• 제목/요약/키워드: bridge management

검색결과 751건 처리시간 0.024초

OPTIMISATION OF ASSET MANAGEMENT METHODOLOGY FOR A SMALL BRIDGE NETWORK

  • Jaeho Lee;Kamalarasa Sanmugarasa
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.597-602
    • /
    • 2011
  • A robust asset management methodology is essential for effective decision-making of maintenance, repair and rehabilitation of a bridge network. It can be achieved by a computer-based bridge management system (BMS). Successful BMS development requires a reliable bridge deterioration model, which is the most crucial component in a BMS, and an optimal management philosophy. The maintenance optimization methodology proposed in this paper is developed for a small bridge network with limited structural condition rating records. . The methodology is organized in three major components: (1) bridge health index (BHI); (2) maintenance and budget optimization; and (3) reliable Artificial Intelligence (AI) based bridge deterioration model. The outcomes of the paper will help to identify BMS implementation problems and to provide appropriate solutions for managing small bridge networks.

  • PDF

DEVELOPMENT OF BRIDGE MANAGEMENT SYSTEMS IN TAIWAN

  • Nie-Jia Yau;Hsien-Ke Liao
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.440-449
    • /
    • 2007
  • This paper describes the efforts in developing several versions of bridge management system (BMS) in Taiwan. There were several versions of stand-alone BMS developed in Taiwan prior to the Ji-Ji earthquake that occurred in year 1999. Since many bridges were seriously damaged by this earthquake, the Ministry of Transportation and Communication determined to develop a nationwide BMS to have a better by control on the status of bridge maintenance. Implemented in year 2000, the Taiwan Bridge Management system (T-BMS) is now the dominating and mandatory system used by all the government agencies that are responsible for bridge maintenance. Having more then 25,000 bridges in its inventory, T-BMS has thousands of logins per month to update data in the relevant database. The experiences and difficulties of using such a nationwide bridge management system are discussed. Finally, future plans for BMS development are also proposed in this paper.

  • PDF

교량유지관리시스템에 있어서 비파괴 시험의 효율적 활용 방안 (Use of Nondestructive Evaluation Methods in Bridge Management Systems)

  • 심형섭
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2000년도 가을 학술발표회 논문집(II)
    • /
    • pp.1291-1296
    • /
    • 2000
  • A basis for the direct use of data from nondestructive evaluation methods in bridge management systems is presented. Bridge management systems use integer-valued condition ratings to recognize conditions of bridge elements, to model progression of deterioration, and to determine repair needs. Data from nondestructive evaluation methods can inform management systems on the extent of damage, on the initiation of deterioration processes, and on the exposure of bridge elements to aggressive agents. In addition, data obtained through nondestructive evaluation methods allow the formation of models of specific deterioration process. The use of these data in bridge management systems requires redefinition of condition ratings together with the creation of procedures for automated interpretation of data. By these action, nondestructive evaluation methods are directly used to assign condition ratings, and condition ratings are made into terse form of NDE data that are compatible with present day bridge management systems. This paper reports work in progress to strategic use of nondestructive evaluation methods in bridge management system.

GIS를 이용한 교량재해관리시스템 개발 (Development of a Bridge Disaster Management System Using GIS)

  • 안기원;유환희;최윤수;신석효
    • 대한공간정보학회지
    • /
    • 제7권2호
    • /
    • pp.69-80
    • /
    • 1999
  • 본 연구에서는 지리정보시스템을 이용하여 교량 안전 관리를 위한 교량재해관리시스템을 개발하고자 한다. 진주시에 위치한 교량시설물들에 대한 기본도, 도로망도, 교량위치도 등과 같은 여러 가지 도형 레이어 그리고 32개 교량에 관련된 속성자료들을 포함하여 데이터베이스를 구축하였다. Visual Basic 5.0 Language를 사용하여 여러 가지 교량안전관련 분석기능을 갖는 PC용 교량재해관리시스템을 개발하였다. 본 연구에서 개발된 교량재해관리시스템은 신속하고 효율적인 데이터검색, 파일관리, 교량제원의 검색과 관리, 교량관련 도면보기, 교통량조사의 검색과 관리, 교량점검결과와 보수상태의 검색과 관리 그리고 교량 안전등급의 평가의 기능을 가지고 있다.

  • PDF

GSIS를 이용한 교량관리체계(橋梁管理體系) 구축(構築) (The Construction of Bridges Management System Using GSIS)

  • 양인태;김동문;신계종
    • 산업기술연구
    • /
    • 제18권
    • /
    • pp.43-50
    • /
    • 1998
  • According to complexity and high level of society, the rapid and accurate information for landuse, environment and traffic etc., is required, but the information management by a drawing and a map is confronted with a complicated and sudden change of facilities such as bridge; electricities, city gases and networks. This paper is aim to build a bridge management system of road with GSIS. It operated personal computer will bring easy computing management system of bridge on road. To build this system, presented bridge management system and domestic method for bridge management of road are investigated, and also apply to bridge management system using GSIS for site and character of bridges. And with that, position and character apply to bridge management system using GSIS.

  • PDF

RELIABILITY-BASED COMPONENT DETERIORATION MODEL FOR BRIDGE LIFE-CYCLE COST ANALYSIS

  • Rong-yau Huang;Wen-zheng Hsu
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.386-397
    • /
    • 2007
  • One major development in bridge life cycle cost analysis (LCCA) in recent years is to develop deterioration model for bridge components so that the times of repair/replacement throughout a component's life span can be properly determined. Taiwan also developed her own bridge LCCA model in 2003, integrating with the bridge inspection database in the local bridge management system (T-BMS). Under the framework of the local LCCA model, this study employs the reliability method in developing a deterioration model of bridge components. A component deteriorates through time in its reliability, which represents the probability of a component's condition index exceeds a user specified threshold. Model assumptions and rationale are described in the paper. The steps for applying the developed model are explained in detail. Results and findings are reported.

