• Title/Summary/Keyword: calculation method

Search Result 7,817, Processing Time 0.032 seconds

Electromagnetic Force Calculation using Magnetic Vector Potentials in 3-D Problems (자기벡터포텐셜을 이용한 3차원 전자력 계산)

  • Yang, Jae-Jin;Lee, Bok-Yong;Lee, Byung-Hoan;Lee, Ki-Sik
    • Proceedings of the KIEE Conference
    • /
    • 1994.07a
    • /
    • pp.153-155
    • /
    • 1994
  • Electric machines such as motors which have moving parts are desgined for producing mechanical force or torque. The accurate calculation of electromagnetic force and torque is important in the design these machines, Electromagnetic force calculation method using the results of Finite Element Method(FEM) has been presented variously in 2-D problems. Typically the Maxwell's Stress Tensor method and the method of virtual work are used. In the problems including current source, magnetic vector potentials(MVP) have mostly been used as an unknown variables for field analysis by numerical method; e, g. FEM. This paper, thus, introduces both methods using MVP in 3-D case. To verify the usefulness of presented methods, a solenoid model is chosen and analyzed by 3-D and axisymmetrical FEM. In each case, the calculated force are tabulated for several mesh schemes.

  • PDF

A Study on Validity of Applying Simplify modeling Method for Heating/Cooling Load Calculation (냉난방부하 계산의 단순화 모델링 기법 적용 타당성 검토에 관한 연구)

  • Kang, Yoon-Suk;Park, Jong-Il;Ihm, Pyeong-Chan
    • Proceedings of the SAREK Conference
    • /
    • 2008.06a
    • /
    • pp.1386-1391
    • /
    • 2008
  • As the time goes by, the energy use in buildings are increasing threateningly. So, it is important to have an accurate energy load calculation for buildings. The accurate energy simulation program carries numerous input data. So, our purpose of this study is to verify the application of simplify modeling method which eliminates coordinates of building components instead of using full coordinates by using DOE2. After comparing original modeling method with simplify modeling method, we applied PAF for daylighting control in the building to verify the application of daylighting control in simplify modeling method. The results shows that there are little difference between original modeling and simplify modeling. Also it showed that application of daylighting control has little difference between original modeling so it is feasible to adapt simplify modeling. These results reveals that the application of simplify modeling is possible to predict energy load and use of the building.

  • PDF

Calculation Method of Dedicated Transmission Line's Meteological Data to Forecast Renewable Energy (신재생에너지 예측을 위한 송전선로의 계량 데이터 계산 방법)

  • Ja-hyun, Baek;Hyeonjin, Kim;Soonho, Choi;Sangho, Park
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.8 no.2
    • /
    • pp.55-59
    • /
    • 2022
  • This paper introduce Renewable Energy forecasting technology, which is a part of renewable management system. Then, calculation method of dedicated transmission line's meteorological data to forecast renewable energy is suggested. As the case of dedicated transmission line, there is only power output data combined the number of renewable plants' output that acquired from circuit breakers. So it is need to calculate meteorological data for dedicated transmission line that matched combined power output data. this paper suggests two calculation method. First method is select the plant has the largest capacity, and use it's meteorological data as line meteorological data. Second method is average with weight that given according to plants' capacity. In case study, suggested methods are applied to real data. Then use calculated data to Renewable forecasting and analyze the forecasting results.

Wave Simulation Technique for Large-scale Optical Sensor Designs (거대 스케일 광학 센서 설계를 위한 파동 시뮬레이션(Wave Simulation) 기법 연구)

  • Yong-Hoon Lee;Tae Yoon Kwon;Muhan Choi
    • Journal of Sensor Science and Technology
    • /
    • v.32 no.1
    • /
    • pp.62-65
    • /
    • 2023
  • The wave mode calculation of a large-scale optical system in comparison to the working wavelength is practically impossible because the computational cost increases exponentially. In this paper, we propose a method that can obtain the optical mode in a large-scale optical system. The method carries out simulations by dividing the calculation area into blocks and moving along the light axis along which the light propagates. By applying this method to the calculation of resonant modes in a ring-type optical resonator, which is mainly used for ring laser optical gyro sensors, the efficiency of the proposed method was verified.

Characteristics of the Continuous Measurement and the Fuel Analysis for Emission Calculation of Carbon Dioxide in a Coal Fired Power Plant (석탄화력발전소 이산화탄소 배출량 산정을 위한 연료분석법과 연속측정법의 특성)

  • Choi, Hyun-Ho;Yoo, HoSeon
    • Plant Journal
    • /
    • v.13 no.1
    • /
    • pp.44-50
    • /
    • 2017
  • This study calculates carbon dioxide emissions using the fuel analysis and the continuous measurement from 500 MW-class coal-fired power plants and evaluates the characteristics of each method. The emissions calculation using fuel analysis was the lowest calculation among the emissions calculation methods. This is because of low net calorific value analysis. When using the low calorific coals, it is beneficial to utilize the fuel analysis. Also it showed the characteristics of the lower calculation emissions when used the as fired coals than the as received coals. However, the difference is negligible to less than 2%. As sample analysis personnel and equipment are limited in the present circumstances, it is also deemed appropriate to use the as received coals to fuel analysis. Continuous measurement showed somewhat higher emissions than the fuel analysis, and lower emissions than calculation method using domestic emission factors. Thus, if the calculated emission using fuel analysis increases with the coal type changes, it is beneficial to using modified flow rate measurement method.

