the variable parameter analysis results indicate that neither increasing the concrete strength grade nor increasing the thickness of C-sections can significantly improve the flexural capacity of CTS&RC-SCS. With the increase of the ratio of longitudinal bars and the thickness of the composite slab, the flexural capacity of CTS&RC-SCS will be significantly increased. On the basis of experimental research and numerical analysis above, the calculation formula of the flexural capacity of CTS&RC-SCS was deduced according to the plastic section design theory, and section stiffness calculation formula was proposed according to the theory of transformed section. In terms of the ultimate flexural capacity and mid-span deflection, the calculated values based on the formulas and the experimental values are in good agreement.

An enhanced analytical calculation model based on sectional calculation using a 3D contour map of aerodynamic damping for vortex induced vibrations of wind turbine towers

  • Dimitrios Livanos;Ika Kurniawati;Marc Seidel;Joris Daamen;Frits Wenneker;Francesca Lupi;Rudiger Hoffer
    • Wind and Structures
    • /
    • v.38 no.6
    • /
    • pp.445-459
    • /
    • 2024
  • To model the aeroelasticity in vortex-induced vibrations (VIV) of slender tubular towers, this paper presents an approach where the aerodynamic damping distribution along the height of the structure is calculated not only as a function of the normalized lateral oscillation but also considering the local incoming wind velocity ratio to the critical velocity (velocity ratio). The three-dimensionality of aerodynamic damping depending on the tower's displacement and the velocity ratio has been observed in recent studies. A contour map model of aerodynamic damping is generated based on the forced vibration tests. A sectional calculation procedure based on the spectral method is developed by defining the aerodynamic damping locally at each increment of height. The proposed contour map model of aerodynamic damping and the sectional calculation procedure are validated with full-scale measurement data sets of a rotorless wind turbine tower, where good agreement between the prediction and measured values is obtained. The prediction of cross-wind response of the wind turbine tower is performed over a range of wind speeds which allows the estimation of resulting fatigue damage. The proposed model gives more realistic prediction in comparison to the approach included in current standards.

Design of Attitude Heading Reference System using Gyroscope Free Inertial Measurement Unit (Gyroscope Free 관성 측정 장치를 이용한Attitude Heading Reference System 설계)

  • Jae Hoon Son;Sang Yoon Lee;Hyo Seok Kim;Dong-Hwan Hwang
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.13 no.3
    • /
    • pp.237-244
    • /
    • 2024
  • An Attitude and Heading Reference System (AHRS) provides the attitude of a vehicle with a constant velocity using an Inertial Measurement Unit (IMU) and a magnetometer. In this case, in order to avoid the disadvantage of a gyroscope, an AHRS using a Gyro-Free IMU (GF-IMU) that is composed of only accelerometers may be considered instead of the gyroscopes. In this paper, a design method of an AHRS using a GF-IMU is proposed. The proposed AHRS consists of roll and pitch calculation, yaw calculation, angular acceleration and angular velocity calculation, attitude calculation, and a Kalman filter. In particular, since the angular velocity cannot be measured from a gyroscope, the angular acceleration is obtained from the accelerometer output, and the angular velocity is calculated by integrating it. In order to show the usefulness of the proposed method, a performance evaluation was carried out. The performance evaluation results show that the attitude estimation performance of the proposed AHRS is similar to that of the conventional AHRS.

A Study of the Efficient Coordination of Logistic Distribution Centers for the China Project

  • Jin, Jun-Na;Zhang, Bao-Zhong
    • The Journal of Industrial Distribution & Business
    • /
    • v.9 no.8
    • /
    • pp.27-34
    • /
    • 2018
  • Purpose - This paper discussed and illustrated the most efficient method to calculate the distribution centers for a national project in China. Through demonstration of implementing the GIS, spatial analysis, and location calculation model, this paper mainly dealt with the construction distribution problem and inconvenient supply of materials problems. Research design, data, and methodology - In this paper, the research design structure based on three steps: implementing the Geographic Information System to locate the points coordination data, calculating the distribution centers of the project, and optimizing the most efficient and effective coordination. The data of the calculation is from an actual project. The methodology of this paper is summarizing the spatial analysis capabilities and digital graphic data calculation to locate logistics distribution centers, and since the illustration of the calculation is useful for locating the coordination, the result of this paper has certain reference values for the project construction. Results - This paper illustrates the steel and cement resource of every distribution point to confirm the most efficient distribution center location coordination. Conclusions - The integrated logistical management models are used to ensure the results for the purposes of our calculation. The result of the calculation is also a useful example for future Chinese national projects.

