• Title/Summary/Keyword: budget price

Search Result 145, Processing Time 0.027 seconds

Website Quality, E-satisfaction, and E-loyalty of Users Based on The Virtual Distribution Channel

  • PANDJAITAN, Dorothy R.H.;Mahrinasari, MS.;HADIANTO, Bram
    • Journal of Distribution Science
    • /
    • v.19 no.7
    • /
    • pp.113-121
    • /
    • 2021
  • Purpose: Technology induces the virtual distribution channel to exist, especially for booking a room online. This situation, indeed, provides an alternative for the customers to book based on their budget through digital platforms. One platform offering competitive prices is virtual hotel operators, such as Airbnb, OYO, RedDoorz, and Airy Rooms. Preferably, after using their platform, the user should be satisfied and loyal. Hence, this investigation aims to prove some associations. The first is between e-satisfaction and e-loyalty. The second is between website quality and e-satisfaction. The final is between website quality and e-loyalty. Research design, data, and methodology: This study is quantitatively designed with the sample of 350 users of the virtual hotel operator applications in Bandar Lampung: Airbnb, OYO, RedDoorz, and Airy, as the samples. Therefore, by denoting this sample size, the structural equation model based on covariance is utilized to examine the three hypotheses proposed. Also, to get the responses, this study uses a survey through a questionnaire. Result: This investigation demonstrates the positive relationship between e-satisfaction and e-loyalty. Additionally, website quality positively associates with e-satisfaction and e-loyalty. Conclusion: The virtual hotel operators must have the superiority on their website-based application to update the information based on the room availability and price, ensure online transaction safety, and facilitate its utilization to maintain long-term satisfaction and loyalty virtually.

A Survey of Consumer's Consumption Characteristics of Environmental-Friendly Agricultural Products (EFAP) -Focused on Consumers in Discount Stores- (친환경농산물 소비행태 조사 -대형할인마트 고객을 중심으로-)

  • Lee, Yu-Si;Hong, Mi-Hyun;Ryu, Kyung;Kim, Ae-Jung;Ha, Sang-Do
    • Journal of Food Hygiene and Safety
    • /
    • v.24 no.2
    • /
    • pp.111-123
    • /
    • 2009
  • We investigated the consumption inclinations of consumers for environmentally-friendly agricultural products (EFAP) for better production and distribution of EFAP. Consumer inclinations in large supermarkets from April 7th to 30th, 2008 were surveyed. Data were analyzed using the SPSSWIN 12.0 program. Results showed that 90.4% of consumers recognized EFAP and 76.4% of those who recognized the products had actually bought the products. Members of the "have purchased group" bought EFAP once a week because they believed these products were safe from hazards, such as pesticide. The amount spent on EFAP was less than 20% of the total food budget and the major consumed items were green vegetables and fruits. The sale location was mainly large supermarkets and agricultural cooperation outlets. Although many people were satisfied with EFAP from the viewpoint of nutritional and sensory qualities and safety compared with general agricultural products, they were notsatisfied with the price. Many consumers trusted that EFAP were safe and nutritional. Members of the "not purchased group" also trusted the nutritional and sensory qualities of EFAP and recognized the safety issue, but they were not satisfied with the price, compared with general agricultural products. Consequently, to succeed in the market, EFAP should maintain the confidence of the consumer while decreasing in price.

An Empirical Test for CVM Calibration Factor through Combining Revealed and Stated Preferences Data (현시선호와 진술선호 자료의 결합을 통한 조건부 가치측정법 소득조정계수의 추정)

  • Eom, Young Sook;Larson, Douglas M.
    • Environmental and Resource Economics Review
    • /
    • v.13 no.3
    • /
    • pp.337-366
    • /
    • 2004
  • Contingent Valuation Method (CVM), as non-market valuation approach, has been criticized on that respondents may not realistically reflect their budget constraints in answering willingness to pay (WTP) for hypothetical CV questions. This paper empirically estimates the income calibration factor associated with CV responses through combining travel cost method and contingent valuation method in a utility-theoretic framework. The joint model of recreation demand function and contingent WTP function was applied to an important case study on the Man Kyoung River system, whose water quality is at issue because of the Sae Alan Kum reclamation project. Relevant economic variables such as price, income and water quality had significant influence as anticipated by the economic theory. Equally important, the income calibration factor was not significantly different from one, suggesting that the systematic discrepancies of CV responses relative to the actual behavior was not detected at least in terms of budget exaggeration. Overall, this study supports the notion that carefully designed CVM studies can provide informative data on individuals' willingness to pay for environmental quality changes.

