AN APPROACH FOR ESTIMATING TOTAL COST OF OCCUPATIONAL SAFETY FOR BUILDING CONSTRUCTIONS

  • Gurkan Emre Gurcanli;Nesimi Teoman Korkutan;Ugur Mungen
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.168-175
    • /
    • 2011
  • Construction accidents are major problem in Turkish Construction industry and especially fatally rates are very high. Current legislative system on occupational safety in Turkey enforces employers to implement safety measures as well as safety management systems. However level of consciousness in the industry is unsatisfactory and safety are perceived as extra cost and unnecessary expenditure. Moreover, especially in small residential building constructions which have a big share in the industry and unfortunately safety measures to mitigate or abate construction risks do not exist. The study focuses on small residential building construction sites and in the scope of this study, thirty building projects are examined. For each building project, project cost including labour and material costs, service and consultancy costs for mechanical, electrical systems as well as architectural and structural services, costs for supervision and finally general expenditures for construction site facilities were calculated. On the other hand, occupational safety costs for personal protective equipment, collective protective measures, consultancy and training were determined. Work breakdown structures were established and for each work item firstly occupational risks were evaluated and furthermore according to risk scores safety measures to be implemented were defined and related costs were calculated. The study gave results for total safety cost on average, in terms of percentage of total project cost (3.73% of total project cost), safety cost per man-hour (0.40 USD) and safety cost in terms of unit construction area (11.60 USD per square meter). Since safety management is a part of whole project management process, study gives suggestions and techniques to calculate safety costs and implement safety measures as a part of project management service for professionals. Authors believe that suggested approach may easily developed by the usage of more data to establish a model for estimation not only for building construction sites but also for all construction projects.

  • PDF

Construction of Time - Cost Model for Building Projects in Vietnam

  • Long, Le-Hoai;Lee, Young-Dai;Cho, Jeong-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.130-138
    • /
    • 2009
  • Bromilow's time-cost (BTC) relationship was examined for building projects in Vietnam using actual construction time and total construction cost. Data set was collected from 77 historical building construction projects completed between 1999 and 2005 which were adjusted by consumer price index (CPI) to 2000 price. Time-cost equations were specified respected to two sectors, public and private, in Vietnamese construction industry and all cases. It is shown that a public funded building project has the longer construction duration than a similar budget private funded project. The resulting models are statistically significant. The adjusted R-square coefficients of all cases, public and private projects models are respectively 0.403, 0.436 and 0.377 mean that the BTC regression lines moderately fit the data set.

DEVELOPMENT OF BUILDING INFORMATION MODEL FOR RESOURCES OPTIMIZATION IN CONSTRUCTION PROJECT

  • Gopal M. Naik;Rokhsareh Badamahgan
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.634-639
    • /
    • 2013
  • The aim of the study is to develop the 3D visualization of Building Information Model and integrated 4D model for optimization of resources in the construction project. This study discuss the process of methodology and creation of 4D model of the project and simulate it to monitor the workflow at the site. Different stages of the construction process and activities are generated by using Revit and MS Project. MS project has been used for creation of the schedules and these are linked with the Revit for 3D modeling. The time used as the fourth dimension and 4D model created by using Navisworks Time liner software. Narges shopping center is presented as a case study to realize the actual uses and benefits of Building Information Model (BIM). Narges shopping mall is located in Tehran, Iran. As a part of Hekmat master plan, Narges shopping center is an 11 stores building with a total area of 30000 Sq.m. This shopping and entertainment center is comprised of 150 retails and two multi-use public halls with a capacity of 400 persons each and underground parking with total 400 parking space. The main purpose of architecture was to create an urban public center along with its revolving, spiral like form and an ever changing continuous façade by means of different colors, materials, which is in harmony with the other building of the master plan. The approximate cost of the project is $17 million and duration of the project schedule is 30 months. The developed Building Information Model enabled us to identify the potential collisions or clashes between various structural and architectural systems. 4D model has been used for limiting the interaction between subcontractors installing the different systems so rework could be avoided and productivity maximized. It is also observed that the utility of BIM for construction stimulation and clash detection is the best suitable method. Clash detection before the implementation of work is highly recommended to avoid rework.

  • PDF

A Study on The Possibility of BIM(Building Information Modeling) Application of Construction Management (건설사업관리의 BIM(Building Information Modeling) 적용 가능성에 관한 연구)

  • Shim, Jin-Kyu;Yi, Hye-In;Kim, Jae-Jun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.10 no.2
    • /
    • pp.49-60
    • /
    • 2010
  • The production process of construction industry is different from thing of the general manufacturing, likewise various participants make temporary teamwork for success of the project through sharing of information. But the each role of participants is individually changed to step in construction process stage and moreover it has complicated, entangled interests. The Construction Management was inducted for the effective management and operation of construction project. The Key of the Construction Management success depends on the cooperative relationship relation to major participants. The domestic construction system is difficult with many trial and errors for the frequent plan change. As the building are more bigger and complicated, Building Information Modeling is demanded design and maintenance. This evaluation was done by the trust on the system as well as Construction Management. And then it applies the BIM it analyzes the example of construcrion project.

Citic Tower Construction Key Technology

  • Xu, Lishan
    • International Journal of High-Rise Buildings
    • /
    • v.8 no.3
    • /
    • pp.185-192
    • /
    • 2019
  • Citic Tower is the first over-500 m-tall super highrise building in the world, located in the high seismic intensity area with paek ground acceleration over 0.2g in 475 years. This project is unique in its complexity, large volume, and challenging site conditions (zero site for construction). The traditional techniques can hardly meet safty, quality and schedule requirements of the construction. This article introduces the key construction technologies that are innovatively developed and applied in Citic Tower project construction, including intelligent super-high-rise building integrated construction platform system, independently developed by the CCTEB; Jump-Lift Elevator, which is the first of the kind with service height over 500 meters; combined temporary-and-permanent fire protection systems. The BIM technology is also applied in this project. Through technical innovation, and utilization of technologies, construction speed and safety had been greatly improved.

