Improved Initial Costs Expectation Model based on FPA for Internet Banking System

인터넷 뱅킹 시스템을 위한 개선된 FP 기반 초기 규모 예측 모델

  • 윤광열 (단국대학교 컴퓨터학과) ;
  • 유해영 (단국대학교 소프트웨어학과)
  • Received : 2013.12.02
  • Accepted : 2014.03.14
  • Published : 2014.04.30

Abstract

With the development of IT, the financial sector has grown dramatically in Non face-to-face channel. However, because the initial costs calculation model which reflects the characteristics of the financial system does not exist, deteriorating reliability of budget establishment and low-price booking competition appeared. This negative situation leads to degradation of Internet Banking systems and customers who use these financial products have many troubles. Therefore, this paper improves the Initial Costs Expectation Model based on FPA & Expert Judgement Model. And it verified the effectiveness of this model through the regression analysis. As a result, we developed the Initial Costs Expectation Model for Internet Banking systems based on FPA, which is increased in accuracy than existing Cost Expectation Models.

IT의 발전과 더불어 금융권의 비대면 채널 역시 폭발적으로 증가되어왔다. 하지만 금융 시스템의 특성을 명확하게 반영한 규모 산정에 대한 모델의 부재로 인하여 예산 수립의 신뢰성 저하, 그리고 이에 따른 저가 수주 경쟁 등이 빈번하게 발생하였다. 이러한 규모 예측의 신뢰성 저하는 인터넷 뱅킹 시스템의 품질 저하로 이어져 금융 상품을 이용하는 고객에게 피해가 전해지고 있다. 따라서 본 논문에서는 기존 금융권에서 사용하는 규모 산정 기법의 두 종류인 FP 기반 규모 산정과 전문가 유추 기반의 규모 산정을 토대로 규모 산정 기법을 개선하여 보다 간편하고, 실제 금융 비대면 채널 수행 규모에 근접한 규모 예측 기법을 구축하고 이의 효용성을 회귀분석을 통하여 검증하였다. 그 결과, 기존 규모 산정 기법보다 실제 수행 규모와 상관관계 및 정확도가 증가된 인터넷 뱅킹 시스템을 위한 개선된 FP 기반 초기 규모예측 모델과 도구를 구축하였다.

Keywords

References

  1. Y. S. Kim, D. H. Song, "Bank of the face-to-face channels(stores) awareness and change direction," NHERI Report Vol.187, 2012.
  2. J. S. Kang, "Trends and challenges of smart financial service in Banks-The case of KB Kookmin Bank," e-fincial serminar, 2012.
  3. Shinhan Financial Group, "Smart financial strategies in financial IT convergence environment," 2011.
  4. H. S. Chae, "Object oriented CBD Development Bible," Hanbit Media, 2003.
  5. M. Beadley, "Function Point Counting Practices Manual, Release 4.1," International Function Point Users Group(IFPUG), 1999.
  6. Korea Software Industry Association, "SW project cost estimation guide," Korea Software Industry Association, 2013.
  7. S. R. Jeong and S. J. Lee, "Estimating the Function Point for the Object Oriented Information Systems," The Journal of Information Systems Vol.16, No.1, 2007.
  8. Y. S. Ahn, "Improved Function Point Model for Software Size Estmation," The transactions of the Korea Information Processing Society Vol.4, No.4, 1997.
  9. Norman E. Fenton, Shari Lawrence Pfleeger, "Software Metrics: A Rigorous and Practical Approach 2nd," PWS Publishing, 1998.
  10. C. Jones, "Programming Productivity," McGraw-hill, 1986.
  11. T. Mukhopadhyay and S. Kekre, "Sofware Effort Models for Early Estimation of Process Control Applications," IEEE TSE, Vol.18, No.10, 1992.
  12. H. S. Kim, "An Improvement of Function Point Models for Software Cost Estimation," The Transactions of the Korea Information Processing Society Vol.6, No.9, 1999.
  13. ISBSG, "Worldwide Software Development-The Benchmark Release 6," Victoria, Australia International Software Benchmarking Standard Group, 2000.
  14. K. T. Kwon and C. S. Wu, "Derivation and Application of Software Size Estimation Model," The Korean Institute of Information Scientists and Engineers Vol.18, No.2, 1991.
  15. I. Y. Jung, D. J. Woo, J. H. Park and C. S. Jeong, "Improved Function Point Measurement Model for Software Size Estimation," Korean Society for Internet Information, 2009.
  16. W. C. Kim et. al., "Science of Statistics", Youngchi Publishers, 1994.