• 제목/요약/키워드: berth

검색결과 226건 처리시간 0.027초

Full-ship Load Out in Skid Berth

  • Kim, Yeong-Hwan;Kim, Hoe-Yong;Kang, Kyoung-Hyuk
    • 대한조선학회 특별논문집
    • /
    • 대한조선학회 2008년도 특별논문집
    • /
    • pp.133-135
    • /
    • 2008
  • For complying with the increasing number of ships construction, it's required that not only for minimizing the period of construction in Skid Berth also maximizing application proportion of Skid Barge, The full-ship load out construction method required indispensably.

  • PDF

컨테이너 터미널에서 일반부두와 양현부두의 본선작업 완료시간 비교 연구 (A Comparison of Operational Productivity between Conventional berth and Indented berth in Container Terminals)

  • 정다훈;박영만;이병권;김갑환
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 2006년도 추계학술대회
    • /
    • pp.336-345
    • /
    • 2006
  • 최근 컨테이너 선박의 대형화는 물동량을 크게 증가 시켰으며, 이로 인해 컨테이너 터미널에서는 규모의 경제를 달성하고, 선사의 요구를 만족시키기 위해 노력하고 있다. 이에 대한대안이 양현부두(Indented berth)의 등장이다. 양현부두에는 대형 컨테이너선의 물량을 신속히 처리하기 위해 선석에서 컨테이너를 취급하는 장비인 안벽크레인(Quay Crane : QC)의 작업 대수가 일반부두(Conventional berth)보다는 많이 할당될 수 있다. 본 연구에서는 일반부두와 양현부두의 작업 생산성을 비교하였다. 이를 위하여 탐색기법인 GRASP(Greedy Randomized Adaptive Search Procedure)를 적용한 안벽크레인 일정계획 알고리즘을 이용하였다. 또한 컨테이너 터미널의 실제 자료를 이용하여 두 가지 형태의 부두에서의 본선작업 완료시간을 비교 하였다.

  • PDF

경인항 인천컨테이너터미널의 최적 부두길이 산정에 관한 연구 (A Study on the Assessment of Optimum Berth Length for Incheon Container Terminal of the Kyeong-In Port)

  • 김세원;박영수;김태민
    • 수산해양교육연구
    • /
    • 제23권2호
    • /
    • pp.210-220
    • /
    • 2011
  • The Keyongin Inland waterway will connect with Han-River and the Northen part of the Incheon-seaway and this way will be opened at the early of October this year. In this regard, the Incheon container terminal is under constructing for 1,000 TEU & 550 TEU container vessels at the place of leftside of the Seohae lockgate. However the terminal length is not still fixed due to at a great expenses of construction and dosposal matter of the dredged soil. So this paper will suggest the optimum berth length by using the full mission shiphandling simulator for berthing and unberthing shipmaneuvering. And also evaluates the design standard of harbor construction rules and analysis optimum berth length against ship's length for safe shiphandling at terminals in accordance with the customary practices of the major ports in Korea.

선석의 연속접안을 고려한 인천항의 시뮬레이션 연구 (A Simulation Study Based on the Continuous Berth Utilization in Inchon Port)

  • 최현규;이창호
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2000년도 추계학술발표논문집
    • /
    • pp.95-99
    • /
    • 2000
  • The domestic ports become less competitive for the out of dated equipments and inefficient information system. Specially, Inchon Port, which is the second largest port of Korea, has the point at issue such as the excessive logistics cost because of the limit of handling capacity and the chronic demurrage. In this paper to develope the simulation programs the basic input parameters such as arrival intervals, cargo tons, service rates are analyzed and the probability density functions for there variable are estimated. Also to perform the conception of continuous berth utilization, the berth and cargo classification is reconstructed. And the more actual simulation is realized by using more detailed depth representation of water The simulation model is executed based on the knowledge base and database, and is constructed using Visual Basic and Access database. Simulation results reveal that this study suitably reflect the real berth operation and waiting time of ships is shortened.

  • PDF

불확실성을 고려한 해군함정 선석 할당 방안 (The Berth Allocation Method for the Navy Surface Vessels Considering Uncertainty)

  • 정환식;이재영;이용대
    • 한국군사과학기술학회지
    • /
    • 제13권5호
    • /
    • pp.748-758
    • /
    • 2010
  • Navy surface vessels require pier services such as emergency repair, oil supply, arm loading/unloading, craning, standby readiness, normal repair, gun arrangement, ammunition loading, and food loading during the period in port. The purpose of this study is to establish efficient berth allocation plan for navy surface vessels in home port under the limited resources of piers and equipments. This study suggests Mixed Integer Programming model for berth allocation problem, considering precedence relationships among services and the uncertainty of the arrival and departure for each vessel. For an effective analysis, the model is implemented by ILOG OPL(Optimization Programming Language) Studio 6.0 and ILOG CPLEX 11.1., which shows a reasonable result.

