Automatic Operation based on ATO (Automatic Train Operation) is necessary for driverless Light Rail Transit business. When this kind of driverless LRT operation plan is made, TPS (Train Performance Simulation) is traditionally simulated at all-out mode and coasting mode based on manual operation. Commercial schedule speed equals to all-out speed minus $9{\sim}15%$ make-up margin. Coasting mode TPS simulation is also run at commercial schedule speed to calculate run time and energy consumption. But TPS based on manual operation should make an improvement on accuracy in case of driverless LRT operation Plan. In this paper, new fast mode TPS simulation using ATO pattern is proposed and show near actual ATO result. The actual ATO pattern can be accurately simulated with the introduction of 4 parameters such as commercial braking rate, jerk, station stop profile and grade converted distance. Normal mode TPS simulation for commercial schedule speed can be designed to have fast mode trip time plus 3 seconds/km margin recommended by korean standard LRT specification.
Journal of the Korea Academia-Industrial cooperation Society
/
v.10
no.2
/
pp.256-263
/
2009
KORAIL carries out an improvement project of railway signaling system for the conventional line from the existing method which permits a train to move within limited speed the ground signal of ATS(Automatic Train Stop) system. The proposed system makes possible that a train can be driven using a speed profile created by onboard signaling system(ATP) with the movement authority from ground balise. A driving test over 100,000km is being executed by developing a tilting train for the speed elevation on the conventional line. And, the introduction of the tilting train by ATP system to the Jung-ang line is expected. However, a speed elevation on a curved line section has a restriction. Therefore, research on safety braking model and train separation control technology for the localization of ATP system is required preferentially. In this paper, we presented a safety braking model of ATP system and a train separation control method that use ground balise as variable information provider, and executed a performance simulation.
Journal of the Korea Academia-Industrial cooperation Society
/
v.11
no.7
/
pp.2534-2540
/
2010
In this paper we propose contents and results on installation and commissioning test for ATP on-board unit, which has propelled as one of the research projects, so called, "Reliability assessment and operation technology development for Korean-type tilting trains" in order to ensure the safety and operation efficiency of tilting trains. In KRRI, we have developed tilting trains for the speed-up of existing lines and for the passenger service improvement where the KTX is not available. And we also make progress the operation trial test at the speed of 10km with the use of ATS units, used in existing lines, for the purpose of the reliability assessment of the developed tilting trains. In MLTM, they have decided to accelerate the speed at more than 200km/h for the 7 existing lines including Jungang-line and Chungbuk-line where KTX has not operated. According to this decision, Train control system is to be changed from ATS to ATP. We should install an ATP on-board unit in tilting trains and verify the operational suitability. Therefore, we have installed and tested the same ATP on-board unit on tilting trains that used in the ATP construction project on Gyeongbu-line and Honam-line.
With the growing traffic density and increasing comfort requirements, the automation of the drive train has gained importance in vehicles. The automatic clutch actuation relieves a driver especially in urban and stop-and-go traffic environments. In this paper, an electro-mechanical actuator for clutch-by-wire (CBW) system is implemented as the first stage for the development of automated manual transmissions. The prototype of the automatic clutch actuator is designed systematically, which is composed of the electric motor, worm and worm wheel, and crank mechanism. A test rig is developed to perform the basic function test for the automatic clutch actuation. The developed prototype is validated by the experimental results performed on the test rig.
Proceedings of the Korean Institute of Intelligent Systems Conference
/
1998.10a
/
pp.211-217
/
1998
Many practical control problems for the complex, uncertain or large-scale plants, need to simultaneously achieve a number of objectives, which may conflict or compete with each other. If the conventional optimization methods are applied to solve these control problems, the solution process may be time-consuming and the resulting solution would ofter lose its original meaning of optimality. Nevertheless, the human operators usually performs satisfactory results based on their qualitative and heuristic knowledge. In this paper, we investigate the control strategies of the human operators, and propose a fuzzy model-based multi-objective satisfactory controller. We also apply it to the automatic train operation(ATO) system for the magnetically levitated vehicles(MAGLEV). One of the human operator's strategies is to predict the control result in order to find the meaningful solution. In this paper, Takagi-Sugeno fuzzy model is used to simulated the prediction procedure. Another str tegy is to evaluate the multiple objectives with respect to their own standards. To realize this strategy, we propose the concept of a satisfactory solution and a satisfactory control scheme. The MAGLEV train is a typical example of the uncertain, complex and large-scale plants. Moreover, the ATO system has to satisfy multiple objectives, such as seed pattern tracking, stop gap accuracy, safety and riding comfort. In this paper, the speed pattern tracking controller and the automatic stop controller of the ATO system is designed based on the proposed control scheme. The effectiveness of the ATO system based on the proposed scheme is shown by the experiments with a rotary test bed and a real MAGLEV train.
