• Title/Summary/Keyword: bridges construction

Search Result 1,072, Processing Time 0.022 seconds

Application of Linear Schedule Chart by Linking Location Information of Construction Project with Horizontal Work Space (수평작업공간을 갖는 건설프로젝트의 위치정보 연동에 의한 선형공정표 적용방안)

  • Han, Seon Ju;Kim, Hyeon Seung;Park, Sang Mi;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.4
    • /
    • pp.601-610
    • /
    • 2018
  • Since the building construction works are repeated vertically in a limited space, there is not a great need for the location information of each activity in the schedule management. On the other hand, civil engineering works such as road and railway projects consist of a large number of earthworks, long bridges, and long tunnels. These types of work should be controlled in a horizontal space according to the linear axis of several tens of kilometers. In other words, since most of the activities are managed in the unit of distance from the start point to the end point, it is possible to improve the efficiency of the schedule management by linking the location information of the activity with the schedule data in the schedule management system. This study presents a methodology for creating a linear schedule chart specific to a project with horizontal work space and compares the convenience with the existing Gantt chart. In addition, the methodology of linking linear schedule chart to the 4D CAD system, which is a typical BIM technology in the construction phase, is presented to improve the usability of BIM. The practical applicability of the proposed methodology was verified statistically.

A Study on the Excavation of Tunnel Portal Zone Located at High Steep Slope (급경사 지형에 위치하고 있는 갱구부의 굴착 방안 연구)

  • Kim, Woo-Sung;Lee, Sang-Eun
    • Explosives and Blasting
    • /
    • v.26 no.2
    • /
    • pp.38-44
    • /
    • 2008
  • Recently, planning road construction in South Korea is focused on upgrading of the existing road by rerouting or restructuring. For this, roads under current construction in Korea go for more straight in its alignments and routing. Straight routing makes it all the more required to construct many mountain tunnels and bridges in Korea where mountains are so widely spread. Some portal of mountain tunnel is not rarely planed at high steep slope of mountain valley where it is not easy to secure working space for tunnel excavation. Reverse excavation is an alternative measure for excavation of tunnel portal at high steep slope. Construction in reverse excavation method has three important points requiring careful consideration: 1)planning of pilot tunnel in proper width, height, and length etc., 2)measure against the effect of one-side earth pressure to the direction of tunnel portal, 3)securing tunnel safety against shallow ground condition at portal zone. This paper intends to suggest applicable range of pilot tunnel for reverse excavation at the portal zone located at high steep slope, and shows result of study on the appropriateness of a reverse excavation by means of 3D numerical analysis. Result of 3D numerical analysis for reverse excavation at high steep slope shows that pilot tunneling will be applicable to start from the point $20{\sim}25m$ before the portal from inside the tunnel.

Longitudinal Behavior of Prestressed Steel-Box-Girder Bridge (프리스트레스를 도입한 강합성형 교량의 교축방향 거동)

  • Park, Nam Hoi;Kang, Young Jong;Lee, Man Seop;Go, Seok Bong
    • Journal of Korean Society of Steel Construction
    • /
    • v.15 no.3
    • /
    • pp.321-329
    • /
    • 2003
  • To effectively use the cross section of concrete decks, analytical and experimental studies on prestressed steel-box-girder bridges were performed in this study. The method of applying prestress was determined in the analytical study and the longitudinal behavior of the prestressed steel-box-girder bridge was considered in the experimental study. The object model for these studies was a two-span continuous bridge. The method of applying prestress determined herein was divided into two parts: one is that apply prestress to the concrete deck at its intermediate support, and the other is that apply prestress to the lower flange of the steel-box-girder bridge at its end support. The prototype bridge for the experiment was simulated based on the rule of similitude and was fabricated according to construction steps to apply prestress effectively. From the results of the experimental study, it has demonstrated that the prestressed steel-box-girder bridge provides better performance than the general steel-box-girder bridge in view of the increase of the design live load, the reduction of the tensile stress of the concrete deck at intermediate support, and the reduction of the displacement.

