• 제목/요약/키워드: building construction site

검색결과 1,301건 처리시간 0.026초

건설현장에서 안전재해예방을 위한 발주자의 안전관리 역할 (A Study of Client's Role for Safety Management at Construction Sites)

  • 임지영;한갑규;김선국
    • 한국건축시공학회지
    • /
    • 제8권5호
    • /
    • pp.75-83
    • /
    • 2008
  • Larger and more sophisticated building construction requires more input resources such as worker, materials and devices. Growing resource volume brings risks at a construction site. The industry makes an effort to protect probable incidents at the site by organizing a safety management team. conducting a safety instruction and etc, but losses especially in the construction are higher than other industries. Major reason is that the safety management program is conducted only at the step of construction work and a root cause is not eliminated. Conventionally a concerned party shifts the blame to other parties such as constructor and site workers who are direct participants in the construction site. However, the whole causes of incidents go to the all subject of the construction not only the constructor but the client, designer and others related in the construction, and especially the clients are heavily involved in general concerns of the project. Therefore, this study is defined the role of the clients in nations and domestic condition of construction safety management is investigated. And it is analyzed surveys to prevent incidents at construction sites, and suggested the role of the clients which is classified pre and post construction, and in the middle of construction, and also categorized planning and design & construction schedule especially for the pre-construction level.

백제(百濟) 혼축기단(混築基壇)의 연구(硏究) (A Study on Mixed Construction of Platform of Baikje)

  • 조원창
    • 건축역사연구
    • /
    • 제15권2호
    • /
    • pp.77-94
    • /
    • 2006
  • "Mixed construction of platform" means the platform which was constructed by mixing heterogeneous materials such as roof tiles or bricks with divided stone of trimmed stone. This kind of construction technique was not known or found from the building sites of Goguryo or Silla so far and therefore it used to be understood as a unique platform construction technique or the product of technology and creativeness of Baikje's craftsman. The mixed construction of platform of Baikje came to position itself as one of the patterns of platform mainly used over Sabi period and we found the pattern from the sites including Imryugak site in Gongju, temple for royal tomb in Gwanbuk-ri, Wangheungsa Temple site, building site in Keumseong Mountain, Ohapsa Temple site in Byryeong. From the fact that they used a variety of materials which they could easily get around them such as roof tiles or bricks in addition to stones for the construction of platforms, we can see the feasibility and decoration characteristics of their material supply at that time. On the other hand, this mixed construction of platform was not popular in Goguryo and Silla, the major reason for which is judged to be non-existence of platforms to construct using bricks or roof tiles which could be constructed together with platform using divided stones. This is supported by the results of excavation of Hwangryongsa Temple site, Bunhwangsa Temple site, Heungryunsa Temple site of Silla which gave us comparatively abundant excavation data, and Jeongreungsa Temple site, Cheongamsa Temple site, Toseongrisa Temple site and building site in Daeseong Mountain castle and Anhak Palace site of Goguryo. For further progressive study on the mixed construction of platform of Baikje in the future, we will have to review more on the social background and technical background with the linkage with archeology and architecture at that time which led to the creation of such platform.

  • PDF

OSC(Off-Site Construction)기반 PC공법의 시공 프로세스 도출 (Derivation of the Construction Process for Precast Concrete System based on Off-Site Construction)

  • 전영훈;배병윤;윤원건
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.289-290
    • /
    • 2021
  • The PC system has advantages in terms of project management, such as shortening the construction period and reducing costs. However, it is difficult to activate the technology due to insufficient application of the technology. Therefore, there is a need for a strategy to expand and activate the PC system. This study is a basic research for PC construction project management, and its purpose is to derive the entire construction process from factory production of PC components to on-site construction. In this study, the construction process of the PC system was derived through literature review, and the main matters for the construction process management of PC system were confirmed in the analysis process. In the future, the results of this study are expected to be used as basic data for research for PC project management, such as deriving construction classification and calculating construction periods.

  • PDF

MONITORING CONSTRUCTION PROCESSES: A SOLUTION USING WIRELESS TECHNOLOGY AND ONLINE COLLABORATIVE ENVIRONMENT

  • Sze-wing Leung;Stephen Mak;Bill L.P. Lee
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.50-60
    • /
    • 2007
  • The endeavor of this paper focuses on designing a monitoring system to provide a cost-effective solution on quality assurance for construction projects. The construction site monitoring system integrates a long-range wireless network, network cameras, and a web-based collaborative platform. The users of the system could obtain the most updated status of construction sites, such as behaviors of workers, project progress, and site events anywhere with Internet connectivity. It was carefully configured in order to maintain the reliability under the reactive conditions of the construction sites. This paper reports the architecture of the monitoring system and reviews the related technologies. The system has been implemented and tested on a construction site and promising results were obtained.

  • PDF

PDCA Cycle적용을 통한 건설현장 품질관리에 관한 사례연구 (A Case Study on the Quality Management of Construction Site through PDCA Cycle)

  • 백인희
    • 한국건축시공학회지
    • /
    • 제8권1호
    • /
    • pp.49-56
    • /
    • 2008
  • According to the recent trends which are the diversity of customer requests and the multi-function of buildings, A construction company's business has converted from the producer-oriented approach to the consumer-oriented approach. Therefore, each construction company is continuously trying to improve the quality level as a way of corresponding to customer needs in these changing situations. The quality is one of the main management targets which judge the success of a project along with the schedule, the cost and the safety. As construction companies execute the quality management which they aimed at, it should be completed within the optimum schedule and the limit of the budget. Accordingly, the importance of the construction site management to complete a project is continuously increasing. The construction site management is the systematic method to perform the project goals such as the quality improvement, the cost saving and the safety management, which organically operate one another, by procuring the manpower, the material and the machine in the right time. Specially, as the construction industry has based on the construction site, the establish of systematic construction site management, which can effectively correspond sudden changes of the construction business environment, is essential to maximize the construction productivity. On top of that, the necessity of the quality management method is increasing to accommodate customer needs more spontaneously in the construction site. These endeavors could guarantee their competitive power.

