• Title/Summary/Keyword: available power

Search Result 1,805, Processing Time 0.044 seconds

Design of RF coupler for KIRAMS-13;Korea Institute of Radiological & Medical Sciences-13

  • Jung, In-Su;An, Dong-Hyun;Kim, Yu-Seok;Yang, Tae-Gun;Kim, Jea-Hong;Jang, Hong-Seok;Hong, Bong-Hwan;Lee, Min-Yong;Hong, Sung-Seok;Chai, Jong-Seo;Oh, Bong-Hun
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2003.10a
    • /
    • pp.2203-2205
    • /
    • 2003
  • KIRAMS-13, the first medical cyclotron developed by domestic technique, is used to produce radio-isotope such as $^{18}F$ whose life time is relatively short through test operation. For high-power operation of charged particle accelerators, the power coupler must withstand enormous stresses due to charging induced by high RF power passing through. High-power RF testing with peak power in excess of 30kW has been performed on prototype power coupler for KIRAMS-13 normal conducting cavities. CST MICROWAVE STUDIO(CST MWS) is used for fundamental RF Design, and power coupler is manufactured according to fundamental power coupler design requisite. The qualification of the couplers has occurred for the time being only in a limited set of conditions as the available RF system and control instrumentation are under improvement.

  • PDF

An Isolated Power System Based on Variable Speed Engine Generator with Super-capacitor (슈퍼캐패시터와 가변속 엔진발전기를 이용한 독립형 전원 시스템)

  • Lee, Joon-Hwan;Lee, Seung-Hwan;Sul, Seung-Ki
    • Proceedings of the KIPE Conference
    • /
    • 2007.11a
    • /
    • pp.15-17
    • /
    • 2007
  • The variable speed engine generator set is interested for an isolated power system due to reduced fuel consumption and less emission. However, because of sluggish dynamic behavior of the internal combustion engine the power quality would be degraded during the sudden load power surge, where the power required by the load is not available by the engine due to the reduced engine speed. An isolated power system based on variable speed engine with a super-capacitor bank improves dynamic characteristics under sudden load change, and power quality, fuel consumption, and pollutants can be reduced remarkably. Also, it is verified by the computer simulation that the inverter of 3phase-4leg is compatible to the isolated power system with unbalanced load. In this paper, the feasibility of the system has been verified based on a 26kw commercial diesel engine system.

  • PDF

A Analysis of DC Control Circuit Transient and a Study of Auxiliary Relay Design Compatability in the Power Plant (발전소 직류 제어회로 과도현상 분석 및 보조계전기 선정 적합성 검토)

  • Seon, Hyun-Gyu;Hong, Young-Hee
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.1948_1949
    • /
    • 2009
  • All the power generating station require dc auxiliary power systems to operate those dc components that must be available if a loss of ac power occur. Some examples of such components are auxiliary motors, circuit breakers, relays and solenoids. The dc source may be one common battery for both power and control or two separate batteries; one for power and another for control. Typically, a dc auxiliary power system is designed as an ungrounded system, instead of grounded system, so that a low-resistance ground fault on one of its two polarities will not affect the operation of the system, thus increasing system reliability and continuity of service. A ground detector should provide a high polarity-to-ground resistance so that a single ground fault occurring on the system will not affect the operation of that system. Sensitive relays have been known to energize momentarily while the cable and capacitive charge to ground shifts[1]. A power station had experienced this kind of incident and performed root cause analysis based on PC based simulation program known as PSpice. This simulation showed adapted relays on the system energize momentarily and design criteria on this relay should be corrected.

  • PDF

Short-Term Forecasting of Monthly Maximum Electric Power Loads Using a Winters' Multiplicative Seasonal Model (Winters' Multiplicative Seasonal Model에 의한 월 최대 전력부하의 단기예측)

  • Yang, Moonhee;Lim, Sanggyu
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.28 no.1
    • /
    • pp.63-75
    • /
    • 2002
  • To improve the efficiency of the electric power generation, monthly maximum electric power consumptions for a next one year should be forecasted in advance and used as the fundamental input to the yearly electric power-generating master plan, which has a greatly influence upon relevant sub-plans successively. In this paper, we analyze the past 22-year hourly maximum electric load data available from KEPCO(Korea Electric Power Corporation) and select necessary data from the raw data for our model in order to reflect more recent trends and seasonal components, which hopefully result in a better forecasting model in terms of forecasted errors. After analyzing the selected data, we recommend to KEPCO the Winters' multiplicative model with decomposition and exponential smoothing technique among many candidate forecasting models and provide forecasts for the electric power consumptions and their 95% confidence intervals up to December of 1999. It turns out that the relative errors of our forecasts over the twelve actual load data are ranged between 0.1% and 6.6% and that the average relative error is only 3.3%. These results indicate that our model, which was accepted as the first statistical forecasting model for monthly maximum power consumption, is very suitable to KEPCO.

Component Replacement Ordering Evaluation for Proper Reliability Maintenance in Power Distribution System (배전계통 적정 신뢰도 유지를 위한 설비교체 순위 평가)

  • Lee, Hee-Tae;Kim, Jae-Chul;Moon, Jong-Fil;Chu, Cheol-Min
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.48-50
    • /
    • 2005
  • New environment change of electric power system focused in consumer's energy supply and demand. But electric power reliability preservation and reliability improvement countermeasure also need for long-term. It is need that change equipments that is composing electric power system in well-timed time and by maintaining, prevent breakdown beforehand and prevent consumer's power interruption by equipment fail. However, as only quantitative estimation is available by reliability estimation method that is presented in existing, it is no to use in dictionary fault prevention. Therefore, applied optimum reliability preservation through existent equipment fault data analysis of electric power system in equipment replace side, and this when maintain equipment replace of electric power system for reliability preservation using responsiveness analysis to base ordering evaluate. In existing about main equipment plain that this paper is power system the valued failure rate use this by score and precedence of electric power system equipment for replace of system considered expense.