A Study on Development of BIM-based Asset Management Model for Maintenance of the Bridge (교량의 유지관리를 위한 BIM기반 자산관리 모델 개발에 관한 연구)

  • Kang, Jong-Min;Lee, Dong-Youl;Park, Jong-Bum;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.3-11
    • /
    • 2012
  • The most of domestic bridge has an used life under 30 years, Future maintenance budgets can be expected to increase. However, because of bridge maintenance budgets are limited, demand for asset management being performed to achieve required performance within available budget is increasing. To perform effective asset management of bridges should be made the best use of information to occur in all phase of construction project. Therefore, the development of system and DB is required to support asset management by effective information management. The objective of this study is the development of the BIM-based bridge asset management model. Through previous research survey, BIM capabilities and asset management components were established and mutual linkages were examined. Bridge asset management model was composed of alternate assessment model. In addition, BIM-based asset management model was performed case studies to verify feasibility and applicability. The proposed model can be applied to a current bridge maintenance procedures and supported to perform effective bridge maintenance tasks within a limited budget.

Development of the Approximate Cost Estimating Model for PSC Box Girder Bridge based on the Breakdown of Standard Work (대표공종 기반의 PSC Box 교량 상부공사 개략공사비 산정모델에 관한 연구)

  • Kim, Sang-Bum;Cho, Ji-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.791-800
    • /
    • 2013
  • Needs for developing a better way of cost estimating process for public construction projects have been widely recognized. Those needs are mainly from the early phases of the project through the construction life cycle due to the its importance to the control process. In contrast to the traditional estimating method based on unit-price references, this research utilized this following process. The first step is analyzing the real cost data from actual cost activities (2000~2010) about the statement of P.S.C(Prestressed Concrete) Box Girder Bridge. The collected data was broken into four categories based on technical construction methods such as I.L.M(Incremental Launching Method), M.S.S(Movable Scaffolding System), F.S.M(Full Staging Method), and F.C.M(Free Cantilever Method). The second, actual design documents including the actual cost estimating documents, drawings and specifications were carefully reviewed to cluster the cost itemized statement from four categories. It was also attempted to seek the proper breakdown of standard works that are responsible for more than 95 percentage in each categories in terms of its cost. The third, this research comes up the index for standard unit materials and unit price of standard work and develops the approximate estimating model applying for the specification(length and breadth of bridges) per square area that the user takes as well as suggests the practical application plan within the original time alloted.

Extraction of Road Structure Elements for Developing IFC(Industry Foundation Classes) Model for Road (도로분야 IFC 확장을 위한 도로시설의 구성요소 도출)

  • Moon, Hyoun-Seok;Choi, Won-Sik;Kang, Leen-Seok;Nah, Hei-Sook
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.2
    • /
    • pp.1195-1203
    • /
    • 2014
  • Since IFC (Industry Foundation Classes) 4 is based on the representation of 3D elements for an architecture project, and does not define standardized shapes for civil projects such as roads, bridges, and tunnels etc, it has limitations in securing interoperability for exchanging a shape information model for the civil projects. Besides, since road facilities have a linear reference, which is modeled along the center alignment, it is difficult the designers to create a standardized 3D road model. The aim of this study is to configure structure elements and their attribute for a road in the perspective of 3D design for developing a shape information model for the road. To solve these issues, this study analyzes the design documents, which consist of a road design handbook, guide, specifications and standards, and then extract shape elements and their attributes of road structures. Such shape elements are defined as an entity item and we review a hierarchical structure of a road shape defined by a virtual road model. The detailed elements and their attributes can be utilized as a 3D shape information model for constructing BIM (Building Information Modeling) environment for Infrastructures. Besides, it is expected that the suggested items will be utilized as a base data for extending to IFC for a road subdividing the detailed shapes, types and attributes for road projects.