건설자재 현장품질관리 지침 개발을 위한 실태조사 (A Survey for a Development Construction Materials' Construction Site Quality Control Guide)

  • 고은주;고은정;석호중;이승혁
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 춘계 학술논문 발표대회
    • /
    • pp.1-5
    • /
    • 2008
  • The purpose of this study is to ensure an amicable material quality control in the construction site through investigating a process which can impact the construction material quality. For it, a worker interview and questionnaire survey was conducted through a direct field visit. The visited construction sites are composed of 79% construction site and 21% engineering site. As the respondents of questionnaire survey, the quality control workers were 72% of total respondents. Next, the construction worker, handymen, field representatives and others formed 7%. The interview with the quality control staff was conducted with the items including the construction site quality control guide, incoming inspection and material management. Through this survey, the problems of quality control by progress phase were derived. It could be known that the management and measures by each phase were urgently required. It also was indicated that a selection of low-priced material caused by low price bidding could badly impact the construction and safety. Also, in relation to the opinions such as the insufficient quality control and heavy work-load, the improvements are required. For the effective quality control in the construction site, the material quality control procedures suitable for the phase of construction progress must be presented in the present quality control. Also, the standards for it need to be established.

  • PDF

Citic Tower Construction Key Technology

  • Xu, Lishan
    • 국제초고층학회논문집
    • /
    • 제8권3호
    • /
    • pp.185-192
    • /
    • 2019
  • Citic Tower is the first over-500 m-tall super highrise building in the world, located in the high seismic intensity area with paek ground acceleration over 0.2g in 475 years. This project is unique in its complexity, large volume, and challenging site conditions (zero site for construction). The traditional techniques can hardly meet safty, quality and schedule requirements of the construction. This article introduces the key construction technologies that are innovatively developed and applied in Citic Tower project construction, including intelligent super-high-rise building integrated construction platform system, independently developed by the CCTEB; Jump-Lift Elevator, which is the first of the kind with service height over 500 meters; combined temporary-and-permanent fire protection systems. The BIM technology is also applied in this project. Through technical innovation, and utilization of technologies, construction speed and safety had been greatly improved.

투수콘크리트 현장품질관리 지침서 개발에 관한 연구 (A Study of Developing Guides for the Construction Site Quality Control of Porous Concrete)

  • 고은정;고은주;석호중;이승혁
    • 한국건축시공학회지
    • /
    • 제9권3호
    • /
    • pp.65-71
    • /
    • 2009
  • General criteria for the quality of porous concrete have not been established yet in Korea. And yet, pavement and construction have been performed. In this paper, guidelines on the construction site quality control of porous concrete were developed in order to establish criteria for resolving the issues and problems of porous concrete, to establish methods for improving poor performance, and to manage porous concrete more systematically. In addition, a guide for the construction site quality control of porous concrete, which was appropriate for reality, was developed by researching several quality control guides and maintenance at construction sites. The guide consists of a total of nine chapters such as Application Range, Overview, the Structure of Porous Concrete, the Design of Package Thickness, Package Materials for Porous Concrete, Construction Methods, Quality Assurance and Inspections, Construction Site Quality Control, and Maintenance. It describes quality control guidelines in all steps such as methods for transporting porous concrete from the factory to the construction site, cautions for construction work at construction sites, maintenance, and management. The Guide for the Construction Site Quality Control of Porous Concrete is expected to ensure the quality of porous concrete, to reduce national costs for quality assurance, and to help ensure the health and safety of Korean people.

폐섬유 자원재활용 기술을 통한 건설현장 친환경 시공관리 방안에 관한 연구 (Research on eco-friendly construction management plan for construction site through waste fiber resource recycling technology)

  • 김대건
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.45-46
    • /
    • 2022
  • Recently, it is necessary to establish an eco-friendly construction system through recycling of waste material management at construction sites. This is required to reflect the times that require a carbon reduction system in construction as part of domestic and overseas carbon dioxide reduction. Therefore, we intend to establish eco-friendly construction management as part of resource recycling and carbon reduction through recycling technology for waste fibers generated at construction sites.

  • PDF

Automated 3D Model Reconstruction of Disaster Site Using Aerial Imagery Acquired By Drones

  • Kim, Changyoon;Moon, Hyounseok;Lee, Woosik
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.671-672
    • /
    • 2015
  • Due to harsh conditions of disaster areas, understanding of current feature of collapsed buildings, terrain, and other infrastructures is critical issue for disaster managers. However, because of difficulties in acquiring the geographical information of the disaster site such as large disaster site and limited capability of rescue workers, comprehensive site investigation of current location of survivors buried under the remains of the building is not an easy task for disaster managers. To overcome these circumstances of disaster site, this study makes use of an unmanned aerial vehicle, commonly known as a drone to effectively acquire current image data from the large disaster areas. The framework of 3D model reconstruction of disaster site using aerial imagery acquired by drones was also presented. The proposed methodology is expected to assist rescue workers and disaster managers in achieving a rapid and accurate identification of survivors under the collapsed building.

  • PDF