We propose a test of consistency for two differentially private histograms using parametric bootstrap. The test can be applied when the original raw histograms are not available but only the differentially private histograms and the privacy level α are available. We also extend the test for the case where the privacy levels are different for different histograms. The resident population data of Korea and U.S in year 2020 are used to demonstrate the efficacy of the proposed test procedure. The proposed test controls the type I error rate at the nominal level and has a high power, while a conventional test procedure fails. While the differential privacy framework formally controls the risk of privacy leakage, the utility of such framework is questionable. This work also suggests that the power of a carefully designed test may be a viable measure of utility.
International Journal of Computer Science & Network Security
/
v.23
no.11
/
pp.149-161
/
2023
Internet of Things (IoT) is a relatively new concept that has gained immense popularity in a short period of time due to its wide applicability in making human life more convenient and automated. As an illustration: the development of smart homes, smart cities, etc. However, it is also accompanied by a substantial number of risks and flaws. IoT makes use of low-powered devices, so secure, less time-consuming and energy-intensive transmission (routing) of messages due to the limited availability of energy is one of the many and most significant concerns for IoT developers. The following paper presents a trust-based routing scenario for the Internet of Things (IoT) that exploits the past transmission record from the cupcarbon simulator's log files. Artificial Neural Network is used to quantify knowledge of trust, calculate the value of trust, and share this information with other network devices. As a human behavioural pattern, trust provides a superior method for making routing decisions. If there is a tie in the trust values and no other path is available, the remaining battery power is used to break the tie and make a forwarding decision; this is also seen as a more efficient use of the available resources. The proposed algorithm is observed to have superior energy consumption and routing decisions compared to conventional routing algorithms, and it improves the communication pattern.
Park, Joon-Ho;Yoon, Eun-Jung;Park, Jong-Tae;Yu, Chong-Gun
Journal of the Korea Institute of Information and Communication Engineering
/
v.15
no.11
/
pp.2457-2464
/
2011
In this paper, a vibration energy harvesting circuit using a piezoelectric device is designed. MPPT(Maximum Power Point Tracking) control function is implemented using the electric power-voltage characteristic of a piezoelectric device to deliver the maximum power to load. The designed MPPT control circuit traces the maximum power point by periodically sampling the open circuit voltage of a full-wave rectifier circuit connected to the piezoelectric device output and delivers the maximum available power to load. The proposed vibration energy harvesting circuit is designed with $0.18{\mu}m$ CMOS process. Simulation results show that the maximum power efficiency of the designed circuit is 91%, and the chip area except pads is $700{\mu}m{\times}730{\mu}m$.
Recently, many technologies of the P.L.C (Power Line Carrier) are introduced for an efficient communication. P.L.C communication sends information in the carrier signals by conduction over the power wire. An arc detector is proposed in this paper for the effective transmission. The Power Line Carrier has an advantage in low cost because it uses existent power line. It can be easily applied anywhere that a power line socket is available. But the P.L.C. is very noisy, because many electronic devices in generate electronic noise in modulated signals. This problem should be considered carefully in the design of the arc detector system using P.L.C in railway. The proposed system can be applied for monitoring the arc detector system and the arc locator system in railway. Hence the system will be able to exchange the arc information to be T.C.M.S. (Train Control Management System), bogies and even between a station and trains in railway and use to suspicion fire in train.
Journal of the Korean Institute of Electrical and Electronic Material Engineers
/
v.28
no.11
/
pp.743-747
/
2015
In this paper, the power generation efficiency of the 4 [kW] fixed-concentrated type photovoltaic power generation system and that of the 4 [kW] single axis trace type photovoltaic power generation system were compared. For that purpose, the two types of photovoltaic power generation systems have been in operation for 1 year on an experimental basis. The amounts of power generated by the two types during the months of January through December and the characteristics of their operating times during the same period have been compared and analyzed. For the study, the type with higher efficiency was selected and the following conclusions have been reached. It was shown that the amount of power generated and the average operation times during the spring months of March through May are higher that those of the summer months of June through August when more sunlight is available. The reason for this phenomenon is thought to be that as the temperatures of the solar panel surface and the surrounding environment go up, the electric current decreases.