IMPACT OF CONSTRUCTION MATERIAL COST VARIATION ON THE ON THE FEASIBILITY OF BUILDING PROJECTS IN DEVELOPING COUNTRIES: A CASE STUDY IN VIETNAM RISK

  • Soo-Yong Kim;Luu Truong Van;Byeong-Gi Yoo;Luong Thanh Dung
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.96-105
    • /
    • 2007
  • This paper presents a study on the impact of variation of construction material prices on the feasibility of building projects in Vietnam. The paper makes use of Monte-Carlo simulation for financial risk analysis of net present Value (NPV) and internal rate of return (IRR). To well illustrate the influencing, a case study is presented. The research results show that there is a strong correlation between steel prices, gold prices, and $US exchange rate. Outputs of statistics also reveal that the concurrent variation of prices of cement, steel, sand, brick, formwork and stone has strongly negative impact on NPV and IRR of building projects. The results also indicate that the proportion of steel cost to total construction cost is 17.95% which is the cause of risks for the feasibility of building project in Vietnam. The paper stresses that feasibility study of building project must integrate the impact of construction materials prices in order to mitigate risks in developing countries as Vietnam.

  • PDF

A Case Study of BIM application to the Building Construction Project using Fast Track Method (Fast Track 건축공사의 BIM 적용 사례에 관한 연구)

  • Yoo, Pilsang;Han, Byeong-Min;Jeong, Mingu;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.210-211
    • /
    • 2013
  • The purpose of this research is to perform a case study for verifying problems of BIM application to the building construction project using Fast Track method. The object of case study is an actual construction project completed in 2013. As a result, some problems and solutions for those were extracted. The result of this study will contribute revitalization to the BIM application in the project using Fast Track method.

  • PDF

Development of Project Delivery System for Modular Building in Korea

  • Nam, Sung-hoon;Kim, Kyung-rai;Lee, Dong-gun;Heo, So-young
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.704-705
    • /
    • 2015
  • Recent research has been ongoing for modular buildings in the country, and interest increases. However, in accordance with legal restrictions in the country with regard to Project Delivery system of Modular Building, the activation of modular buildings industry is obstructed. In Korea, in accordance with national contract law, the construction contract is apply to the project delivery system of modular buildings, and in accordance with Framework Act on the Construction Industry, The project delivery system of modular buildings has to be a separate order. The definition of separate order in contract as defined in the law is that the electric work and Communication work and digestion facility work has to be separate each contract in order to be ensured professionalism. In accordance with law, the project delivery system of modular buildings is that the contract for construction is concluded with the Owner and the Construction Contractor and the contract for goods is concluded with the construction Contractor and modular manufacturer. Due to these project delivery system, the domestic factory production rate when making a modular unit is significantly reduced compared to the rate of factory production abroad and the domestic factory production rate is estimated to 10-20%. Due to the factory production rate is also low, despite what can be done at the factory the workload in construction field increases. According to the workload in field increases, the effect of the schedule reduction can be reduced. It resolved to form a consortium with a modular manufacturer and construction companies or the contract is concluded with Owner, modular manufacturer and construction companies in each. In this paper, we propose a specific project delivery system for modular building to solve the problem of the low factory production rate and the problem of schedule reduction. Through this paper, due to the variety of project delivery system on modular buildings is expected to contribute to the activation of modular buildings.

  • PDF

Development of Non-face-to-face Small and Medium-Sized Construction Project Management UI for Owners through Analyzes construction project management-related patents (특허 분석에 의한 발주자용 중.소규모 현장 비대면 건설사업관리 UI개발)

  • Kang, Sang-Chan;Jang, Myung-Houn
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.67-68
    • /
    • 2020
  • Real-time information on the construction project required by the owner make the project's transparency and overall productivity will be improved. This study analyzes domestic and foreign patents for construction project management to identify trends in technology development, construct cloud-based construction project management system solution UI, and proposes functions and services for each module. Trend research is conducted through patent search, and the analysis is divided into quantitative analysis which means quantitative statistics and qualitative analysis which means the technical contents of each patent. The construction project management system solution is based on smart devices at small and medium-sized sites, allowing both the owner and the construction personnel to share information.

  • PDF

BENCHMARKING THE PREPROJECT PLANNING PRACTICE FOR THE BUILDING CONSTRUCTION INDUSTRY IN TAIWAN

  • Yu-Ren Wang;Yi-Jao Chen;Chun-Yin Yu;Shin-Si Jang
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.324-329
    • /
    • 2011
  • Significant decisions are made by the project team during the early planning phase of capital facility project developments. The preproject planning phase begins after a decision is made to proceed with a project concept and continues until the detail design stage. Many of the industry practitioners and researchers have recognized the importance of preproject planning and that inadequate early planning is one of the key factors affecting project success. Nevertheless, the preproject planning practices vary significantly for the construction industry in Taiwan and the quality of preproject planning relies heavily on individual project team's experience. This research sets out to benchmark the preproject planning practice for the building construction industry in Taiwan. From late 2007 to early 2010, the researchers collected information from a total of 92 building construction projects using questionnaire survey. The analysis results show that the surveyed projects with better preproject planning have better cost and schedule performances on average. It is recommended that project team spend more efforts in the preproject planning stage to have a better chance of achieving project success.

  • PDF