A Study on the Analysis of Cost Adjustment Scenarios by Bidding Method through Analysis of the Total Project Cost Management Process (총사업비 관리 프로세스 분석을 통한 입·낙찰 방식별 공사비 조정 시나리오 분석 연구)

  • Kim, Kyeongbaek;Lee, Gayeoun;Kim, Sangbum
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.30-38
    • /
    • 2020
  • Inadequate cost management has widely been recognized as one of the most problematic areas in the Korean construction industry as many believes that public cost references are not reasonably reflecting the market conditions. 'Total Project Cost Management Guideline' developed by Ministry of Economy and Finance(MOEF) to govern public budget control has been identified as one of the main reasons for this problem. This study attempts to thoroughly review 'Total Project Cost Management Guideline' itself and quantitatively analyze the impact of it on project cost during procurement process. Different procurement methods are considered including turnkey & alternative, private contract, qualification examination, and lowest price bidding system in this quantitative impact analysis of 'Total Project Cost Management Guideline'. Analysis results shows that this governmental process works mainly as a constant cost-cutting tool throughout the procurement process.

A Study on the Policies to improve the Escalating Regulations of Construction Price - With a Focus on Results of a Delphi Survey - (물가 변동에 따른 건설공사비 조정 제도의 개선 방안 - 델파이(Delphi) 설문 조사 결과를 중심으로 -)

  • Choi Min-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.203-211
    • /
    • 2004
  • This study is the results to survey on the problems and improvable Policies for current escalation system in construction contracts, through a Delphi survey to experts. From the survey results, it is desirable to decide the fluctuation rate of construction cost, which is the requirement of escalation clause, on the basis of inflation rate or construction cost index. The desirable price fluctuation rate is proposed as a $3\%$ level. However, it is difficult for construction companies to cope with the sudden increase of material price in advance, arising from short-term shock factors such as exchange rate and international raw material's price. Accordingly escalation system for specified materials, as an exceptional mode, should be introduced. As a method to calculate the fluctuation rate, ARCA(adjustment rate for the categories of articles) is more desirable than ARI(adjustment rate for an index), because the ARCA can be more reflected the characteristics of each construction work.To rationalize the ARI method, it is needed to announce the wage index, material index and machinery expense index via detailed classification by construction types. Also, it is desirable to prescribe the bidding date as a starting date of the price change, rather than contact signing date. considering the price change can happen since the biddiilg stage.

Design and Implementation of Intelligent Agent based Margin Push Multi-agent System for Internet Auction (인터넷 경매를 위한 지능형 에이전트 기반 마진 푸쉬 멀티에이전트 시스템 설계 및 구현)

  • Lee, Geun-Wang;Kim, Jeong-Jae;Lee, Jong-Hui;O, Hae-Seok
    • The KIPS Transactions:PartD
    • /
    • v.9D no.1
    • /
    • pp.167-172
    • /
    • 2002
  • Recently, some of people are keep in research and development of the further more efficient and convenient auction systems using intelligent software agents in electronic commerce. The purpose of this thesis is that a simple auction system has web bulletin boards, is aided by intelligent agent, and generates pertinent auction duration time and starting price for auction goods of auctioneer into a auction system, then the auctioneer gets the highest margin. The seller who want to sell goods, is using internet sends mail that has information for goods to agent of internet auction system. The agent undertake filtering process for already learned information about similar goods. And it calculate duration time and start price from stored bidding history database. In this thesis we propose a mailing agent system pushing information in internet auction that enables to aid decision for auctioneer about the starting time and price which delivers the highest margin.

Application of Probabilistic Risk Analysis for Profitability-Evaluation of Apartment Reconstruction Projects (아파트 재건축사업의 수익성평가에 대한 확률적 위험도 분석 모형 적용방안)

  • Woo, Kwang-Min;Lee, Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.167-176
    • /
    • 2006
  • It was found that Korean Standard of Estimate which has been used as the only basis of cost estimate of public construction projects had some side effects such as jerry-build construction and over-estimation because it failed to reflect the current price and the state-of-the-art construction methods in a changing construction environment. Therefore, the government decided to gradually introduce historical construction cost into cost estimate of public construction projects from 2004. This paper presents analytic criteria and a process model for deducing more current and reasonable historical construction cost for contract items from not only previous contract prices but also all of the other bid prices that were not contracted. The procedure of estimating actual unit cost proposed in this paper focuses on the removal of abnormal values including strategically too low or high prices and the time correction. In addition, basic research is conducted for the correction of actual unit cost through the analysis of fluctuation of bid price depending on bidding types and rates of successful bid. It is anticipated that the effective use of the proposed process model for estimating actual unit cost would make the cost estimation more current and reasonable.

