DOI QR코드

DOI QR Code

Design Conditions for Dolphin Berth by Tanker Fleet Analysis

  • Kang, Seok-Jin (Gumseok Construction Co., Ltd.) ;
  • Lee, Joong-Woo (Department of Civil Engineering and SOST, National Korea Maritime And Ocean University) ;
  • Lee, Dong-Hyun (Department of Civil and Environmental Engineering, National Korea Maritime And Ocean University) ;
  • Kim, Hee-Jae (Department of Civil and Environmental Engineering, National Korea Maritime And Ocean University)
  • Received : 2013.10.30
  • Accepted : 2013.12.13
  • Published : 2013.12.31

Abstract

Energy acquisition due to the increase of oil price is one of the most important issues and policy for most countries. Various tankers have been built in the world and sent to the trade market. It is necessary to build the port infrastructure and facilities to give them proper services such as mooring, packing, storing, and transshipment, etc. However, the domestic guidelines or standards for design and construction for the dolphin berth among these facilities are out of date and do not meet the recent trend of tanker types. Therefore, it requires amendment on the guidelines or standards. In this study, a detailed analysis of the tanker fleet, covering 8,000 ships under operation and order to build, is made to estimate the proper PBL(Parallel Body Length) of each tanker class. After discussion and comparison on the dolphin berth design and construction codes of various countries, those are the leading countries of tanker operation and management, suggestion was made to amend on the design code. The referred codes are of Korea, Japan, UK, USA, and Canada. The analysis of tanker fleet shows the PBL as 0.45L under the normal ballast condition. In order to verify the deduced amendment on the domestic design code for dolphin berth, it was selected one of the domestic dolphin berth, located at the Yeosu oil terminal, which is almost completed to construct. The design criteria and expected tankers to moor in that terminal were analyzed and the appropriateness and countermeasure for deficiency were summarized.

Keywords

References

  1. BSI (1994), BS Code for Maritime Structures, Part 4.
  2. Clarkson Tanker Register (2012), World Fleet Register CD.
  3. Danish Ship Finance (2012), Shipping Market Review, October 2012, Denmarks Skibskireditv.
  4. Heidenreich Innovations (2012), Q88.Com.
  5. Kang, S. J. (2013), "A Study on Design Condition for Dolphin Berth by Tanker Fleet Analysis", PhD Dissertation, KMOU.
  6. Lee, D. H., Lee, J. W., Kang, S. J., and Kim, H. J. (2013), "Design Condition for Dolphin Berth by Tanker Fleet Analysis", ANC 2013 Proceedings, KINPR, pp. 491-498.
  7. MOF (1999), Technical Standards and Commentaries for Port and Harbour Facilities, pp. 1320-1340.
  8. OCDIJ (2002), Technical Standards and Commentaries for Port and Harbour Facilities in Japan, Daikousha Printing Co., Ltd., pp. 494-524.
  9. OCIMF (2009), "Mooring Equipment Guidelines", 3rd Ed., London, England.
  10. Transport Canada (2001), Transport Canada mooring guidelines and codes for oil terminals: TERMPOL Review Process (TRP) for Marine Terminals (TP 743 E), Appendix 3 Berth, Mooring and Fendering.
  11. US Navy (1986), Design Manual 26.4 (NAVFAC DM26.4), Fixed Moorings, Department of Navy.

Cited by

  1. Optimal pile design of dolphin structure considering axial compressive pressure-bending moment ratio under offshore load conditions pp.2041-3084, 2018, https://doi.org/10.1177/1475090218813598