  • PDF

The Power Quality about Wind/Diesel combined power generation in isolated area (고립지역의 풍력/디젤 복합발전 전력품질 특성)

  • Ko, Seok-Whan;Kim, Seok-Woo;Lee, Youn-Seop
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2009.04a
    • /
    • pp.245-249
    • /
    • 2009
  • Antarctic King Sejong Station was established in King George Island, the South Pole in 1988, and has been executing the monitoring studies on the change of antarctic natural environment. As an available power, the wind energy generator has been used in the form of hybrid with mainly diesel generator. Because the wind generation power sharply changes by wind energy, it must be careful during the system operation. When the power system becomes stable, the output performance of wind energy generator becomes stable. But, in case of unstable system, the errors frequently occur on the wind energy generator and it badly impacts the power system by output of wind energy generator. The purpose of this paper is to analyze suitability while operating the system of 10kW wind energy generator at Antarctic King Sejong Station, an isolated area, and to analyze the problem and improvements by power quality.

  • PDF

A Study on the Introduction of Superconducting Cable in Korean Power System (초전도 케이블 계통 적용을 위한 계통 구성 방안 및 적용 대상 고찰)

  • 김종율;윤재영;이승렬
    • Progress in Superconductivity and Cryogenics
    • /
    • v.5 no.2
    • /
    • pp.8-15
    • /
    • 2003
  • Nowadays, As power demand increases gradually, the call for underground transmission system increases. But it is very difficult and high in cost to construct new ducts and/or tunnels for power cables in metropolitan areas. HTS cable has the several useful characteristics such as increased power density, stronger magnetic fields and/or reduced losses. Therefore HTS cable can allow more power to be moved in existing ducts, which means very large economical and environmental benefits. In this paper, we investigate the status of korean power system and underground transmission system. Based on this, the feasibility study on applying HTS cable to korean power system is carried out and then we propose the new power system configuration of metropolitan area with HTS cable. Finally, we can get a conclusion that applying HTS cable to 154kV underground transmission line in metropolitan area such as seoul is very available. In addition, detail applicable cases are investigated; a)replace old conventional cable with HTS cable; b) apply HTS cable to constructing new underground transmission line; c)use HTS cable to resolve overload problem in conventional power system configuration.

Sensitivity Analysis of the Power System Considering the Load Power Factor While using Direct Load Control (부하 역률을 고려한 직접부하제어 실행시 계통의 민감도 분석)

  • Choo, Sung-Ho;Lee, Joo-Won;Chae, Myung-Suk;Park, Jong-Bae;Shin, Joong-Rin
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.235-236
    • /
    • 2008
  • Recently, the power load is growing larger and because of the environmental limitation of generation, the expansion of generation facilities are becoming more difficult. For that reason the importance of the demand-side resources come to be higher. One method of the demand-side resource, the DLC Program, has executed, and moreover, the loads which are available to be controlled are increasing. It should be considered of some kinds of power system components such as DLCs, because the fact that using the demand resources will be an important part of the power system. This paper considers the power factor of the load-bus which is shedded in the direct load control program. and then analyze the power system using flow sensitivity and voltage sensitivity. In this paper, we assumed two scenarios through the rank of the load power factor at each bus and to compare and evaluate each case, we used Power World for the simulation.

  • PDF

Reliability Evaluation of Power system considering Wind Turbine Generators and Multi-Energy Storage System In JeJu Island (풍력발전원과 다개 ESS를 고려한 제주도 계통에서의 신뢰도 평가)

  • Oh, Ungjin;Lim, Jintaek;Lee, Yeonchan;Phuong, Do Nguyen Duy;Choi, Jaeseok;Yoon, Yongbeum;Chang, Byunghoon;Cho, Sungmin
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.473-474
    • /
    • 2015
  • This paper proposes probabilistic reliability evaluation model of power system considering Wind Turbine Generator(WTG) integrated with Energy Storage System(ESS). Monte carlo sample state duration simulation method is used for the evaluation. The power output from WTG units usually fluctuates randomly. Therefore, the power cannot be counted on to continuously satisfy the system load. Although the power output at any time is not controllable, the power output can be utilized when needed if ESS is available. The ESS may make to smooth the fluctuation of the WTG power output. The detail process of power system reliability evaluation considering Multi-ESS cooperated WTG is presented using case study of Jeju island power system in the paper.

  • PDF

Performance Evaluation of Vertical Wind Power Generation System Structured on the Downtown Buildings Roof (도심 빌딩 옥상에 적용 가능한 풍력발전시스템의 성능 평가 연구)

  • Nah, Chae-Moon;Chung, Kwang-Seop;Kim, Young-Il;Kim, Dong-Hyeok
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.12 no.3
    • /
    • pp.9-16
    • /
    • 2016
  • This study had the purpose on feasibility judgment through performance forecast of wind power generation system using the cross flow vertical type wind power turbine for the situation of domestic small size wind power technology development. Wind power generation system uses the principle of venturi tube that gathers the wind through the first guide vane, and second guide vein changes the angle of the wind simultaneously by playing the role of venturi tube. After this, wind got out from the second guide vane spins the wind power turbine and has the meaning of judging on the aspect of numerical interpretation the feasibility for the small size wind power generation through wind power generation system that comes out from the back.