• Title/Summary/Keyword: breakdown cost

Search Result 191, Processing Time 0.025 seconds

A Study about the cost present condition through research on the actual condition the apartment houses expenses levy system - Focusing on the Apartment Complexes Cases in Seoul - (공동주택 관리비부과방식 실태조사를 통한 비용현황관리에 관한 연구 - 서울시 아파트 단지 사례를 중심으로 -)

  • Park Kyung-Mo;Kim Chang-Duk;Park Tae-Keun;Chon Jae-Youl;Kim Ok-Kyue
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.236-241
    • /
    • 2004
  • Now it is a difficult situation to compare the apartment houses expenses with the others because of showing the difference according to several facts such as the location, the time of completion, the number of households, the heating system and the management system. So tenants who do not know related information cannot know whether the management expenses which they are put to expense is fair or not. Therefore firstly, this study presents cost breakdown system with investigating and analyzing the management expenses levy system of the apartment locating the city of Seoul. Secondly, this deduces problems and presents a remedy with analyzing cost management business procedure.

  • PDF

Demolition Cost Estimation of Small-size Rental Housing based on the Quantity per Unit Method (원가계산방식에 의한 다가구임대주택 해체공사비 예측)

  • Park, Seong-Sik;Lee, Sung-Bok;Shin, Sang-Hoon
    • Land and Housing Review
    • /
    • v.2 no.4
    • /
    • pp.415-427
    • /
    • 2011
  • This study is aiming at estimating the demolition cost of deterioration housing by the rational method in order to provide for the demolition and new build project of the rental multi-family housing of LH. We investigated the actual state of demolition construction and work process of small size housing, and analysed an actual condition of estimation for the demolition cost through an advice by the expert of construction cost estimate. Furthermore, the 'estimation standard for the predetermined amount', 'estimation standard for the disposal cost of construction wastes' and precedent studies in public construction work were considered. As one of results in this study, cost accounting system, breakdown system and construction cost for the demolition work based on the standard of estimate were proposed and the predetermined amount of demolition construction for the multi-family housing with 2 or 3 floors could be produced by them. Eventually, It is estimated that the demolition cost per a multi-family housing is about 18,331,000(won) and 104,000(won) per floorage($m^2$). To the details, the result indicated that the direct demolition cost needs about 14,339,000(won) per a multi-family housing and the consignment disposal cost of wastes needs 3,992,000(won) per one. The results of the study will be used as the fundamental data to estimate the project cost in the phase of budget establishment for demolition and new build project of the deteriorated rental multi-family housings, and also cost accounting system of demolition construction and breakdown system are expect to be used effectively at the ordering of public construction work.

MAINTENANCE SETUP AND SETUP PERFORMANCE IMPROVEMENT IN AN UNRELIABLE PRODUCTION SYSTEM

  • Lee, Chang-Hwan
    • Management Science and Financial Engineering
    • /
    • v.3 no.1
    • /
    • pp.57-74
    • /
    • 1997
  • An EOQ-like inventory model for a manufacturing process is studied. The system is assumed to deteriorate during the production process. The results are either the production of a number of defective items, or the breakdown of the production machine. The optimal production lot size is derived. The model is extended to the case in which the probabilities of making defective items and machine breakdowns are a function of both the quantity (amount) and quality (performance) of the consumed setup cost (including the preventive maintenance cost). We further assume that the setup performance can be improved by investing in the performance improvement program. Hence, the same or a better setup outcome can be achieved with a lower setup cost. We then investigate the optimal setup cost and investment policy simultaneously, thereby achieving a better process quality and setup cost reduction concurrently.

  • PDF

A Life Cycle Cost Analysis in Design and Manufacturing of Production System (생산시스템의 설계/제조에서의 생애비용(LCC)에 관한 연구)

  • 함효준
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.18 no.34
    • /
    • pp.173-183
    • /
    • 1995
  • Life cycle cost has been one of the key criteria in design or purchasing of systems, particularly in the flying weapon system. Unexpected cost increase or system breakdown during the system life can be reduced by controlling maintenance cost A system should be designed for maintainability in early stage of product life cycle. The design should be insensitive to its environmental, organizational, and human factors in the stage of customer's utilization. This paper presents LCC as a controllable variable and also suggests a new control model for LCC analysis. The estimation of maintenance cost based upon maintenance scenario, design of maintainability followed by minimizing maintainability loss function in the beginning stage of design, and increase of useful life of systems are among the factors to control LCC.

  • PDF

A Case Study on Assessing the Productivity of a BIM team in a Construction Company

  • Huang, Chien-Hsun;Hsieh, Shang-Hsien
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.259-262
    • /
    • 2015
  • Due to the labor-intensiveness, high investment cost, long execution time, frequent change orders, and many stakeholders in a BIM project, a BIM manager is bound to face a lot of risks to make decisions in cost managing process. Since the productivity of a BIM team will affect the execution cost, this study investigates a simple method of assessing the productivity of a BIM team using the working timesheet records of the team. In this research, the productivity of a BIM team is defined as the effective working floor area (in square meters) of BIM uses per labor-time (in man-months) spent by the team. After the applicability of this method is tested by regression analysis using data from 5 real BIM projects in the construction phase, it is found that the simple productivity definition adopted in the method, although easy-to-implement, does not produce a statistically constant productivity value. More research is therefore needed in the future to devise better indicator(s) for assessing the productivity of a BIM team.

