• Title/Summary/Keyword: assessment factors

Search Result 4,504, Processing Time 0.031 seconds

Developing the Ecological Performance Standard for Replaced Wetlands by Analyzing Reference Wetlands (표준습지 분석을 통한 대체습지의 생태 성능 기준 개발)

  • Koo, Bon-Hak;Jeong, Jin-Yong;Park, Mi-Ok
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.14 no.1
    • /
    • pp.11-22
    • /
    • 2011
  • This study was established to build and suggest the Ecological Performance Standards for replaced wetlands as the mitigation strategies for the construction projects. The request performance and assessment factors and standards were derived by bibliographic review and verified by the field survey for the reference wetlands. And the weights for each factor were derived by AHP(Analytical Hierarchy Process) method. The results are as follows : 1) Assessment factors were induced by in-depth research of many wetland assessment models and benchmarks evaluated ecological functions. This study proposed final 12 assessment factors through ecological specialist and experts interviews added with literature analysis. 2) 10 natural wetlands were selected as Reference Wetlands as the measure to propose assessment factors and assessment criteria. Those reference wetlands are well-conserved inland natural wetlands classified to the one having worthy to conserve (grade "high") according to RAM(Rapid Assessment Method). Reference wetlands chosen by the study are Parksilji, Jeongyangji, Mulkubi, Bawineupkubi, Jilnalneup, Jinchonneup, Doomoso, Haepyung wetland, Whangjeong wetland, and Whapo wetland. The research developed assessment criteria for the performance assessment factors based on several explorations of the reference wetlands. 3) "Requiring performance" of replaced wetlands is defined as "to carry out similar or same ecological functions provided by natural wetlands", in overall. The detailed requiring performances are as follows; ${\bullet}$ to play a role of wildlife habitats ${\bullet}$ to have biological diversity ${\bullet}$ to connect with other ecosystems ${\bullet}$ to provide water environment to perform good ecological functions 4) The assessment factors for required performance are categorized by wildlife habitat function, biological diversity, connectivity of adjacent ecosystem, and water environment. Wildlife habitat category is consisted of wildlife habitat creation, size of replacement wetland, and site suitability. Biological diversity category contains the number of plant species, the number of wildlife species, and number of protected species as the sub-factors. Connectivity of adjacent ecosystem is comprised of wildlife corridor, green network and distance from other ecosystem. Finally, water environment make up with water quality, depth of water body, and shape of waterfront. 5) Finally, every assessment factors were verified and weighted by the AHP methods and the final standards were proposed. The weights of factors of requiring performance suggested as habitat (0.280), connectivity (0.261), diversity (0.260), hydraulic environment (0.199). And those of detailed sub-factors are site suitability (0.118), protected species (0.096), distance to neighbor ecosystem (0.093), habitat creating (0.091), green corridor (0.090) etc.

Environmental Assessment Index Development (환경평가지표의 개발)

  • Choi, D.I.;Chang, C.K.;Kim, M.J.;Lee, J.W.
    • Journal of Environmental Impact Assessment
    • /
    • v.1 no.1
    • /
    • pp.31-40
    • /
    • 1992
  • As the environmental concerns in Korea have shifted gradually from the environmental pollutions to the quality of life (QOL) enhancement, it has become increasingly important to implement comprehensive assessment of environmental quality as possible. This is the major reason to develop Environmental Assessment Index. This study focuses on indices development of factors in Environmental Impact Statement Preparation Regulation. Environment in this regulation is composed of natural environment, life environment and socio-economic environment, and it is composed of 22 factors. EAI(Environmental Assessment Index)studied in this research is integrated by 16 factors. It will contribute to public participation in Environmental Impact Assessment process and environmental policy.

  • PDF

INFLUENCE FACTOR-BASED RISK ASSESSMENT METHODOLOGY FOR CONSTRUCITON

  • Hyunsoo Kim;Hyunsoo Lee;Moonseo Park;Kwang-pyo Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1231-1236
    • /
    • 2009
  • Many work-related risk factors can cause construction site hazards. Therefore, safety management begins with measuring the magnitude of risk involved in a project. This study proposes a methodology for risk assessment of major trades at a particular construction site. To assess risk, this methodology integrates hazard severity and frequency, and their magnitude is calculated based on actual work-site hazards. This methodology also considers the influence factors that affect the frequency of work-related hazards. To select the appropriate influence factors, a two step approach is deployed. First, the predominant factors are identified through a literature review. Second, a selective process filters out the influence factors that are difficult to analyze quantitatively, and these extracted factors are weighted using expert surveys. Finally, the factors are combined and a quantitative risk assessment methodology is proposed.

