A Study on Model Establishment of the Validity Evaluation for BTL Project Expenses Using an Analytic Hierarchy Process

계층분석법(AHP)을 이용한 BTL사업비 타당성 평가모형정립에 관한 연구

  • Published : 2008.11.07

Abstract

The BTL project, 4 years since its operation, has benchmarked the PFI Project in Japan and has been introduced. Given the evaluation step to select a preferred bidder, in a technological factor, the basic plans are corrected and complemented, whereas in a price factor, the low price bidding system is being enforced. There is concern that how to select preferred bidders and how to operate project costs during operation and management period may be problematic. Thus, in this study, using the Analytic Hierarchy Process, the method of deciding the pribrity to select preferred bidders in an early stage of the project and the evaluation model to evaluate the validity of BTL project expenses in process of project enforcement are established. Targeting the group. composed of experts who have experiences in the BTL project. Then, the levelling of evaluation factors and grouping have been carried out as following: LCC analysis and disbursement for government including two more detailed factors.

시행 4년차를 맞이하는 BTL사업은 평가부문에서 일본의 PFI사업을 벤치마킹하여 도입되었는데 우선협상대상자 선정평가단계를 살펴보면, 기술적 요소는 시설사업별로 수정 보완되어 고시되는 반면 가격요소 부문은 여전히 최저가 낙찰제가 시행되고 있다. BTL사업의 가격부문은 임대형 사업이라는 특성을 감안해 볼 때 우선협상대상자 선정 방식에 대한 문제 제기와 더불어 향후 운영관리기간 동안 사업비 운용에 대한 우려가 높아지고 있다. 이에 본 연구에서는 계층분석기법을 활용하여 사업초기 우선협상 대상자 선정을 위한 우선순위 결정방법과 사업수행과정에서의 BTL사업비용 타당성 평가를 위한 평가모형을 정립하고자 한다. BTL사업 참여 경험이 있는 전문가 집단을 대상으로 평가 요소를 추출하였으며 평가요소 Levelling과 항목에 대한 Grouping을 통하여 3단계 평가모형을 정립하였다 ; 1단계 - LCC분석과 정부지급금 산출, 2단계 - 1단계 요인에 더하여 각각 분석기준 및 방법의 적정성, RFP요구조건 반영, 비용관련계획의 적정성, 산출비용의 적정성, 3단계 - 각각의 2단계 요인에 대하여 3개-5개의 요소.

Keywords