On-Site Construction Method for U-Girder with Pre-tension and Verification of Analytical Performance of Anchoring Block (프리텐션 U형 거더 현장 제작 방법 및 정착 블록 해석적 성능 검증)

  • Park, Sangki;Kim, Jaehwan;Jung, Kyu-San;Seo, Dong-Woo;Park, Ki-Tae;Jang, Hyun-Ock
    • Journal of Korean Society of Disaster and Security
    • /
    • v.15 no.3
    • /
    • pp.67-77
    • /
    • 2022
  • In South Korea, U-type girder development was attempted as a means to increase the length of I-type girder, but due to the large self-weight according to the post-tension method, the application of rail bridges of 30m or less is typical. There are not many examples of application of pre-tension type girder. This study does not limit the post-tension method, but applies the pre-tension method to induce a reduction in self-weight and materials used due to the reduction of the cross-section. In addition, we intend to apply the on-site pre-tensioning method using the internal reaction arm of the U-type girder. The prestressed concrete U-type girder bridge is composed of a concrete deck slab and a composite section. Compared to the PSC I-type, which is an open cross-section because the cross section is closed, structural performance such as resistance and rigidity is improved, the safety of construction is increased during the manufacturing and erection stage, and the height ratio is reduced due to the reduction of its own weight. Therefore, it is possible to secure the aesthetic scenery and economical of the bridge. As a result, it is expected that efficient construction will be possible with high-quality factory-manufactured members and cast-in-place members. In this paper, the introduction of the pre-tension method on-site and the analytical performance verification of the anchoring block for tension are included.

Comparison of Measured Natural Frequencies of a Railway Bridge Specimen Between Different Excitation Methods (철도교량 시험체의 가진방법에 따른 고유진동수 측정치 변동에 대한 비교 분석)

  • Kim, Sung-Il;Lee, Jungwhee;Lee, Pil-Goo;Kim, Choong-Eon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6A
    • /
    • pp.535-542
    • /
    • 2010
  • Precise estimation of a structure's dynamic characteristics is indispensable for ensuring stable dynamic responses during lifetime especially for the structures which can experience resonance such as railway bridges. In this paper, the results of forced vibration tests of different excitation methods (vibration exciter and impact hammer) are compared to examine the differences and the cause of differences of extracted natural frequencies. Consequently a natural frequency modification method is suggested to eliminate effects of non-structural disturbance factors. Also, sequential forced vibration tests are performed before and after track construction according to the construction stage of a railway bridge, and the variation of natural frequencies are examined. Effect of added mass of vibration exciter and variation of support condition due to the level of excitation force are concluded as the major cause of natural frequency differences. Thus eliminating these effects can enhance the reliability of the extracted natural frequencies. Construction of track affects not only the mass of structure but also the stiffness of the structure. Also, the amount of increase in stiffness varies according to the level of structural deflection. Therefore, reasonable estimation of the level of structural response during operation is important for precise natural frequency calculation at design phase.

Development predictive equations for tensile properties of S235JR structural steels after fire