  • PDF

A Case Study on the Establishment of Assessment Standards for the Site Selection of Waste Treatment Facility (폐기물 처리시설 입지선정 평가기준 설정에 관한 사례연구)

  • Jung, Jong-Gwan;Jang, Won
    • Journal of Environmental Impact Assessment
    • /
    • v.6 no.2
    • /
    • pp.137-152
    • /
    • 1997
  • The siting process of municipal solid waste treatment facility consists of a structured set of policies that guide the implementation of waste management goals. The main problems of siting process are the social and political context or the community opposition. During the past, the traditional siting process has been obsolete in most pans of the country, so public officials and researchers have tried to experiment with new policies and procedures. A number of controversial issues offer insight into the factors that are related to the local residents opposition to new waste treatment facilities. The purpose of this case study focused on the establishment of criteria in the site selection of waste treatment facilities which can carry out resources recovery. incineration and landfill simultaneously. That is to say. the main points are to make concrete the quantification standards of assignment and take an objective allotment scale according to the assessment factors. The summarized results are as follows; 1. To promote the site selection based on the guideline such as rational. objective and due process of law, it is desirable to inform the local residents the methods of assessment in advance. 2. Totally 20 factors for the site selection are divided into 3 categories such as living environment characteristics, technological location characteristics and socio-economic factors. And the supposed magnitude of weight in all items are equally applied. 3. In regard to 20 assessment factors, the allotment of point is distributed by the specific location characteristics. Namely to make the assessment easily, each factors are set the scale from 1 to 5 points en masse along the data which are acquired in the region.

  • PDF

Assessment System of Safety Level of High Voltage Electrical Facilities Considering Environmental Factors (환경영향 요소를 고려한 특고압 전기설비의 안전등급 평가시스템)

  • Kim, Dong-Woo;Lim, Young-Bea;Lee, Ki-Yeon;Moon, Hyun-Wook
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.1
    • /
    • pp.249-254
    • /
    • 2017
  • This paper presents an assessment system of safety level of 22.9kV grade high voltage electrical facilities considering environmental factors. The assessment system was developed based on the following procedure. Firstly, assessment structure was determined by consulting standards regarding inspection and diagnosis of electrical facilities. Secondly, contents of items and sub items of assessment system were developed. Thirdly, in order to quantify the importance of the assessment system, the weight was calculated using Analytic Hierarchy Process(AHP). Lastly, assessment table of safety level was developed including environmental factors such as period of use and load factor. The developed system can evaluate the safety level of high voltage facilities in an objective way. Therefore it can be applicable to electrical safety management system based on Internet of Things(IoT).

The Application of Safety Impact Assessment to Tunnel Construction (터널공사에서의 안전영향평가의 적용)

  • Kim, Byung-Sik;Choi, Bong-Joon;Seo, Jong-Won
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.545-548
    • /
    • 2008
  • In this study, the concept of safety impact assessment to achieve 'Design-for-Safety' in design phase is introduced. For this purpose, safety impact assessment model was devised and a methodology using the risk-based safety impact assessment approach for NATM of tunnel projects is suggested. The suggested methodology includes safety information survey, classification of safety impact factors caused by design and construction, and quantitative estimation of magnitude and frequency of safety impact factors. A real-world case study on the safety impact assessment of a tunnel construction project is also provided in the paper.

  • PDF

Dynamic Sustainability Assessment of Road Projects

  • Kaira, Sneha;Mohamed, Sherif;Rahman, Anisur
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.493-502
    • /
    • 2020
  • Traditionally, road projects are initiated based on an assessment of their economic benefit, after which the environmental, social and governance effects are addressed discretely for the project according to a set of predetermined alternatives. Sustainable road infrastructure planning is vital as issues like diminishing access to road construction supplies, water scarcity, Greenhouse Gas emissions, road-related fatalities and congestion pricing etc., have imposed severe economic, social, and environmental damages to the society. In the process of addressing these sustainability factors in the operational phase of the project, the dynamics of these factors are generally ignored. This paper argues that effective delivery of sustainable roads should consider such dynamics and highlights how different aspects of sustainability have the potential to affect project sustainability. The paper initially presents the different sustainability-assessment tools that have been developed to determine the sustainability performance of road projects and discuss the inability of these tools to model the interrelationships among sustainability-related factors. The paper then argues the need for a new assessment framework that facilitates modelling these dynamics at the macro-level (system level) and helping policymakers for sustainable infrastructure planning through evaluating regulatory policies.