  • PDF

Valuation of highway O&M contract using real option (실물옵션을 활용한 고속 도로 유지관리 계약의 가치산정)

  • Park, Taeil;Shin, Eun-Young;Lee, Yoo-Sub
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.11
    • /
    • pp.5964-5970
    • /
    • 2013
  • The recent budget planning for highway infrastructure implied that the investments for Operation & Maintenance(O&M) became greater than that for new construction. This circumstance made many stakeholders pay attention to the O&M of road infrastructure and adopt other countries' policies and system for effective management. In other countries, most O&M for road infrastructure have been done by private entities using long-term contract and Korea is about to shift from one year contract to long-term contract. The most important parts for the expansion of the long-term O&M contract for road infrastructure are valuation of the O&M contract based on accurate prediction of O&M costs and instrument for proper risk sharing between contracting parties. Thus, this study provides a methodology to estimate a reasonable O&M contract price and a framework to share contract risk between contracting parties using real option. The analysis results showed that the contract price and ceiling and floor conditions for the 20 year-contract of 20 km-highway project were 45.7, 60 and 42.3 billion won, respectively.

Evaluation on the impact of Lowest Bid Contracts on Site Operations in times of Severe Economic Downturn (건설경기 침체기의 최저가 낙찰제 건설현장의 운영 실태분석과 개선 방안 도출)

  • Koo, Bon-Sang;Jang, Hyoun-Seung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.146-153
    • /
    • 2009
  • The year 2008 was a hard year for Korea's construction companies. The real estate downturn resulted in halting new construction and stopping existing work, and inflation of global oil prices caused price hikes in rebar and concrete materials. As a solution to reducing the budget, the newly appointed government announced plans to increase low cost bid contracts from 10 billion to 30 billion won. When such economical and political factors negatively impact the construction market, projects based on low cost contracts are the hardest hit. Many problems already inherent in low cost bid contracts become accentuated. Consequently, this provides an opportune time to actually study and analyze the issues in these projects. This paper introduces the findings made from investigating four projects struggling to make ends meet in the year 2008. Results show that flow of cash (i.e., liquidity), or lack thereof, was the root cause which in turn was hampered by failed mechanisms for design changes, material inflation. Attributing cash flow risk to the bottom of the production structure (i.e., small business subcontractors) was also a problem within the industry. Contractors need a better way to prepare against material price fluctuations, and owners need to assist in expediting payment during times of extreme downturn.

A Basic Study on Effective Adjustment Method for Construction Escalation/De-Escalation Price (건설공사 중 물가변동에 따른 효율적인 계약금액 조정에 관한 기초 연구)

  • Sung, Ju-yong;Kim, Dong-jin;Lee, Min-jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.3-11
    • /
    • 2019
  • The construction of a facility is an act whereby infrastructure such as roads and railways and other facilities such as housing and office spaces are constructed, and due to the characteristics of the relevant industry where such construction is carried out in a custom order method, it requires a long period of time mostly. While the construction is carried out over a long period of time, fluctuations in the price of raw materials required for the construction occur. Therefore, the cost of the construction also fluctuates inevitably. The fluctuation of the construction cost meshes closely with the profit of a constructor and the efficiency of government spending. Therefore, it is necessary to maintain the construction cost at a reasonable level by adjusting the construction cost rationally in order to secure the required construction quality and spend the budget efficiently. The buffer system for solving such problem is the contract amount adjustment system by fluctuations in prices (Escalation/De-Escalation). In this study, the method combining the escalation method based on the item adjustment method was suggested for an efficient contract amount adjustment method. In addition, it is proposed that there be an investigation and codification of matters not applied to government acts and regulations on contracts related to the adjustment of fluctuations in prices legally.

