Towards More Accurate Space-Use Prediction: A Conceptual Framework of an Agent-Based Space-Use Prediction Simulation System

  • Cha, Seung Hyun;Kim, Tae Wan
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.349-352
    • /
    • 2015
  • Size of building has a direct relationship with building cost, energy use and space maintenance cost. Therefore, minimizing building size during a project development is of paramount importance against such wastes. However, incautious reduction of building size may result in crowded space, and therefore harms the functionality despite the fact that building is supposed to satisfactorily support users' activity. A well-balanced design solution is, therefore, needed at an optimum level that minimizes building size in tandem with providing sufficient space to maintain functionality. For such design, architects and engineers need to be informed accurate and reliable space-use information. We present in this paper a conceptual framework of an agent-based space-use prediction simulation system that provides individual level space-use information over time in a building in consideration of project specific user information and activity schedules, space preference, ad beavioural rules. The information will accordingly assist architects and engineers to optimize space of the building as appropriate.

  • PDF

초기 신체 구조 모델을 기반으로 한 신체 블록의 물량 정보 생성 및 블록 탑재 시물레이션 (Generation of the Production Material Information of a Building Block and the Simulation of the Block Erection Based on the Initial Hull Structural Model)

  • 노명일;이규열
    • 대한조선학회논문집
    • /
    • 제43권1호
    • /
    • pp.103-118
    • /
    • 2006
  • At the initial design stage, the generation process of the production material information of a building block and the simulation process of the block erection, which are required to perform the production planning and scheduling, have been manually performed using 2D drawings, based on the data of parent ships, and subjective intuition from past experience. To make these processes automatic, the accurate generation method of the production material information and the convenient simulation method of the block erection based on the initial hull structural model(3D CAD model), were developed in this study. Here, the initial hull' structural model was generated from the initial hull structural CAD system early developed by us. To evaluate the developed methods. these methods were applied to corresponding processes of a deadweight 300,OOOton VLCC. As a result. it was shown that the production material information of a building block can be accurately generated and the block erection can be conveniently simulated in the initial design stage.

MODEL-BASED LIFE CYCLE COST AND ASSESSMENT TOOL FOR SUSTAINABLE BUILDING DESIGN DECISION

  • Iris X. Han;W. Zhou;Llewellyn C.M. Tang
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.311-317
    • /
    • 2011
  • There is a growing concern in reducing greenhouse gas emissions all over the world. The U.K. has set 34% target reduction of emission before 2020 and 80% before 2050 compared to 1990 recently in Post Copenhagen Report on Climate Change. In practise, Life Cycle Cost (LCC) and Life Cycle Assessment (LCA) tools have been introduced to construction industry in order to achieve this such as. However, there is clear a disconnection between costs and environmental impacts over the life cycle of a built asset when using these two tools. Besides, the changes in Information and Communication Technologies (ICTs) lead to a change in the way information is represented, in particular, information is being fed more easily and distributed more quickly to different stakeholders by the use of tool such as the Building Information Modelling (BIM), with little consideration on incorporating LCC and LCA and their maximised usage within the BIM environment. The aim of this paper is to propose the development of a model-based LCC and LCA tool in order to provide sustainable building design decisions for clients, architects and quantity surveyors, by then an optimal investment decision can be made by studying the trade-off between costs and environmental impacts. An application framework is also proposed finally as the future work that shows how the proposed model can be incorporated into the BIM environment in practise.

