• Title/Summary/Keyword: bidding price

Search Result 179, Processing Time 0.026 seconds

Analysis of Cost Variation of Piping Equipment Design of a Steel Manufacturing Plant by Simulation (시뮬레이션을 통한 제철플랜트 배관장치 설계비용의 변동 범위 분석)

  • Bae, Kyung-Suk;Heo, Ki-Moo;Yoon, Sung-Hoon;Moon, Yoon-Jae;Yoo, Ho-seon;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.10 no.4
    • /
    • pp.29-34
    • /
    • 2014
  • In this consideration, this research investigated the piping design items and drew out key design items through interview with experts and surveys to apply them to actual project examples and look into piping design item-specific significance and cost variation ranges. Based on this investigation, the Monte-Carlo simulation was employed herein to analyze the cost variation range for the entire piping design costs with a view to presenting a way to calculate a reasonable bidding price for any similar project and verify the appropriateness of joining a bid.

  • PDF

Development of Labor Productivity Index for Steel Construction (철골공사의 노동생산지수 개발)

  • Kang Byoung-Ryoul;Kim Ki-Sung;Um Ik-Joon;Koo Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.353-357
    • /
    • 2004
  • The construction competition is more deepened with the enterprise possibility increase which it follows in the regulation relaxation back against the construction market penetration which carries and the instability of market is added an extra weight and it solves the aspect where also the profitability which is caused by with low price bidding decreases. Against a productivity with the overcome plan it is researched plentifully and the far for a productivity improvement, there is so far to construction, the productivity being used with only include meaning, is to a practical affairs and the application ver)r as the level which is feeble is a possibility of doing. It is like that and the research develops the producing district possibility of new steel-frame work and in the actuality which sees the production volume of steel-frame work and a construction accomplishment process effectively and to be right numerical figures it does it plans it controls and manages the place ultimate objective which it puts.

  • PDF

A Survey for a Development Construction Materials' Construction Site Quality Control Guide (건설자재 현장품질관리 지침 개발을 위한 실태조사)

  • Ko, Eun-Joo;Ko, Eun-Jung;Seok, Ho-Joong;Lee, Seung-Hyeok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.1-5
    • /
    • 2008
  • The purpose of this study is to ensure an amicable material quality control in the construction site through investigating a process which can impact the construction material quality. For it, a worker interview and questionnaire survey was conducted through a direct field visit. The visited construction sites are composed of 79% construction site and 21% engineering site. As the respondents of questionnaire survey, the quality control workers were 72% of total respondents. Next, the construction worker, handymen, field representatives and others formed 7%. The interview with the quality control staff was conducted with the items including the construction site quality control guide, incoming inspection and material management. Through this survey, the problems of quality control by progress phase were derived. It could be known that the management and measures by each phase were urgently required. It also was indicated that a selection of low-priced material caused by low price bidding could badly impact the construction and safety. Also, in relation to the opinions such as the insufficient quality control and heavy work-load, the improvements are required. For the effective quality control in the construction site, the material quality control procedures suitable for the phase of construction progress must be presented in the present quality control. Also, the standards for it need to be established.

  • PDF

Application of Incentive on Design VE to Public Design-Build Projects (공공부문 설계시공일괄사업의 설계VE 인센티브 적용방안)

  • Lee, Hun-Woo;Jung, Jae-Hoon;Kim, Hae-Gon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.284-288
    • /
    • 2006
  • Ministry of Construction & Transportation prescribes that all of the construction works including Design-Build whose cost more than then billion won must be applied VE at the design phase. It is difficult to apply VE at the design development phase to design-build projects under current design-build contract because design should be proceeded with fixed price by bidding. Therefore the present study suggests an application of incentive which can maximize the effectiveness of design VE in design-build projects after analysing current design-build's characteristics and difficulties of design VE application.