  • PDF

An Improvement of Evaluation Items for a Subjective Workload Assessment in Nuclear Power Plants (원자력발전소의 주관적 업무량 평가를 위한 평가 항목 개선)

  • Park, Jae-kyu;Lee, Yong-Hee
    • Journal of the Ergonomics Society of Korea
    • /
    • v.29 no.4
    • /
    • pp.687-691
    • /
    • 2010
  • Workload assessment is one of the important elements of the human factors evaluation for the nuclear power plants in operation. This paper describes a further study upon the additional elements of the workload which elements should be considered in the subjective workload assessment. We have tried to predict the burden of the work and to improve the work through a comparison of the objective workload and the subjective workload in the previous studies in nuclear power plants. However, there is a restriction to perform a precise assessment because of the limitations of the method itself. The objective workload assessment is performed by relative comparison using the quadrant analysis with objective workload and subjective workload because there were no clear criteria of objective workload assessment. And the subjective workload assessment is performed by NASA-TLX (NASA Task Load Index) which includes six evaluation dimensions of subjective workload. NASA-TLX is difficult to grasp the other aspects that could influence on the subjective workload because the analysis relies on predetermined assessment items. We conduct a factor analysis between the factors that affect the workload and the assessment adopted from ISO 10075 and NASA-TLX. At the same time, this study suggests other evaluation elements which can be added for subjective workload assessment except for evaluation elements of NASA-TLX.

Assessment of Stream Naturalness Considering Physical, Biological, and Chemical Factors (물리·생물·화학인자를 고려한 하천자연도 평가 : 목감천 하류 구간을 대상으로)

  • Kang, Won-Gu;Chung, Eun-Sung;Lee, Kil Seong
    • Journal of Korean Society on Water Environment
    • /
    • v.27 no.2
    • /
    • pp.218-227
    • /
    • 2011
  • The objective approach for assessment of stream naturalness is an essential part of the stream restoration project. This study proposes the methodology for the assessment of stream naturalness considering physical, biological and chemical factors. Physical factors consists of riffle and pool, river bed material, bank protection, floodplain vegetation and levee materials; biological factors are benthic macroinvertebrate, KSI (Korean Saprobic Index), and IBI (Index of Biological Integrity) and chemical factors are pH, DO (dissolved oxygen), and TP (total phosphorus). This procedure is applied to the Mokgamcheon. As a result, the downstream of Mokgamcheon (zone I) needs the prompt improvement of stream naturalness, compared to the others (zone II and III). This evaluation technique will be an effective tool to quantify the stream naturalness and can be used to set the target of stream restoration project.

Development of a Workload Assessment Model for Overhead Crane Operation (천장 크레인 운전 작업부하 평가모델 개발)

  • Kwon, O-Chae;Lee, Sang-Ki;Cho, Young-Seok;Park, Jung-Chul;Jung, Ki-Hyo;You, Hee-Cheon;Han, Sung-H.
    • Journal of the Ergonomics Society of Korea
    • /
    • v.26 no.2
    • /
    • pp.45-59
    • /
    • 2007
  • The operating tasks of overhead crane have caused undue stress to the operators from physical, mental, and environmental workload. Existing workload assessment models for musculoskeletal disorders such as OWAS, RULA, and QEC have limited applicability to the crane operating tasks because they focus mainly on physical factors and do not consider the relative importance of each factor. The present study was to develop a workload assessment model customized to overhead crane operation, following a systematic process: (1) analyzing task characteristics, (2) selecting workload factors, (3) developing assessment methods, (4) establishing action levels, and (5) computerizing the assessment model. Based on literature review, worksite survey, and focus group interview, 4 physical factors (awkward posture, static posture, repetitive motion, and excessive force), 6 mental factors (visual demand, auditory demand, task complexity and difficulty, time urgency, work schedule related stress, and safety related stress), and 4 environmental factors (noise, vibration, dust, and temperature) were selected and their rating scales and relative weights were determined. Then, based on the workload assessment results of 8 overhead cranes operated at different workplaces, the action levels of each factor category were established. Finally, the crane operation assessment model was computerized for effective analysis and report preparation. The present approach is applicable to develop a customized workload assessment model for an operating task under consideration.