  • PDF

A Study on Life Cycle Cost on Railway Locomotive Systems

  • Egamberdiev, Bunyod;Lee, Kookchan;Lee, Jongwoo;Burnashev, Shamil
    • International Journal of Railway
    • /
    • v.9 no.1
    • /
    • pp.10-14
    • /
    • 2016
  • Life cycle cost analysis is compulsively required for the system operation. System operation costs are consisted of acquisition, operation, maintenance and so on. In the beginning of the system planning, we need to take into account of various costs following the system operating. To implement LCC, we need to analyze system life cycle to identify all costs during system life. The costs can be divided into three parts. The first part is purchasing cost, the second for operating cost and the last for disposal cost. The second operating cost can be decomposed of operating cost included labor, energy consumption cost for system running, maintenance costs to keep systems healthy, delay cost caused from maintenance and hazard cost, and so on. In this paper, we carried out for railway locomotives which operate over more 30years and which cost about 10 million USD. We decompose the life cycle of the locomotives and break down the locomotives into subsystems to require maintenance or not, and subsystems to need energy or not. We showed how to decide optimal locomotives through cost identification and system breakdown.

Web-Based Cost Planning Program for High-Rise Office Building (고층 사무소건축의 공사비계획을 위한 웹 기반 개산견적 프로그램)

  • Kim Ki-Hong;Park Chan-Sik;Chang Sun-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.2 s.24
    • /
    • pp.69-79
    • /
    • 2005
  • The Purpose of cost Planning at the early Phase of construction Projects is to provide the clients with the appropriate cost information during the design decision-making process. Therefore, the cost planning process is expected not only to predict projects' cost accurately but also closely to coordinate with the design decision-making activities. This paper proposes a new cost planning method for the effective and efficient directions relating a design decision-making process. Strategies for this method are i ) to utilize elemental cost breakdown system, and ii ) to apply probabilistic distribution theories. Based on these strategic direction, this paper proposed a probabilistic cost planning model for high-rise office building projects. The suggested model provides appropriate cost information to meet clients limited budget and various project' requirements during the design decision-making process. This study is based on probabilistic distribution variables theories and the range estimating technique. This study also develops a web-based software program in order to apply the proposed cost planning model effectively in high-rise of office building construction practices.

Identification of Breakdown Structure for Infrastructure Maintenance, Repair, and Rehabilitation Technologies using Comparative Case Study (비교사례 연구를 통한 인프라 유지관리 기술 분류체계 도출)

  • Kim, Du Yon;Cha, Yongwoon;Park, Wonyoung;Park, Taeil
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.10
    • /
    • pp.248-258
    • /
    • 2020
  • This study proposed a breakdown structure for maintenance and management technologies under the concept of comprehensive asset management at the life cycle level of infrastructure based on benchmarking with other developed countries. For this purpose, a comparative case study was performed to review and analyze the existing definitions and hierarchies for infrastructure maintenance, repair, and rehabilitation (MR&R) systems under major industrialized countries and South Korea. In accordance with the ratio of maintenance costs to GDP, the U.S., U.K, and Japan were selected to review their systems. The classifications and definitions of MR&R technologies under the laws were analyzed. The result showed that most developed countries differentiate maintenance and repair from improvement and constitute a system centered on preventive maintenance activities. On the other hand, Korea's system for facility management is not definitely classified and still focused on reactive structures, which need to be improved. In this study, as proposed, a breakdown structure established the concept of Maintenance and Management, Maintenance & Repair, and Performance Improvement. Consequently, this study could be used as the basis for the implementation of preventive MR&R activities and reasonable resource allocations from an asset management point of view.

Long Term Evaluation of UF Membrane process using River-bed Water (복류수를 이용한 한외여과공정의 장기운전 평가)

  • Kim, Chung H.;Lim, Jae L.;Kang, Suk H.;Kim, Su H.
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.22 no.4
    • /
    • pp.429-436
    • /
    • 2008
  • Membrane system has been increasingly considered as a safe and cost-effective water treatment process especially in case of small scale water works. This research is a basis of membrane application in water works through a long period test with obtaining operation skills and evaluation of water quality and cost competitiveness. For the research, the UF membrane system was installed in small water treatment plant that uses river-bed water as raw water. The system was consisted of 2 stage membrane and operated in constant flow mode (Flux: 1.5, 1.0, 0.9, 0.6). In each different flux condition, TMP trends were showed better results at lower flux condition. And through the high flux condition test, it is certified that membrane system could deal with breakdown of one stage. Water quality of permeate was satisfied the water quality standards especially turbidity. To know what mainly causes fouling on membrane, the test by membrane with several cleaning agents and EDX analysis have done in lab. Through the tests, ferrous concentration in raw water, backwashing water and membrane surface etc. was high and it causes fouling inside and outside of membrane. So acid cleaning using organic acid such as oxalic acid is necessary in Chemical in Place (CIP). At the economical aspect the electrical cost of membrane system is higher than that of slow sand filtration but labor cost can be reduced by automation. However, the use of labor should be determined considering effectiveness and stability of operation. Because during the operation, there are several breakdown such as electrical shock by lightning, water drop in summer, etc.

Development of Activity and WBS for Integrated Cost and Schedule Control Process in Bridge Works (공정$\cdot$공사비 통합관리를 위한 Activity 및 WBS 구축 방안 -교량공사 예시)

  • Kim Jung-Ki;Lee Young-Dae;Kim Soo-Yong;Park Hyeo;Kim Sung-Hwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.406-409
    • /
    • 2001
  • This study refers to development of WBS(Work Breakdown Structure) and Activity sample for integrated cost and schedule control system of sample bridge work in the field. The conclusions from this study may be summarized as following 1. It showed that the level of detail to network's activities depend upon schedule's intended purpose. 2. It is more effective 'activity to cost package model' than 'activity to resource model', for integrated cost and schedule control reflect the characteristics of domestic construction industry.

  • PDF