  • PDF

The study on improving the regulation for industrial accident rate level assessment of construction companies (건설업 산업재해발생률 산정·평가기준 개선방안 연구)

  • Park, Yong-Kyu
    • Journal of the Korea Safety Management & Science
    • /
    • v.18 no.3
    • /
    • pp.17-24
    • /
    • 2016
  • The regulation for industrial accident rate level assessment of construction companies was introduced to the construction industry in the Republic of Korea since 1993 and has brought positive outcome on industrial accidents reduction at construction work sites. There were considerable decrease of industrial accident ratio and enforcing of contrators' safety organizations from the beginning of the regulation for industrial accident rate level assessment. In spite of these positive outcomes, there were some negative effects such as contractors' shrinking accident reports to keep good accident ratios since these figures had a great impact on pre-qualification stage of bidding when general contractors were competing for new construction projects. In addition, Comprehensive evaluation bid system, which replaces the lowest price bid system is applied to government-ordered construction projects since 2016. Comprehensive evaluation bid system includes construction company's accident rate as one of the evaluation items and carries out with the industrial accident rate level assessment of construction companies at the same time. The regulations of two systems have been called for improvement to unify these different procedures and standards which have led business stakeholders to confusion for several years. This study aims to devote on lessening shrinking accident reports and to reduce the waste of business stakeholders through changing the regulation for industrial accident rate level assessment.

Multi-agent Negotiation System for Class Scheduling

  • Gwon Cheol Hyeon;Park Seong Ju
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2002.05a
    • /
    • pp.863-870
    • /
    • 2002
  • The current class scheduling has difficulties in reflecting students' preferences for the classes that they want to take and forecasting the demands of classes. Also, it is usually a repetitive and tedious work to allocate classes to limited time and cesourres Although many research studios in task allocation and meeting scheduling intend to solve similar problems, they have limitations to be directly applied to the class-scheduling problem. In this paper. a class scheduling system using multi agents-based negotiation is suggested. This system consists of student agents, professor agents and negotiation agents each agent arts in accordance with its respective human user's preference and performs the repetitive and tedious process instead of the user The suggested system utilizes negotiation cost concept to derive coalition in the agent's negotiation. The negotiation cost is derived from users' bidding prices on classes, where each biding price represents a user's preference on a selected class. The experiments were performed to verify the negotiation model in the scheduling system. The result of the experiment showed that it could produce a feasible scheduling solution minimizing the negotiation cost and reflecting the users' performance. The performance of the experiments was evaluated by a class success ratio.

  • PDF

A Study on Contract Attributes, Firm's Performance and Partnership Intention in the Digital Contents Service Industry (디지털 콘텐츠 산업에서의 계약 속성, 성과 및 파트너십 의도에 관한 연구)

  • Kim, Seon-Min
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.4
    • /
    • pp.271-279
    • /
    • 2012
  • Although digital contents markets grow very rapidly and are known as a higher value added industry, there is also potential risk in producing digital contents. Thus, many firms have begun to produce a firm's digital contents by outsourcing from other companies in order to catch-up new technologies and to make stable profits. However, since contracts are decided mostly based on bidding price and also standard contract are not available, there is a limit on the benefit from the contents outsourcing. Thus, this study argues that if both contract factors such as contract concreteness and flexibility are well managed, the on-line digital contents will increase the performance of a firm. This study deals with the influence on the firm's performance by the outsourcing in contract factors based on the empirical analysis. Using regression analysis with these two dependent variables, the findings showed that the contract concreteness had positive effects on both cost improvement performance and efficiency improvement performance, but the contract feasibility only had positive effect on efficiency improvement performance. In addition, the result of the study showed that the contract performance of outsourcing the digital contents have a positive impact on the partnership intention.

An Improvement Plan of Ex-post Settling up System on the Social Insurance of Construction Project - Focused on the National Pension and National Health Insurance - (건설공사 사회보험료 사후정산제도의 문제점 및 개선방안 - 국민연금 및 국민건강보험을 중심으로 -)

  • Oh, Chi-Don
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.1
    • /
    • pp.29-36
    • /
    • 2019
  • In the past, social insurance premiums, such as national pension and national health insurance, is contained within the costs of construction projects, have been lowered due to price competition of companies participating in the bidding. The government is implementing the "Ex-post settlement system" to improve the problem. Therefore, the purpose of this study is to examine the concept of an Ex-post settlement system and background of its introduction and to identify problems in the management of the system. The problems of the Ex-post settlement system are: 1) avoiding the participation of construction workers, 2) the rigidity of the insurance premium settlement method in construction field, and 3) the cause of direct construction cost reduction. The ways to improve these problems are: 1) excluding social insurance premiums from construction project cost, 2) securing flexibility of the settlement method of insurance premiums in construction field, and 3) expanding the scope of persons eligible to participate in social insurance.