A Study on Associations among Number of Bidders, Contract Award Rate and Profitability on International Construction (해외건설에서의 입찰 업체 수와 프로젝트 수주성공률 및 수익률의 상관관계에 관한 연구)

  • Sohn, Tae-Hong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.2D
    • /
    • pp.247-253
    • /
    • 2011
  • In 2009, the Korean international construction industry showed a great performance, totaling 49.1 billion of contract and then this achievement has been considered a key milestone presenting that the international construction industry is one of the primary export industries of Korea. However, because of the construction firms' equalized levels of technology and price competitiveness, the competition among bidders is becoming more intensive. Moreover, this changing market circumstance leads construction firms to apply for bidding with the lowest price that could not meet the expected profitability of a project. Therefore, to develop various strategies based on project characteristics becomes one of the critical capabilities that construction firms should possess. Based on these motives, this study is aimed to investigate associations among number of bidders, contract award rate, profitability on international projects. For the correlation analysis, a set of data is structured by collecting all projects ranging from 1993 to 2009, excluding projects funded by official development and domestic funds. The number of bidders were grouped depending on project characteristics such as market regions, project types, bidding types, and order organization types. As the result of correlation analysis, contract award rate increases as the number of bidders increase, but the relationship between the number of bidders and profitability is negative. Understanding the correlations among variables can be employed in developing strategies to improve construction firms' competitiveness in the international construction market.

Improvement on the Managerial Method of Price Fluctuation System (물가변동제도 운영방식 개선방안)

  • Lee, Jae-Seob;Shin, Young-Chul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.3-11
    • /
    • 2011
  • There are several causes to recalculate the contract amount in public construction projects. Among them, the escalation clause was introduced in 1969 and now the condition to recalculate the cost is effective after 90 days from the date of contract and the rate of fluctuation should be more than 3% from the date of bidding. The two calculation methods for the rate of fluctuation are item-adjustment and index-adjustment. According to the results of investigation into 4 public institutions and 163 projects, all of them have used the method of index-adjustment and the rate of projects that spend over 6 months obtaining the approval of contract amount adjustment is more than 90%. The reason for spending lots of time is caused by problems of the calculation method on the price fluctuation rate. Therefore, it is necessary that the calculation method should be diversified to cope with the problems and a option of the builder should be expanded as well. Furthermore, if the way to apply correction factors to construction price index and average index based on the producer and consumer price index made by the bank of Korea is added, then the duration will be reduced without additional expenses. This study proposed the diversification of the calculation method using price fluctuation rate and builders' expanded options as improvement on the managerial method of Price Fluctuation System for the prompt and efficient contract amount adjustment.

A Study on the Fisheries Marketing Channels (수산물 마아케팅 경로(FMC)에 관한 연구)