Electronic States Calculation of Fe4N by DV-Xα cluster calculation (DV-Xα 클러스터 계산법에 의한 Fe4N의 전자상태계산)

  • Song, Dong-Won;Lee, In-Seop;Bae, Dong-Su
    • Korean Journal of Materials Research
    • /
    • v.12 no.1
    • /
    • pp.44-47
    • /
    • 2002
  • DV(Discrete Variation)-X${\alpha}$ cluster calculation was employed to calculate the electronic states of ${\gamma}'- Fe_4N$ which was one of iron nitride phases synthesized from plasma ion nitriding to improve surface hardness and wear resistance. The result of calculated electron density of states for Fe was similar to the result of band calculation. The cluster used for calculation of electronic states of ${\gamma}'-Fe_4N$ was based on $Fe_{14}N$ cluster which comprises 15 atoms. Finally the electronic states of ${\gamma}'- Fe_4N$ such as net-charge, band order, energy level, electron wave-function, and contour map for electron density were derived by the calculation.

A Study on Calculation Method of Compensation for Indirect Damage of Fishery by Undertaking Public Project (공익사업시행(公益事業施行)으로 인한 어업(漁業)의 간접피해(間接被害) 보상액(補償額) 산출방법(算出方法)에 관(關)한 연구(硏究))

  • Kim Ki-Dae;Kim Byung-Ho
    • The Journal of Fisheries Business Administration
    • /
    • v.37 no.1 s.70
    • /
    • pp.25-44
    • /
    • 2006
  • Under the provision of Article 63 of the Enforcement Regulation of the Act on Acquisition and Compensation of Land and Others for Public Project that is recently enacted and implemented (hereinafter referred to as the 'Lend Compensation Act') the compensation is required to make 'When the Actual Damage Amount' is confirmed for the damage in fishery affairs that is outside of the public project area. The compensation for fishery business on the indirect damage area has been excluded from the advance compensation subject to conflict with the existing laws on fishery business compensation with the controversy in method, procedure, time and others to confirm the actual damage amount, and it lacks the standard of calculation for detailed compensation on partial damages outside of business implementation area, which caused the ceaseless conflicts and straggles between the project implementation party and the victimized fishermen regarding the calculation method of damages, standard, compensation period and others. In particular, from the numerous problems in damage compensation in fishery on the indirect damage area, the most recent problem emerged is the issue on application method of damage period in calculating the damage compensation amount that the struggle has been deepened with the differences between the project implementation party and the victimized fishermen without the stipulation on the compensation, that caused the difficulties in carrying out the public project and other serious social problems. In this study, the reasonable application method for the damage period and the calculation plan of the damage amount for calculating the damages on fishery industry outside of the public project implementation zone that is not fully specified under the Land Compensation Act, and the indirect damage area is not influenced for the notification of project recognition, and the compensation to undertake with the damage in the fishery industry in project implementation area to have the nature of damage compensation, the right to engage in fishery industry has the perpetual nature of rights, the fishery damage compensation system of Japan also recognizes the perpetual right on fishery industry to calculate the compensation amount, and the compensation for damage amount has been exercised for the period of actual damage occurrence period regardless of remaining effective period for most of fishery permit and license for fishery compensation outside of the project implementation area following the recent various public projects as well as the development process of theory on fishery loss compensation that the calculation of damage amount on the fishery industry outside of the project implementation zone would be prudent to compensate by calculating the applicable damages during the period of actual damages, and by doing so, the 'just compensation' guaranteed under the Constitution may be materialized. Therefore, the calculation of the damages from the implementation of the public project shall consider the actual period of damages and the degree of damage from the public project to calculate by the income capitalization method, however, considering the equitable consideration with the compensation following the cancellation, it shall not exceed the compensation following the termination of the applicable fishery businesses. Furthermore, the calculation method of partial damage amount on the fishery business following the project implementation shall apply, depending on the period of damage occurrence, by (1) the case of calculating the future damage amount at the present time, and (2) calculating the damage from the past to the present time as well as the damage to be incurred later, by selecting the calculation method for damages following the damage occurrence type.

  • PDF