The Transactions of The Korean Institute of Electrical Engineers
/
v.56
no.6
/
pp.1017-1022
/
2007
In this paper, we try to analyze the likelihood of exercising the power of market dominance by certain generators in future power industry of Korea. Firstly, we estimated installed generation capacity and sales volume of electricity in Korea, based on 'The 3rd Long Term Power Plan' which was announced in December 2006. Secondly, we calculated HHI, an index showing the degree of concentration of an industry, and RSI, an index showing how adequate the supply of goods or services of an industry is, using Fast-Forward. Thirdly, assuming a major generator employs the strategy of withholding a part of its available capacity at a peak time, we simulated hypothetical movement of SMP over a certain period of time, which is compared with that obtained without assuming such strategy to generate Lerner Index. an index showing the degree of market power of a monopoly. Regulators, home and abroad, have not given much interest in analyzing the effect of market dominance that is likely to be exercised by certain players in the future. That said, this paper provides insight into developing methodologies of analyzing and mitigating such effect by proposing the above indices to gauge it. In addition, this paper also shows the potential impact of employing capacity withholding strategy on the financial account of a dominant generator.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.63
no.3
/
pp.183-188
/
2014
Power conversion systems used in large gas turbine power plant can be divided into two main part. Because of the initial start-up characteristic of the gas turbine combustor, the gas turbine must be accelerated by starting device(LCI : Load Commutated Inverter) up to 10%~20% of rated speed to ignite it. In addition, the ECS(Excitation Control system) is used to control the rotor field current and reactive power in grid-connected synchronous generator. These two large power conversion systems are located in the same space(container) because of coordination control. Recently, many manufactures develop high speed controller based on function block available in the LCI and ECS with the newest power semiconductor. We also developed high speed controller based on function block to be using these two system and it meets the international standard IEC61131 as using real-time OS(VxWorks) and ISaGRAF. In order to install easily these systems at power plant, main controller, special module and IO module are used with high speed communication line other than electric wire line. Before initial product is installed on the site, prototype is produced and tests are conducted for it. The performance results of Integrated controller and application program(SFC, ECS) were described in this paper. The test results will be considered as the important resources for the application in future.
An, Hae-Joon;Kim, Hyun-Goo;Kim, Seok-Woo;Ko, Seok-Whan;Jang, Gil-Soo
한국신재생에너지학회:학술대회논문집
/
2009.06a
/
pp.539-541
/
2009
A severely cold weather condition of King Sejong Station, Antarctica becomes a very severe condition for an installation/operation of wind generation system. When the existing wind generation system works, it may cause a damage and destruction of wind generation system and can bring about big problems in terms of the power quality. Accordingly, it is essential to obtain technologies for the installation and operation of small wind generation system for the polar region's wind generation, and to assess and demonstrate the performance in the severely-cold environment and the polar wind generation system's development, supplementation, alteration. Also, as the available power of King Sejong Station, Antarctica, the diesel generator has been mainly used, and the wind generator has been used in the hybrid form. Wind generation and diesel generation has the different load following control each other. In the wind generation, the generated power very rapidly changes according to the change of the velocity of the wind. On the other hand, the diesel generation shows very gentle change in the velocity of output. Therefore, the study is intended to analyze the 10kw small wind generator-diesel generator's power quality of King Sejong Station, Antarctica, which is the hybrid system installation area.
This paper presents the case that the existing analog control systems were retrofitted with digital DCS(Distributed Control System)s for boiler unit in thermal power plant. Replacement of existing worn-out or obsolete analog control systems has been considered. Replacement of existing analog control systems with another analog control systems has lots of difficulties in maintaining the systems due to being out of stock. Due to those difficulties, existing analog control systems have been retrofitted with digital DCSs in many industrial sites. KEPRI(Korea Electric Power Research Institute) accomplished the project that retrofitted analog control systems with the developed DCSs for boiler unit in middle-scale coal-fired thermal power plant. The benefits of an upgrade to digital control include a increase of reliability due to system redundancy, ease of modifying the control logic and the parameters of function block, ease of maintenance due to available spare parts, improvement of information display, ease of modifying MMI(Man Machine Interface) displays, a increase in system availability, and improvement of control performance. This paper describes how to use the parameters of existing analog controllers, the implementation of digital PID controller, control system configuration for boiler unit in thermal power plant, some boiler control loops, control result during commissioning, and the comparison of boiler characteristic test data after retrofitting with the existing test data.
Journal of the Korean Institute of Telematics and Electronics
/
v.14
no.5
/
pp.7-14
/
1977
Conventionally, a TIVT has been used for high power amplification in the microwave frequency range. However, an ultra-high-power amplifier in the 2GHz range has successfully been designed and fabricated employing high power transistors developed recently and available commercially. In the design of the amplifier, a balanced-pair configuration is adopted in order to obtain very high microwave power, and a good impedance matching is achieved by making use of microstripline techniques. For the RF power divider as well as combiner, an approach of stripline directional coupler isadopted because of its easiness in fabrication. The coupler so designed and fabricated indicates a satisfactory performance as a quadrature hybrie coupler. Measurements on the amplifier developed for an immediate commercial application also exhibit excellent overall performance characteristics RF power output, 14 watts, gain 14dB, frequency bandwidth, 160MHz, effciency 40%.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.