• Title/Summary/Keyword: cable support bearing

Search Result 7, Processing Time 0.012 seconds

A Study on Pylon Cable Anchor System in Cable-Stayed Railway Bridge (철도용 사장교의 주탑 케이블 정착부에 관한 연구)

  • Han, Sung-Gwan;Gong, Byung-Seung
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.565-580
    • /
    • 2006
  • Set in constant increase and period current of lively technical development of railroad use and construction of cable stayed bridge railway bridge, one of bridge form of most suitable that think side police officer and the material enemy of bridge that use long rail, is increasing laying stress on the foreign countries. Main tower fixing department of this cable stayed bridge is consisted of main tower flange that support bearing plate, bay ring plate bearing plate, support end rib and diaphragm etc, as stress transmission mechanic that tensility of cable socket into normal force of main tower, and is used this time. These structural elements is very complex the structure and direction of load delivered from socket specially calbe particularly be different, and need FEM analysis that use Thick Shell element for suitable arrangement of mutual stress flowing grasping and absence that follow hereupon because all of the each support plate angle that suport this differ.

  • PDF

Dynamic performance of girder bridges with explosion-proof and aseismic system

  • Wang, Jingyu;Yuan, Wancheng;Wu, Xun;Wei, Kai
    • Structural Engineering and Mechanics
    • /
    • v.61 no.3
    • /
    • pp.419-426
    • /
    • 2017
  • Recently, the transportation of dangerous explosive goods is increasing, which makes vehicle blasting accidents a potential threat for the safety of bridge structures. In addition, blasting accidents happen more easily when earthquake occurs. Excessive dynamic response of bridges under extreme loads may cause local member damage, serviceability issues, or even failure of the whole structure. In this paper, a new explosion-proof and aseismic system is proposed including cable support damping bearing and steel-fiber reinforced concrete based on the existing researches. Then, considering one 40m-span simply supported concrete T-bridge as the prototype, through scale model test and numerical simulation, the dynamic response of the bridge under three conditions including only earthquake, only blast load and the combination of the two extreme loads is obtained and the applicability of this explosion-proof and aseismic system is explored. Results of the study show that this explosion-proof and aseismic system has good adaptability to seism and blast load at different level. The reducing vibration isolation efficiency of cable support damping bearing is pretty high. Increasing cables does not affect the good shock-absorption performance of the original bearing. The new system is good at shock absorption and displacement limitation. It works well in reducing the vertical dynamic response of beam body, and could limit the relative displacement between main girder and capping beam in different orientation so as to solve the problem of beam falling. The study also shows that the enhancement of steel fibers in concrete could significantly improve the blast resistance of main beam. Results of this paper can be used in the process of antiknock design, and provide strong theoretical basis for comprehensive protection and support of girder bridges.

Determination of Optimal Support for Cable-stayed Bridge Designs (사장교의 설계를 위한 최적 지지조건 결정)

  • An, Zu-Og;Yoon, Young-Man
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.3 no.4 s.11
    • /
    • pp.103-109
    • /
    • 2003
  • A numerical analysis of cable-stayed bridge is conducted to determine optimum longitudinal modulus of elasticity which represents the boundary condition between the tower and main girder. The effect of longitudinal modulus of elasticity is investigated for different loading condition (live load, wind load, seismic load), respectively. There are significant changes in the member forces as variations of longitudinal modulus of elasticity, such as, $k_h$=e=100tonf/m/bearing (live load), $k_h$=e=1000tonf/m/bearing (seismic load), However, the wind loads do not affect member forces. The optimum longitudinal modulus of elasticity is determined from considering minimum member forces in the numerical analysis results.

A Study on the Support Conditions of Cable-stayed Bridge System (사장교계의 지지조건에 대한 연구)

  • An, Zu-Og;Yoon, Young-Man
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.2 no.3 s.6
    • /
    • pp.119-125
    • /
    • 2002
  • The objective of this study is to evaluate elastic modulus of bridge-axis direction for optimum structure system in the cable-stayed bridge design. In numerical example of this study, a slight change in axis direction elastic modulus causes major modifications of the bridge characteristics when it is $1\times10^4$ tonf/m/bearing or less. Therefore, the elastic modulus was set at this lower limit of $1\times10^4$ tonf/m/bearing where the strength of the entire bridge system is still determined by girder strength and the entire system is insensitive to variations in elastic modulus. Besides, cable-stayed bridge with freely supported girders have slightly longer vibration periods in the horizontal direction for earthquake forces.