  • PDF

IMPROVING RELIABILITY OF BRIDGE DETERIORATION MODEL USING GENERATED MISSING CONDITION RATINGS

  • Jung Baeg Son;Jaeho Lee;Michael Blumenstein;Yew-Chaye Loo;Hong Guan;Kriengsak Panuwatwanich
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.700-706
    • /
    • 2009
  • Bridges are vital components of any road network which demand crucial and timely decision-making for Maintenance, Repair and Rehabilitation (MR&R) activities. Bridge Management Systems (BMSs) as a decision support system (DSS), have been developed since the early 1990's to assist in the management of a large bridge network. Historical condition ratings obtained from biennial bridge inspections are major resources for predicting future bridge deteriorations via BMSs. Available historical condition ratings in most bridge agencies, however, are very limited, and thus posing a major barrier for obtaining reliable future structural performances. To alleviate this problem, the verified Backward Prediction Model (BPM) technique has been developed to help generate missing historical condition ratings. This is achieved through establishing the correlation between known condition ratings and such non-bridge factors as climate and environmental conditions, traffic volumes and population growth. Such correlations can then be used to obtain the bridge condition ratings of the missing years. With the help of these generated datasets, the currently available bridge deterioration model can be utilized to more reliably forecast future bridge conditions. In this paper, the prediction accuracy based on 4 and 9 BPM-generated historical condition ratings as input data are compared, using deterministic and stochastic bridge deterioration models. The comparison outcomes indicate that the prediction error decreases as more historical condition ratings obtained. This implies that the BPM can be utilised to generate unavailable historical data, which is crucial for bridge deterioration models to achieve more accurate prediction results. Nevertheless, there are considerable limitations in the existing bridge deterioration models. Thus, further research is essential to improve the prediction accuracy of bridge deterioration models.

  • PDF

A NoSQL data management infrastructure for bridge monitoring

  • Jeong, Seongwoon;Zhang, Yilan;O'Connor, Sean;Lynch, Jerome P.;Sohn, Hoon;Law, Kincho H.
    • Smart Structures and Systems
    • /
    • 제17권4호
    • /
    • pp.669-690
    • /
    • 2016
  • Advances in sensor technologies have led to the instrumentation of sensor networks for bridge monitoring and management. For a dense sensor network, enormous amount of sensor data are collected. The data need to be managed, processed, and interpreted. Data management issues are of prime importance for a bridge management system. This paper describes a data management infrastructure for bridge monitoring applications. Specifically, NoSQL database systems such as MongoDB and Apache Cassandra are employed to handle time-series data as well the unstructured bridge information model data. Standard XML-based modeling languages such as OpenBrIM and SensorML are adopted to manage semantically meaningful data and to support interoperability. Data interoperability and integration among different components of a bridge monitoring system that includes on-site computers, a central server, local computing platforms, and mobile devices are illustrated. The data management framework is demonstrated using the data collected from the wireless sensor network installed on the Telegraph Road Bridge, Monroe, MI.

IMPLEMENTATION OF PRODUCT DATA MANAGEMENT SYSTEM FOR DESIGN OF BRIDGE STRUCTURES

  • Jin-Suk Kang;Seung-Ho Jung;Yoon-Bum Lee;Kwang-Myong Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1318-1323
    • /
    • 2009
  • In recent years, dramatic advances in information technology have motivated the construction industry to improve its productivity. Computer-based information technology includes Computer-Aided Design (CAD), Computer-Aided Engineering (CAE), Computer-Aided Manufacturing (CAM), Enterprise Resource Planning (ERP), Digital Mock-Up (DMU) and Product Data Management (PDM). Most construction industries are trying to apply these technologies for quality improvement, reduction of construction time and cost. PDM is very useful for managing data and process related to product design and manufacturing. PDM system has various functions such as drawing and engineering document management, product structure and structure modification management, part classification management, workflow management, and project management. In this paper, PDM system was applied to the design of steel-concrete composite girder bridge. To make a practical guidance for PDM implementation to bridge design, the procedure for its implementation was presented. Consequently, this paper could be useful to enhance the efficiency of bridge design.

  • PDF

철도교량 자동화 로봇 개발을 위한 기초 연구 (A Study for Developing of Rail Bridge Inspection Robot)

  • 구자경;황인호;이종세;이태식
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.188-193
    • /
    • 2008
  • According to introduce KTX in Korea, rail-road bridge section of KTX was increased approximately 50% of the total length. Bridge is required periodic inspection and check to prevent accident and hazard because various damage which have effects on traffic and replacement of damaged parts is difficult. Specifically, the train as large-scale transportation because accidents led to great damage, preventing these accidents are critical. Well-organized management and maintenance systems are required to prevent the accidents. In the case of roadway bridge, bridge inspection vehicle is used to deploy inspectors in roadway bridge. However, this method requires a lot of time and efforts, and inspectors are exposed to potential hazard. Also, surrounding environment like poor lighting system or electric wire could harm the inspector while repairing. Due to this reason, automatic repairing and inspecting system have been introduced to replace the old methods. Management system of the railroad bridge track for trains uses various advanced equipments, but whereas roadway bridge management system is lacking these efforts. As a result of that, this study looks over the existing management method. and review the method to apply the Bridge Inspection Robot in railroad bridge. Moreover, this study suggests future management technology using inspection robot.

  • PDF