A Study on the Analysis of Current Situation of Safety Inspections cost in Apartment houses (공동주택 안전점검대가 현황분석에 관한 연구)

  • Go, Seong-Seok;Song, Do-Heom;Yun, Yeong-Chae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.62-70
    • /
    • 2014
  • An apartment house, a private facility, is a house built for many persons to live independently in a building. An apartment house is a building where life damage can happen most in case of a safety accident due to insufficient inspections. However, formal inspections are being realized due to awareness shortage of managing bodies about safety inspection and low-price order-receiving of diagnosing enterprises via the lowest bidding method. This is because it is judged that remarkable costs are inputted in repairs and reinforcement such as maintenance of a structure and that there is a large possibility of human damage in case of a safety accident in a structure. So, this paper aims to derive the points to improve in the current criterion to execute an efficient detailed inspection. As its method, the design price and execution price situation of 66 buildings inspected in detail for recent 3 years for the class 2 facilities in Gwangju Metropolitan City and Jeonranam-do are examined and analyzed. The state2 object buildings to inspect are selected through this. And this paper aims to present the points to improve through the analysis of current problems by evaluating the detailed inspection report and the detailed inspection execution price calculation criterion for the selected 10 apartment houses.

A Study on the Auction Schemes of Fish Commodities in the Koheung Region (고흥지역 수산물 경매시장의 특성에 관한 연구)

  • 강연실
    • The Journal of Fisheries Business Administration
    • /
    • v.29 no.2
    • /
    • pp.111-141
    • /
    • 1998
  • Why are auctions so prevalent in fisheries fields\ulcorner One answer is, perhaps, that fisheries products have no standard value. The price of any catch of fish (at least of fish destined for the fresh fish market) depends on the demand and supply conditions at a specific moment of time, influenced by prospective market developments and prices must be remade for each transaction. There are various auction schemes including written-bid method in Korea. It is difficult to make decision the application of auction selling in market distribution. One reason is the absence of adequate data on which to base firm statements. There is very little precise information about the relative volume handled by auction scheme as compared with other sales schemes Because of the paucity reliable data, one must depend largely on qualitative in attempting to above this problem. This paper is designed to examine which auction scheme is more efficient as a economic tool by introducing the three auctions, as samples, utilized in Koheung peninsula. Koheung coast with abundant fisheries resource, locates on the Middle-South part in Korea and has three auction firm operating by fisheries cooperatives. fur selling of dry fish included sea weed, live fish and fresh fish respectively, As a result, 1 found that there are three interesting auction schemes as follow : 1. More than one winners are selected as buyers. The highest bidder can at first get fishes he wants to buy, second winner can get surplus fishes after the highest bidder employes one's privilege with the highest pay, and next winner would be a buyer if fishes would be left in sequence after being sold with higher price. Every fisherman can sell one' s fishes with equal unit price if he delivery it to the winner within one day. Therefore, all the vendors feel they are equal members of fisheries cooperation. 2. Written-bid pricing on the cover of handy book. It is easy to write and to erase the figure more than on the small black board, and is convenient also to keep in the pocket. 3. Auctioning on the fixed platform with fixed fish tank is a very fast auction scheme in spite of short displaying time. Auctioneer presides bidding at one place on the fixed platform, instead of moving, vendors should carry a container of live fishes in the fish tank into showing table in front of would-be buyers and auctioneer. Although the applicability of the auction system to a marketing problem depends in part on subjective considerations by those making decision, basically it is a matter of comparative economic efficiency. In general, if the scheme maximizes returns in relation to the effort expanded by both buyers and sellers, it will be utilized. If it does not, a more efficiency may take place over a period of time, but, even more important, those making decisions may become aware of the potentialities of new schemes. Therefore, in order to applicate the three interesting auction schemes introduced in this paper to other fisheries market, it is necessary not only to analyze many other auction schemes but also to compare the economic efficiency those schemes utilizing in other fisheries market.

  • PDF