  • PDF

도시지역 유인관측소 일조 관측환경 평가 모델 개발 (Development of Observational Environment Evaluation Model for Sunshine Duration at ASOSs Located in Urban Areas)

  • 김도용;김도형;김재진
    • 대기
    • /
    • 제23권3호
    • /
    • pp.275-282
    • /
    • 2013
  • In this study, the numerical model was developed to evaluate the observational environment of sunshine duration and, for evaluating the accuracy and utility of the model, it was verified against the observational data measured at Dae-gu Automated Synoptic Observing System (ASOS) located in an urban area. Three-dimensional topography and building configuration as the surface input data of the model were constructed using a Geographic Information System (GIS) data. First, the accuracy of the computing planetary positions suggested by Paul Schlyter was verified against the data provided by Korea Astronomy and Space Science Institute (KASI) and the results showed that the numerical model predicted the Sun's position (the solar azimuth and altitude angles) quite precisely. Then, this model was applied to reproduce the sunshine duration at the Dae-gu ASOS. The observed and calculated sunshine durations were similar to each other. However, the observed and calculated sunrise (sunset) times were delayed (curtailed), compared to those provided by KASI that considered just the ASOS's position information such as latitude, longitude, and elevation height but did not consider the building and topography information. Further investigation showed that this was caused by not only the topographic characteristic (higher in the east and lower in the west) but also the buildings located in the southeast near the sunrise and the southwest near the sunset. It was found that higher building resolution increased the accuracy of the model. It was concluded that, for the accurate evaluation of the sunshine duration, detailed building and topography information around the observing sites was required and the numerical model developed in this study was successful to predict and/or the sunshine duration of the ASOS located in an urban area.

BIM과 GIS 통합을 위한 건물 외곽 폴리곤 기반 Georeferencing (Georeferencing for BIM and GIS Integration Using Building Boundary Polygon)

  • 좌윤석;이현아;김민수;최정식
    • 한국BIM학회 논문집
    • /
    • 제13권3호
    • /
    • pp.30-38
    • /
    • 2023
  • Building Information Models(BIM) provides rich geometric and attribute information throughout the entire life cycle of a building and infrastructure object, while Geographic Information System(GIS) enables the detail analysis of urban issues based on the geo-spatial information in support of decision-making. The Integration of BIM and GIS data makes it possible to create a digital twin of the land in order to effectively manage smart cities. In the perspective of integrating BIM data into GIS systems, this study performs literature reviews on georeferencing techniques and identifies limitations in carrying out the georeferencing process using attribute information associated with absolute coordinates probided by Industry Foundation Classes(IFC) as a BIM standard. To address these limitations, an automated georeferencing process is proposed as a pilot study to position a IFC model with the Local Coordinate System(LCS) in GIS environments with the Reference Coordinate System(RCS). An evaluation of the proposed approach over a BIM model demonstrates that the proposed method is expected to be a great help for automatically georeferencing complex BIM models in a GIS environment, and thus provides benefits for efficient and reliable BIM and GIS integration in practice.

3차원 도시모델을 위한 건물추출에 관한 연구 (A Study on the Extraction of Building for three dimensional city model)

  • 차영수;김용일;어양담;이병길
    • 대한공간정보학회지
    • /
    • 제7권1호
    • /
    • pp.75-86
    • /
    • 1999
  • 3차원 도시 모델은 여러 가지 인공구조물, 자연 지물 요소로 구성되며, 이 중에서 대부분을 차지하고 있는 것은 건물이다. 따라서 건물을 얼마나 정확하고 신속하게 추출하여 기존의 데이터베이스를 갱신할 수 있느냐는 중요한 문제라 할 수 있다. 이러한 문제의 해결 방안으로 DTM으로부터 추출한 건물 정보로 DTM을 재구성한다면, 이를 하나의 3차원 도시 모델로 이용할 수 있다. 따라서 본 연구는 고해상도 DTM과 항공사진의 edge 정보에 수리형태학(mathematical morphology) 및 영상분할 기법 등을 적용하여 건물의 윤곽선 및 높이 정보를 추출하는 것을 목적으로 한다. 본 연구의 결과, 수리형태학의 opening 연산을 통해 건물의 추출이 가능하였으며, 항공사진에서 추출한 edge 정보를 이용하여 건물 추출의 정확도를 향상시킬 수 있었다.