Kim, Min-Kyu;Cha, Gi-Ho;Kim, Min-Seok;Lee, Jong-Woo
Journal of the Korean Society for Railway
/
v.15
no.1
/
pp.42-47
/
2012
There are ATC (Automatic Train Control), ATP (Automatic Train Protection), ATS (Automatic Train Stop) and ATO (Automatic Train Operation) etc. in train control systems. As various train control systems are installed according to sections, on-board signaling systems are installed to apply to the section. Hence, operation flexibility of trains is decreased. In other words, when trains are operated in the section where other train control systems are used, the on-board signaling systems are changed. Recently, a study on the combined on-board signaling system has been researched to solve this problem. The combined on-board signaling system consists of ATC, ATP and ATS device. Because the train control systems are vital, it needs to design the combined on-board signaling system by using k out of n system. In this paper, when k out of n system is applied in the combined on-board signaling system, the reliability and loss cost are analyzed by using failure rate in each device. Hence, the ideal number of systems is presented according to the number of outputs.
1974. 8. 15 SeoulMetro, beginning with the first electric railway established at six cities, so it is managing mass transportation of traffic. Especially, in case of seoul, It is managing that from one to eight lines, 286.9km, 265 stations have installed and now it is carrying about 5.5million of passengers everyday, and 2,000million passengers a year. So accident is increasing from the station every year. For this measure, SeoulMetro prepares safety fence for passengers crash but, as suicides or people who watch the accident took place, for at the bottom of passengers crash protection, PSD installing is needed. Even though, PSD is managing ATO section but, in controlling SeoulMetro, one to four lines sections are (ATS, ATC)section. Between as ATS, ATC section, ATO section, subway gate and PSD must have opened and crossed always at the time. And the interlock control corrosion protection gate, managing skills with installation, method, using in history, apply to 10rail cars one train sets, and maximum applying 2224% sections of passengers congested that consideration is to be needed. So 2004, SeoulMetro improved technology and basie design of PSD at ATS section. Based on this, from 2005.4 to 2006.6, using subway 2lines per 12stations set the model installation(full type 11stations, half type 1station) After installing in case of success, it is going about to suggest that effective analysis and hereafter subject.
With the growing traffic density and increasing comfort requirements, the automation of the drive train will gain importance in vehicles. The automatic clutch actuation relieves the drivers especially in urban driving and stop-and-go traffic conditions. In this paper, an electro-mechanical actuator for clutch-by-wire (CBW) system is implemented as the first stage for the development of automated manual transmissions. The prototype of CBW actuator is designed systematically, which is composed of the electric motor, worm & worm wheel and crank mechanism. And the test rig is developed to perform the basic function test for the automatic clutch actuation. The developed prototype is validated by the experimental results on the test rig.
For safety reason ATS(Automatic Train Stop) system is being used, which is a kind of communication system with a feedback amplifier and a transformer on the train and wayside coils. The coils are highly resonant LC circuits, also have very high Q(Quality) factors. The Q factors of wayside ATS coils are to be maintained high enough for the amplifier to operate reliably. In this paper a novel Q measurement system is proposed. The system measures the resonant frequency and the bandwidth of the ATS coils, by controlling the phase difference between the transformer and the coil using digital PLL(Phase Locked Loop). The overall configuration and algorithms of the proposed system and the digital PLL control schemes are presented in details. The experimental waveforms are shown to verify the system performances.
The Transactions of The Korean Institute of Electrical Engineers
/
v.61
no.3
/
pp.384-393
/
2012
Railroad signaling systems perform controlling the distance and routes between trains. Signaling methods on the wayside are to control passively the train speed by using signal flags which are installed on the wayside. ATS(Automatic Train Stop) device is used as the signaling method on the wayside in Korea. The ATS device is assistance equipment of engineers. Signal information is transmitted by combining mutual inductance between the wayside transmitter and on-board receiver. The wayside transmitter performs changing oscillation frequency according to the signal information. The on-board receiver performs controlling the train by receiving the frequency. Currently, the oscillation frequency on the on-board receiver is 78[kHz] in case of normal state. When the on-board receiver is over the wayside transmitter, the oscillation frequency is changed by capacitors of the wayside transmitter according to signal flags. In case of changing the oscillation frequency, the waveform is modified in the wayside transmitter and on-board receiver. This phenomenon is that other signals or communication frequency are included. In this paper, electric model between the wayside transmitter and on-board receiver is suggested and frequency response in the wayside transmitter and on-board receiver including other signals is estimated by the coupling coefficient. Also, the value of coupling coefficient is proposed to exclude other signals and demonstrated by using Matlab and PSpice program.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.