A Changes of Traditional Landscape Architecture Materials in Yangdong Village, Gyeongju - Building Roof Materials in the Village Since the 1970s - (정비 사업을 통해 본 경주 양동마을 전통조경 재료의 변화양상 - 1970년대 이후 마을 내 건축물 지붕 소재를 중심으로 -)

  • Kim, Dong-Hyun;Lee, Jong-Sung;Choi, Jong-Hee
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.36 no.4
    • /
    • pp.50-57
    • /
    • 2018
  • Based on research projects and maintenance plans that have been carried out to observe changes in the appearance of buildings in Yangdong Village, Gyeongju, this study analyzed the process of changes in roof materials since the 1970s and drew the following conclusions. First, as the proportion of houses used in the yanggi and yanggi in the 1970s appears similar to that of Wagawa, it is believed that the village landscape has changed due to the use of modern materials by modernization and urbanization. Second, the initial stage of readjustment was designated as a folk data protection zone in 1977 and important folk data designation in 1984. However, due to the lack of a budget for repair and indiscriminate repair, the effectiveness of the project did not seem to have been high. As a result, the trend of decreasing the initial price of the previous period and increasing the use of materials such as yanggi and slate were continuing. Third, in the 1990s, the Cultural Heritage Administration pushed for restoration to the traditional method through extensive renovation projects, making efforts to restore traditional materials, such as reduction of the yanggi and roof, removal of the Hamseok roof, and an increase in the price of grass. Fourth, in the 2000s and thereafter, various readjustment projects were completed in the previous period, with the ratio of Wagwa and Choga greatly increased and the number of houses on the roof of slate reduced by about half, and the level of maintenance of the village's retirement homes was readjusted after the World Heritage List in 2010.

A Study on the Analysis of Cost Adjustment Scenarios by Bidding Method through Analysis of the Total Project Cost Management Process (총사업비 관리 프로세스 분석을 통한 입·낙찰 방식별 공사비 조정 시나리오 분석 연구)

  • Kim, Kyeongbaek;Lee, Gayeoun;Kim, Sangbum
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.30-38
    • /
    • 2020
  • Inadequate cost management has widely been recognized as one of the most problematic areas in the Korean construction industry as many believes that public cost references are not reasonably reflecting the market conditions. 'Total Project Cost Management Guideline' developed by Ministry of Economy and Finance(MOEF) to govern public budget control has been identified as one of the main reasons for this problem. This study attempts to thoroughly review 'Total Project Cost Management Guideline' itself and quantitatively analyze the impact of it on project cost during procurement process. Different procurement methods are considered including turnkey & alternative, private contract, qualification examination, and lowest price bidding system in this quantitative impact analysis of 'Total Project Cost Management Guideline'. Analysis results shows that this governmental process works mainly as a constant cost-cutting tool throughout the procurement process.

Development of Construction Cost Model through the Analysis of Critical Work Items (코스트 중요항목 분석을 통한 공사비 예측모델 연구)

  • Lee Yoo-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.212-219
    • /
    • 2003
  • In construction project planning and control, a cost model performs a critical role such as cost determination on a contract stage and cost tracing. The model can maximize owner's profit and value within the project budget and optimize cost management works on overall construction implementation stages. A BoQ(Bill of Quantities) generally adopted in a unit price contract has been applied as an important tool for cost control and forecast. However a previous cost model based on the BoQ has shown limitations in that it requires too detailed information and heavy manpower on cost management and difficulty in keeping relationship with construction planning, scheduling and progress management. The each cost items and unit prices which constitute of construction works are individually very important management factors but the relative weight for each items and prices have a difference on the contents and conditions of each conditions of each construction works. In consideration of this structural mechanism of cost determination, this research is aimed at examining the critical factors affecting the construction cost determination and propose and verify a new cost forecasting model which is more simple and efficient and also keeps the accuracy of cost management.

Improved Initial Costs Expectation Model based on FPA for Internet Banking System (인터넷 뱅킹 시스템을 위한 개선된 FP 기반 초기 규모 예측 모델)

  • Yun, Gwang Yeul;Yoo, Hae Young
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.3 no.4
    • /
    • pp.139-148
    • /
    • 2014
  • With the development of IT, the financial sector has grown dramatically in Non face-to-face channel. However, because the initial costs calculation model which reflects the characteristics of the financial system does not exist, deteriorating reliability of budget establishment and low-price booking competition appeared. This negative situation leads to degradation of Internet Banking systems and customers who use these financial products have many troubles. Therefore, this paper improves the Initial Costs Expectation Model based on FPA & Expert Judgement Model. And it verified the effectiveness of this model through the regression analysis. As a result, we developed the Initial Costs Expectation Model for Internet Banking systems based on FPA, which is increased in accuracy than existing Cost Expectation Models.