Active Control System for Mitigation of Cable Vibration in Cable-Stayed Bridges (사장교 케이블 진동저감을 위한 능동제어시스템)

  • Hwang, In-Ho;Jeong, Cheol-Oh;Lee, Jong-Han;Lee, Jong-Seh
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.20 no.5
    • /
    • pp.557-563
    • /
    • 2007
  • Rain-wind induced cable vibration can cause serious problems in cable-stayed bridge. External dampers attached to the cables have become widely accepted as an effective means for stay-cable vibration suppression. For very long stay-cables, however, such damper systems are rendered ineffective, as the dampers need be attached near the end of cables for aesthetic reasons. A recent study by the authors proposed that a movable anchorage system is replaced direct fixed support of the cable with a support through a bearing and damper. This paper extends the previous work by adding active control system to mitigate the cable vibration. The response of a cable with the proposed active control system is obtained and then compared to those of the cable with and without an external passive damper. The results show that the active control system can provide superior protection than the passive control system for a cable vibration.

Research on no coal pillar protection technology in a double lane with pre-set isolation wall

  • Liu, Hui;Li, Xuelong;Gao Xin;Long, Kun;Chen, Peng
    • Geomechanics and Engineering
    • /
    • v.27 no.6
    • /
    • pp.537-550
    • /
    • 2021
  • There are various technical problems need to be solved in the construction process of pre-setting an isolation wall into a double lane in the outburst prone mine. This study presents a methodology that pre-setting an isolation wall into a double lane without a coal pillar. This requires the excavation of two small section roadways to dig a wide section roadway, followed by construction of the separation wall. During this process the connecting lane is reserved. In order to ensure the stability of the separation wall, the required bearing capacity of the isolation wall is 4.66 MN/m and the deformation of the isolation wall is approximately 25 cm. To reduce the difficulty of implementing support the roadway is driven by 5 m/d. After the construction of the separation wall, the left side coal wall is brushed 1.5 m to make the width of the gas roadway reach 2.5 m and the roadway support utilizes anchor rod, ladder beam, anchor cable beam and net configuration. During construction, the concrete pump and removable self-propelled hydraulic wall mold are used to pump and pour the concrete of the isolation wall. In the process of mining, the stress distribution of coal body and isolation wall is detected and measured on site. The results demonstrate that the deformation of the surrounding rock of roadway and separation of roof in the roadway is small. The stress of the bolt and anchor cable is within equipment tolerance validating their selection. The roadway is well supported and the intended goal is achieved. The methodology can be used for reference for similar mine gas control.

Geotechnical Engineering Progress with the Incheon Bridge Project

  • Cho, Sung-Min
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.133-144
    • /
    • 2009
  • Incheon Bridge, 18.4 km long sea-crossing bridge, will be opened to the traffic in October 2009 and this will be the new landmark of the gearing up north-east Asia as well as the largest & longest bridge of Korea. Incheon Bridge is the integrated set of several special featured bridges including a magnificent cable-stayed girder bridge which has a main span of 800 m width to cross the navigation channel in and out of the Port of Incheon. Incheon Bridge is making an epoch of long-span bridge designs thanks to the fully application of the AASHTO LRFD (load & resistance factor design) to both the superstructures and the substructures. A state-of-the-art of the geotechnologies which were applied to the Incheon Bridge construction project is introduced. The most Large-diameter drilled shafts were penetrated into the bedrock to support the colossal superstructures. The bearing capacity and deformational characteristics of the foundations were verified through the world's largest static pile load test. 8 full-scale pilot piles were tested in both offshore site and onshore area prior to the commencement of constructions. Compressible load beyond 30,000 tonf pressed a single 3 m diameter foundation pile by means of bi-directional loading method including the Osterberg cell techniques. Detailed site investigation to characterize the subsurface properties had been carried out. Geotextile tubes, tied sheet pile walls, and trestles were utilized to overcome the very large tidal difference between ebb and flow at the foreshore site. 44 circular-cell type dolphins surround the piers near the navigation channel to protect the bridge against the collision with aberrant vessels. Each dolphin structure consists of the flat sheet piled wall and infilled aggregates to absorb the collision impact. Geo-centrifugal tests were performed to evaluate the behavior of the dolphin in the seabed and to verify the numerical model for the design. Rip-rap embankments on the seabed are expected to prevent the scouring of the foundation. Prefabricated vertical drains, sand compaction piles, deep cement mixings, horizontal natural-fiber drains, and other subsidiary methods were used to improve the soft ground for the site of abutments, toll plazas, and access roads. Light-weight backfill using EPS blocks helps to reduce the earth pressure behind the abutment on the soft ground. Some kinds of reinforced earth like as MSE using geosynthetics were utilized for the ring wall of the abutment. Soil steel bridges made of corrugated steel plates and engineered backfills were constructed for the open-cut tunnel and the culvert. Diverse experiences of advanced designs and constructions from the Incheon Bridge project have been propagated by relevant engineers and it is strongly expected that significant achievements in geotechnical engineering through this project will contribute to the national development of the longspan bridge technologies remarkably.

  • PDF