  • Ozer Zeybek;Veysel Polat;Yasin Onuralp Ozkilic
    • Steel and Composite Structures
    • /
    • v.53 no.2
    • /
    • pp.243-252
    • /
    • 2024
  • Conventional carbon mild steel is a type of steel known for its low carbon content and generally used in the construction industry. Its easily formable and weldable properties make this steel a widely preferred material for buildings, bridges and various construction projects. Other advantages of these steels are their low cost and good mechanical properties. However, high temperatures have an impact on the microstructure and mechanical characteristics of these materials. When high temperatures are present during a fire, steels show significant microstructural changes. Elevated temperatures often decrease the mechanical characteristics of steels. For this purpose, evaluating the post-fire behavior of conventional structural mild steel is an important issue in terms of safety. A combined experimental and parametric study was conducted to estimate fire damage to steel buildings, which is an important issue in the construction field. Tensile test coupons were cut from conventional structural S235JR mild steel sheets with thicknesses ranging from 6 mm to 12 mm. These samples were exposed to temperatures as high as 1200 ℃. After heat treatment, the specimens were allowed to naturally cool to ambient temperature using air cooling before being tested. A tensile test was performed on these coupons to evaluate their mechanical properties after fire, such as their elastic modulus, yield strength, and ultimate tensile strength. The mechanical behavior of conventional S235JR structural steel changed significantly when the heating temperature reached 600℃. The thickness of the steel had a negligible effect on yield strength loss, with the highest measured loss being 50% for 8 mm thickness at 1200℃. For thinner sections (6 mm), yield strength decreased by up to 40%, while thicker samples (12 mm) showed similar reductions. Ultimate tensile strength also showed minimal changes up to 600℃, but beyond this point, a notable decline occurred, with approximately 30% strength loss at 1200℃. The modulus of elasticity remained almost constant up to 800℃, but at 1200℃, the loss reached around 20% for thicker sections (10 mm and 12 mm) and up to 35% for thinner sections (6 mm and 8 mm). Overall, high temperatures led to significant deterioration in both yield and ultimate strength, with a general loss of load-bearing capacity above 600℃. A new equation was formulated from experimental results to predict changes in the mechanical properties of S235JR steels. This equation offers a precise evaluation of buildings made from conventional structural S235JR mild steel after fire exposure. Furthermore, the empirical equation is applicable to low-strength steels with yield strengths ranging from 235 MPa to 420 MPa.

A Modern Translation of Chinese Traditional Garden Space - Focusing on Qujiang Pool Heritage Park - (중국(中國) 전통원림(傳統園林) 공간(空間) 조영(造營) 원리의 현대적 탐구(探究) - 곡강지(曲江池) 유적공원(遺蹟公園)을 중심으로 -)

  • Wei, Tian-Tian;Kim, Jeong-Moon;Tian, Chao-Yang
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.37 no.3
    • /
    • pp.93-107
    • /
    • 2019
  • The purpose of this paper is to explore the application of Chinese traditional garden space construction principle studied by predecessors in modern park landscape, and to find more methods of traditional garden space construction inheritance and innovation through research. Tian Chaoyang's book "Fifteen Lectures on Chinese Classical Gardens and Modern Translation" mentions that Chinese traditional gardens are combining time and space, so he draws a brief pattern diagram containing the principle of the space construction. According to this principle of space construction, the researchers chose Qujiang Pool Heritage Park, which combines modern and traditional, then analyzed its spatial structure and and space elements. The results are as follows. The complex spatial structure of the park is composed of spatial boundary lines and spatial routes. The complex boundary space is composed of bridges, squares, plants, rows of buildings and other elements. The water space in the center of the park is designed in accordance with the traces of the historical water system, and its natural zigzag shoreline expands the water space. The central water space is divided into the big pool and the small pool, the Yanbo island and Bird island are created respectively. The building at the park boundary connects the park's interior and exterior. Most of the buildings in the park are located in the convex corner of the route or space. Through this research, it can be concluded that Qujiang park also applies the space construction principle combining time and space. And then, the garden elements of Qujiang park are recreating the history and culture of Qin, Han, Sui and Tang dynasties with modern methods, thus creating a park with Chinese regional characteristics. Since the Tang dynasty was the most prosperous period in Qujiang, the park was dominated by Tang culture. Through the research of this paper, we can see that the space construction principle of Qujiang Pool Heritage Park is the inheritance of the space construction principle of Chinese traditional garden. And the landscape element of Qujiang park is the landscape created by combining traditional history and culture, which is the innovative part of modern garden. Through this study, the creation of modern landscape with Chinese characteristics can provide some hints on the direction of inheritance and innovation.