Design Conditions for Dolphin Berth by Tanker Fleet Analysis

  • Kang, Seok-Jin;Lee, Joong-Woo;Lee, Dong-Hyun;Kim, Hee-Jae
    • 한국항해항만학회지
    • /
    • 제37권6호
    • /
    • pp.647-653
    • /
    • 2013
  • Energy acquisition due to the increase of oil price is one of the most important issues and policy for most countries. Various tankers have been built in the world and sent to the trade market. It is necessary to build the port infrastructure and facilities to give them proper services such as mooring, packing, storing, and transshipment, etc. However, the domestic guidelines or standards for design and construction for the dolphin berth among these facilities are out of date and do not meet the recent trend of tanker types. Therefore, it requires amendment on the guidelines or standards. In this study, a detailed analysis of the tanker fleet, covering 8,000 ships under operation and order to build, is made to estimate the proper PBL(Parallel Body Length) of each tanker class. After discussion and comparison on the dolphin berth design and construction codes of various countries, those are the leading countries of tanker operation and management, suggestion was made to amend on the design code. The referred codes are of Korea, Japan, UK, USA, and Canada. The analysis of tanker fleet shows the PBL as 0.45L under the normal ballast condition. In order to verify the deduced amendment on the domestic design code for dolphin berth, it was selected one of the domestic dolphin berth, located at the Yeosu oil terminal, which is almost completed to construct. The design criteria and expected tankers to moor in that terminal were analyzed and the appropriateness and countermeasure for deficiency were summarized.

선박 도착시간의 불확실성에 강건한 선석 계획 (Robust Berth Planning under Uncertain Vessel Arrival)

  • 박현지;박진형;조성원
    • 한국항해항만학회지
    • /
    • 제45권3호
    • /
    • pp.102-108
    • /
    • 2021
  • 본 연구의 목적은 선석 계획 수립 시에 선박 도착시간의 불확실성에 따른 피해를 대비할 수 있는 방법론을 개발하는 데에 있다. 세계적으로 수입량과 수출량이 급증하면서 컨테이너 터미널 선석 계획의 효율화가 더욱 중요해졌다. 선석 계획은 컨테이너 터미널의 처리용량을 결정하기 때문에 선박 사이의 시간과 공간적 간격을 최소화하여 선석 활용도를 극대화하는 것이 중요하다. 실제 선석을 운영할 때에는 여러 불확실한 요소로 인해서 선박이 예정보다 늦게 도착하는 경우 기존의 선석 계획이 틀어지게 되면서 터미널이 큰 피해를 입게 된다. 이러한 피해를 방지하기 위해 본 논문에서는 기존의 문헌들을 조사하여 완충 시간을 도입하는 방법을 제안한다.

항해용선계약상 안전선석의 묵시조건에 관한 연구 (A Study on the Implied Terms of Safe Berth under Voyage Charterparty)

  • 한낙현;김은주
    • 한국항만경제학회지
    • /
    • 제26권3호
    • /
    • pp.92-113
    • /
    • 2010
  • 항의 안전이 아니라 선석의 안전이 담보되는 경우 용선자는 항이나 항내의 모든 선석에 영향을 미치는 해태 또는 위험에 의해 영향을 받지 않는 항내에 안전하게 접근할 수 있는 선석을 지정할 의무가 있다. Rebon호 사건에 있어서 판사는 중재인에 의해 이루어진 예비적 쟁점에 관한 최종선언적 중재판정을 기각하였는데, 이 사건은 제1심의 판사에 의해 이루어진 결정에 대한 상소와 관련된 사안이다. 제1심 판사는 결정에 대한 질문을 다음과 같이 다소 다르게 설명하였다. 즉 항해용선계약에 특정선적항을 지정하고 있거나, 용선자에 의해 항내에 선석을 지정할 수 있는 몇 개의 선석이 있거나, 용선계약상 선박에 대해 용선자에 의해 지시되어야 할 항 또는 선석 중 안전에 대한 명시담보가 없는 경우, 용선계약상 용선자가 선적항에서 안전선석을 지정할 묵시조건에 따르고 있는지 등이다. 판사는 법률문제라는 성격을 변경하지 않으면서 더욱더 정확한 조건에 기초하여 그 논점을 고려하였다. 그런데 판사는 그 질문에 대해 부정적으로 해답하였다. 이 사건에서의 쟁점이 중재에 회부되어 용선자에게 유리한 판정이 내려졌다. 선주는 지방법원에 상소하였지만 기각되었기 때문에 항소법원에 상소한 사안이다. 본 연구에서는 항해용선계약의 안전선석에 대한 묵시조건과 관련된 사안인 Rebon호 사건을 중심으로 분석하는데 목적이 있다.