  • PDF

제3자 신뢰기관의 전자무역 신뢰구축에 관한 연구 (A Study on the Trust Building of Trusted Third Parties in e-Trade)

  • 조원길;신승만
    • 통상정보연구
    • /
    • 제6권3호
    • /
    • pp.159-180
    • /
    • 2004
  • This paper focus on building online trust in electronic commerce between partner that have never traded with each other before, the so-called first trade situation. For this, this paper proposes the model to build trust for conduction first trade transaction in e-trade(so-ca1led Trust Matrix Model : TMM). The TMM is based on the idea that for business to business electronic trade a balance has to be found between anonymous procedural trust, i.e. procedural solutions for trust building, and personal trust based on positive past experiences within for first trade situation, because of the lack of experience in these situations. The procedural trust solutions are related in the notion of institution-based trust, because the trust in the procedural solutions depends on the trust one has in the institutions that issued or enforces the procedure. The TMM can be used as a tool to analyze and develope trust-building services to help organizations conduct first -trade electronic trade.

  • PDF

설계초기 동선 분석을 위한 BIM기반 정량 평가지표 및 평가체계에 관한 연구 (BIM-enabled Quantitative Indicators for Analyzing Building Circulation in Early Phase of Design)

  • 신재영;이진국
    • 한국실내디자인학회논문집
    • /
    • 제25권4호
    • /
    • pp.147-155
    • /
    • 2016
  • In order to ensure a certain level of the quality of design, standardized evaluation indicators are being used as an objective criterion. Even though the evaluation indicators are quantifiable, limitations such as inefficiency and inconsistency caused by manual task in the evaluation process still have been found. BIM (Building Information Modeling) technology that is commonly adopted in architectural design process provides an environment which enables us to figure out a building model to be interpreted quantitatively with the basis of the building information model. It supports quantitative, consistent, accurate and quick evaluations so as to improve quality of design even in the initial design phase. This paper aims to establish BIM-enabled quantitative indicators and an evaluation framework to analyze building circulation even in early phase of design. The indicators are composed of 4 types (relative distance, accessibility, simplicity, pedestrian friendliness) and 7 sub-types. The evaluation framework is the process to derive Parameterized Path Value (PPV) as weighting on each indicator. For demonstrating the scalability of the suggested evaluation indicators and the framework, the authors implemented an evaluation tool and a case study has been carried out by using an actual building remodel project.

신뢰도 평가에서 제한된 데이터를 이용한 와이블분포 모형화 기법 (A Weibull Model Building Technique for Reliability Assessment with Limited failure Data)

  • 김광원
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제55권3호
    • /
    • pp.109-115
    • /
    • 2006
  • The Weibull distribution is a good candidate for accurate probabilistic model with its rich shape-forming ability and relatively simple CDF(cumulative distribution function). If there are sufficient information to get convincible mean and variance for a probabilistic event, reliable parameters of the Weibull distribution can be determined uniquely. However, sufficient information is not given as usual. There needs more deliberate model building method for that case. This Paper presents an effective parameter estimation technique for Weibull distribution with limited failure data.

UAV를 이용한 돔형 원자력 격납건물 외관조사를 위한 3차원 모델기반 비행 좌표 생성 방법 (3-D Model-based UAV Path Generation for Visual Inspection of the Dome-type Nuclear Containment Building)

  • 김봉근
    • 한국BIM학회 논문집
    • /
    • 제6권1호
    • /
    • pp.1-8
    • /
    • 2016
  • This paper provides a method for generating flight path of Unmanned Aerial Vehicle (UAV) that is intended to be used in visual inspection of dome-type nuclear containment building. The method basically employs 3-D model to extract accurate location coordinates. Two basic route patterns that provide guide lines in defining moving locations were defined for each side wall and dome section of the containment. The route patterns support sequential capturing of images as well. In addition, several simple equations and an algorithm for calculation of the moving location on the route were developed on the basis of 3-D geometric characteristics of the containment building. A prototype computer program has been implemented to validate the proposed method, and a case study shows the method can visualize covering area in 3-D model as well.