  • 강연실
    • The Journal of Fisheries Business Administration
    • /
    • v.23 no.2
    • /
    • pp.101-128
    • /
    • 1992
  • How to distribute fisheries catches from producer to consumer is very important for everybody joined fisheries marketing channels (FMC), because most people are influenced their revenue and expenditure through marketing channels. Many institutions in Korea after 1960's have tried to develop the rationalization of FMC, but they have not gotten the satisfactory results in general in spite of a lot fruits. Comparing with general manufacturing industry, the fisheries industry has some specializations in the marketing channels. It makes them unique structure included wholesale market system similiar to fresh (perishable) food market with expertised technology. Wholesale market collects, distributes the fisheries catches and evaluates in by auction or bidding without consideration of producer's opinion. It is very necessary institution to make a decision to equatible price for fresh food and to play an important role for marketing effectiveness with minimum total transation and with massed reserve among institutions. But it has two weak points to increase the marketing cost and to make products bad fresh (perishable). Therefore, both Producer and consumer want to find the direct channels not to pass through wholesale market and to get more profit. I wanted to explain what problems of traditional FMC are and why the direct channel is necessary as follows in this paper. Chapter II : The types and specialization of FMC Chapter III : The structure and problem of fisheries wholesale market channel Chapter IV Marketing cost of FMC and direct channel I suggested when the direct channel in FMC is designed, new planner must carry out marketing functions which are performanced by wholesaler, middle man and the joined members of auction at wholesale market. In view of consumption area, these functions are : (1) the finding of production partner to make a business ; (2) communication of information ; (3) collecting ; (4) distribution ; (5) selecting and grading ; (6) evaluating ; (7) financing and payment ; (8) organization, in view of consumption area. The government must support also the group or individual of new direct channels to succeed it with (1) furnishing of market information (2) supplying of land and facility (3) financing (4) feed-back of dierct channels totally (5) making an opportunity of communication between producer and consumer. I want to emphasize again wholesale market is necessary and important institution for equatible price of fresh food in spite of the its weak points. At the same time. the direct channels are necessary to reduce the marketing cost and to keep better fresh food.

  • PDF

A Study on Model Establishment of the Validity Evaluation for BTL Project Expenses Using an Analytic Hierarchy Process (계층분석법(AHP)을 이용한 BTL사업비 타당성 평가모형정립에 관한 연구)

  • Lee, Chun-Kyong;Jung, Young-Han;Park, Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.905-908
    • /
    • 2008
  • The BTL project, 4 years since its operation, has benchmarked the PFI Project in Japan and has been introduced. Given the evaluation step to select a preferred bidder, in a technological factor, the basic plans are corrected and complemented, whereas in a price factor, the low price bidding system is being enforced. There is concern that how to select preferred bidders and how to operate project costs during operation and management period may be problematic. Thus, in this study, using the Analytic Hierarchy Process, the method of deciding the pribrity to select preferred bidders in an early stage of the project and the evaluation model to evaluate the validity of BTL project expenses in process of project enforcement are established. Targeting the group. composed of experts who have experiences in the BTL project. Then, the levelling of evaluation factors and grouping have been carried out as following: LCC analysis and disbursement for government including two more detailed factors.

  • PDF

Orders Status Analysis on the Successful Bidder Decision Method of Turnkey Alternative Tendering Construction (턴키·대안입찰공사 낙찰자 결정방식에 의한 수주현황 분석)

  • Park, Hong-Tae;Lee, Yang-Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.771-780
    • /
    • 2013
  • Inspection system which was performed in the past selected the final winning bidder by separating Pre-Qualification, the basic design evaluation and price evaluation. However, turnkey and alternative bidding construction has selected way to determine the successful bidder as the best design and the most low cost method, comprehensive evaluation method (bid price adjustment, design score adjustments, weights standard), the best design and the fixed amount method from january 1, 2010 to the present. Due to these institutional problems, orders institutions were often a way to determine the successful bidder to apply differently for identical or similar construction. Therefore this study winning bidder selection criteria through analysis of construction the number and construction order performance, order performance by work division and institutional orders, the weights bidder order performance and orders status of turnkey alternative tendering construction to civil part performed in domestic.

CoDABot: An Agent-Based Continuous Double Auction System

  • Jung, Yong-Gyu;Kim, Kwang-Su;Kim, In-Cheol
    • Proceedings of the Korea Inteligent Information System Society Conference
    • /
    • 2001.01a
    • /
    • pp.78-82
    • /
    • 2001
  • Most of current Internet auction systems are simple server programs that partly automated the function of the conventional auction house. These system do not provide sufficient independence, distribution and parallelism between the functions of the conventional auction house. In there are automated by server program, but still users need to execute a repetitive task to monitor the dynamic progress of a certain auction, decide proper bid price, and submit the bid. Another problem is that they support only single as English auction and Dutch auction, but they do not support the double auctions are superior to the single auction with respect to speed., efficiency, and the fair distribution of profit. In this paper, we present design and implement of an agent-based continuous double auction system, called CoDABot, in order to mitigate the limitations of current auctions system. CoDABot supports continuous double auction, provides various bidding agent for users to select, and has been implemented into a multi-agent system that realize more independent, distributed, and parallel subsystems.