  • PDF

An Analysis on Effectiveness of BIM-based Area Calculation Method for Improving Quality of Korean Apartment Housing (국내 공동주택의 품질향상을 위한 BIM기반 면적산정 방법의 실효성 연구)

  • Kim, Jun-Gyu;Ryu, Jung-Rim;Choo, Seung-Yeon
    • Journal of the Korean housing association
    • /
    • v.24 no.2
    • /
    • pp.45-52
    • /
    • 2013
  • The Purpose of this study is to improve construction quality with area calculation methods from BIM design technology. BIM has been supporting public-private-organizations and academic circles as a solution technology to manage and produce informations effectively from construction field including facility manage one. BIM standards are necessary but not sufficient for achieving perfect practical application in South Korea. In particular, development of architectural rule based area calculation methods is very urgent and important to improve construction quality. To solve those problems, methods and standards on area calculation are developed and its effectiveness of the proposed BIM-based methods is defined through the analysis between the existed area calculation method and process which are 2D based. This study will not only improve economic efficiency and accuracy of the construction quality but also settle the BIM environment in the domestic architecture.

Device Development of Mixture Concentration of Ethylene Glycol Antifreeze Coolant for Vehicles (자동차 에틸렌글리콜 부동액의 혼합 농도 측정 장치 개발)

  • Lee, Dae-Woong;Lee, Eun-Woung
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.28 no.8
    • /
    • pp.331-336
    • /
    • 2016
  • This study presents a coolant density calculation device and its corresponding method by using a mass flowmeter and the LabVIEW program. The method can be easily measured with a mixture of coolant and by calculating the percentage of ethylene-glycol without additional investment. The cooling water is very important in a vehicle to protect the engine, and the cooling performance is affected by the mixture concentration and coolant density. The coolant density calculation device measures the mixed concentration in the anti-freeze cooling mixture made from distilled water and ethylene-glycol in real time with the mass flowmeter that is commonly attached to the radiator or heater core. The calculation program for the mixture concentration percentage was developed using the LabVIEW software. The correlation between experimental results and the calculation was conducted for a range of temperature from 40 to $90^{\circ}C$ and by varying the mixture ratio of distilled water and ethylene-glycol. As a result, the anti-freeze coolant concentration in the volume percentage is able to monitor the coolant density in a timely basis by implementing a mixture concentration calculation program without the need for additional equipment investment. The results of the calculation for the mixture concentration level show a maximum 2.7% deviation compared to the experimental results.

A Study on the Calculation of Construction Project Cost of Healthcare Facility Business Plan (의료시설 사업계획서의 건축사업비 산정에 관한 연구)

  • Choi, Kwangseok
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.27 no.2
    • /
    • pp.7-14
    • /
    • 2021
  • Purpose: The purpose of this study is to provide an effective construction project cost estimation tool for preparing a business plan of healthcare facilities which can be practically used for development projects. Methods: In order to provide a tool for calculating construction project costs, this study analyzed the Building and Related Laws, the Building Technology Promotion Laws, the Ministry of Land, Infrastructure and Transport notifications and directives, the Ministry of Trade, Industry and Energy notifications, the detailed guidelines of the Ministry of Strategy and Finance, the Building Service Industry Promotion Acts, various certification standards, actual project budget calculation cases, etc. with advices from related experts. Results: 1) Construction cost is classified into construction costs, architectural design costs, supervision costs, incidental costs, and each sub-element. In particular, since there are many incidental cost items, essential items to be reviewed during planning are derived and costs are calculated according to appropriate consideration criteria. 2) Criteria for Payment calculation mainly applies the construction cost rate method or the actual cost fixed amount method in consideration of the characteristics and scope of work. Implications: There are many calculation factors that need to be applied to the construction project cost. Therefore, it is necessary to organize the calculation process more clearly.

A study on the method for calculation the floor impact sound (바닥충격음 예측법에 관한 연구)

  • 이성호;정갑철
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2003.05a
    • /
    • pp.184-190
    • /
    • 2003
  • In this study, several methods for measuring floor impact sound were introduced. Among them, the simple methods (impedance method and diffuse index method) which can be easily applied to site works were investigated. Moreover, the comparison between the calculation results using diffuse index method and the experimental results measured in real apartment structures was conducted. Consequently, the modified diffuse index method, which can be practically used for predicting the performance of to the floor impact sound of apartment structures and can meet the allowable tolerance of Grade I (${\pm}$5㏈), was proposed.

  • PDF

Hierarchical optimisation for large scale discrete-time systems using extended interaction prediction method (확장된 상호작용 예측방법을 이용한 대규모 이산시간 시스템의 계층적 최적제어)

  • 정희태;전기준
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1987.10b
    • /
    • pp.223-227
    • /
    • 1987
  • This paper presents the extended interaction prediction method for large scale discrete-time systems with interconnected state and control. Feedback gain is obtained from decentralized calculation without solving Riccati equation. Hence, Computer storage and calculation time is reduced.

  • PDF