항해용선계약상 도착선의 판단기준에 관한 연구 (A Study on the Judgement Criterion of Arrived Ship under Voyage Charterparty)

  • 한낙현;이재성
    • 한국항만경제학회지
    • /
    • 제28권3호
    • /
    • pp.167-192
    • /
    • 2012
  • 본 연구는 항해용선계약상 목적지표시의 원칙과 그 운용에 대해 Merida호 사건을 중심으로 분석하는 것에 목적이 있다. 선박이 항에 있거나 용선자의 자유재량으로 선박의 도착이 즉각적 또는 효과적으로 용선자의 이용에 맡길 수 있는 선석으로 즉각 도달하거나 또는 그와 같은 위치에 있는 선박은 도착선이 된다. 선박이 용선계약의 조건에 의해 화물을 선적 또는 양하할 의무가 있는 장소에서 지연이 발생한 경우 선박이 선석 또는 항에 있는지의 여부에 불구하고 특정 목적지의 식별표시는 화물의 선적 또는 양하함에 있어 지연에 의해 발생한 손해사고에 대해 영향을 미친다. Merida호 사건은 2009년 4월 20일 용선자가 2명의 저명한 중재인의 최종중재재정에 대해 상소한 사안이다. 2007년 2월 5일 본선 Merida호에 대해 용선자와 선박소유자 간에 체결한 항해용선계약은 Berth Charter이기 보다는 Port Charter이었다. 선주와 용선자 간에 이 차이에 대한 기본적인 관련성은 선적항과 양륙항에서 선박혼잡에 의해 발생한 지연위험의 분담이다. 이 상소에서 제기된 법적 쟁점으로서 중재인이 이 용선계약은 Port Charter이며 Berth Charter가 아니라는 판정을 내릴 수 있는 권리가 있는지 여부이었다. 중재인은 용선자가 하역준비완료통지서의 유효성에 대해서는 논쟁하지 않았다는 것을 판정하면서 따라서 본 용선계약은 Port Charter라고 판정하였다.

부산신항역 파랑반응에 따른 부두 가동율 해석 (Analysis of Berth Operation Ratio in terms of Wave Response at Busan New Port Site)

  • 정재현;이학승;이중우;양상용;정영환
    • 한국항해항만학회:학술대회논문집
    • /
    • 한국항해항만학회 2006년도 추계학술대회 논문집(제1권)
    • /
    • pp.57-62
    • /
    • 2006
  • 동북아의 허브항만으로 건설중인 부산신항만은 태풍 매미로 인해 480억원에 이르는 큰 피해를 입었다. 국내의 현행 항만설계기준을 보면 항만 정온도 기준은 선박규모별 항내 한계파고만이 규정되어있다. 그러나, 항만의 연중 이용일수를 나타내는 항만 가동률은 화물을 싣고 내리는 하역작업의 효율에 달려있으며, 하역효율은 다시 접안선박의 파랑에 의한 동요 및 하역기계의 성능에 따라 결정된다. 선박의 동요는 파고뿐만 아니라 주기에 따라서도 충분히 달라질 수 있으며 해 ${\cdot}$ 조류, 바람 등의 외력조건, 계류시스템의 특성과 선박의 제원 등의 복합적인 요인에 의하여 결정된다. 본 연구에서는 수치실험 및 관측 자료를 통해 평상시의 항만 가동률을 산정하고자 한다. 특히, 부산신항만의 개발초기단계에서의 계획으로부터 수심을 증심시킴과 아울러, 매립범위 및 해안선 형태 등 다양한 변화가 건설과정에서 나타났고 이를 본 연구에서 반영하여 상세해역과 장래 개발해역 둥에서 항만가동율을 재산정하였다. 파랑변형과정의 이해와 분석을 돕기 위하여 관련해역에서 정상상태 스펙트럼모델과 확장 완경사 파랑 모델을 부산신항역에 적용하여 항만반응 특성을 분석하였다.

  • PDF