• Title/Summary/Keyword: asbestos dismantling

Search Result 11, Processing Time 0.023 seconds

A Study on the Impact of Participating Companies Related to Asbestos Dismantling on the Safety of Residents Near Asbestos Dismantling Worksites (석면해체 참여업체가 작업장 인근 주민 안전에 미치는 영향에 관한 연구)

  • Youm, Hie Sang;Park, Jong Young;Lee, Duck Hee
    • Journal of the Society of Disaster Information
    • /
    • v.17 no.3
    • /
    • pp.579-588
    • /
    • 2021
  • Purpose: The purpose of this study is to analyze how the participating companies related to asbestos dismantling affect the safety of residents near asbestos dismantling worksites, and to present important criteria for selecting asbestos dismantling related companies based on the analysis results. Method: In this study, based on the Occupational Safety and Health Act and the Asbestos Safety Management Act, important items about participating companies related to asbestos dismantling and the safety of residents near the asbestos dismantling workshop were derived, and then questionnaire items were determined through FGI. Multiple regression analysis was performed to analyze the influence relationship. Result: In order to secure the safety around the asbestos dismantling site, it was confirmed that the ability of asbestos dismantling supervisors among the participating companies (dismantling companies, investigation agencies, and supervisors) had the greatest influence. Conclusion: It showed that it is essential to select an excellent asbestos dismantling supervisor and an excellent asbestos dismantling and removal company in order to ensure the safety of residents near the asbestos dismantling site.

A Model for Optimization Process of Asbestos Dismantling Work Using Simulation (시뮬레이션을 이용한 석면 해체공사의 최적화 공정계획 모델)

  • Cho, Hyeong-Jun;Noh, Jae-Yun;Lee, Ho-Hyeon;Lee, Su-Min;Han, Seung-woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.17-18
    • /
    • 2022
  • In Korea, asbestos removal has been actively carried out nationwide since 2015 when asbestos was completely banned as a first-class carcinogen. Since scattering dust generated in the process of removing asbestos causes fatal diseases such as asbestos lung disease and lung cancer, concerns are growing over the safety of construction workers and building users undergoing dismantling. For this reason, regulations on asbestos sites have been strengthened and prior studies on safety and risk assessment have been conducted, but research on actual site data collection and process planning is insufficient even though safety is reduced due to delay in site construction period. Therefore, it is necessary to analyze the work and delay factors of the asbestos dismantling process and develop an optimized process plan model for workers. This study is an initial step to develop an optimized process plan model that considers the safety and productivity of asbestos dismantling work, and aims to help establish an optimized process plan for asbestos dismantling process using website clone simulation.

  • PDF

Development of Cost Estimation Model Considering Process Risk for Asbestos Dismantling Work (석면해체 공사의 공정 리스크를 고려한 비용 산정 모델 개발 )

  • Noh, Jae-Yun;Lee, Su-Min;Han, Seung-woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.49-50
    • /
    • 2023
  • Asbestos is a building material that has been actively used because of its excellent durability and heat resistance until 2009, when it was found to be a first-class carcinogen and prohibited in Korea. Currently, asbestos dismantling is an essential process in demolition of old buildings. Workers are likely to be exposed to asbestos in the process of dismantling and removing them, which causes various occupational diseases, suggesting related laws and work standards to ensure the safety of asbestos dismantling process. Accordingly, prior studies have been conducted to analyze the level of asbestos exposure and influencing factors occurring during work, but most of them are mainly concerning health issue while research on process risks considering field characteristics and safety aspects of the work processes is still insufficient. Therefore, this study aims to derive the process risks affecting the safety of workers based on the survey results of asbestos dismantling companies, and further proposed a cost calculation model taking those risks into account.

  • PDF

Development of Process Planning Model for Asbsestos Dismantling Work Based on Performance Risk (석면해체 공사의 작업 위험성 기반 공정 계획 모델 개발)

  • Lee, Su-Min;Noh, Jae-Yun;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.71-72
    • /
    • 2023
  • Asbestos is a durable and heat-resistant building material used in various building materials such as slate, ceiling tex, and spray paint. It has been banned since 2009 after found to be a first-class carcinogen that causes various cancers and asbestos lung disease. Since workers are likely to be exposed to asbestos in the process of dismantling and removal of asbestos-made building materials and facilities, laws and work standards are proposed by the Ministry of Employment and Labor to ensure the safety of asbestos dismantling work. In addition, prior studies on exposure levels and analysis methods have been conducted in this regard mainly for residents. However, the relation between the results of the risk assessment of the process conducted during the asbestos investigation and the work is still ambiguous for the safety of workers. Therefore, this study proposes a process model development methodology that considers work risk based on the results of a survey from asbestos dismantling companies.

  • PDF

A Study on the Distribution Maps for Asbestos Cement Slates Using GIS (GIS를 이용한 석면슬레이트 분포지도 작성)

  • Kim, Young-Chan;Son, Byeung-Hun;Kim, Hye-Mi;Hong, Won-Hwa
    • KIEAE Journal
    • /
    • v.11 no.3
    • /
    • pp.57-62
    • /
    • 2011
  • Asbestos have been used around the world because of reliable and cost-effective physicochemical characteristics. After incubation period about 15-40 years asbestos can cause various cancers, including malignant mesothelioma when inhaled into the air. These properties turned out, asbestos have been banned from using in developed countries. Also in Korea also, the use of asbestos was banned across the board by revision of Industry Safety and Health Act in February 2009. Therefore, the problem of asbestos is not when using. It is about dismantling, maintenance, and the final processing of asbestos waste. Asbestos Cement slates which is Widely distributed throughout the country as roofing materials has much scattering potential compare with inside materials. Also Ministry of Environment is planning to introduce legislation 'Asbestos Safety Management Act' through Environment Announcement and The same Act. 24 show as follows. Minister of Environment or governor should do survey on the actual condition targeting rural buildings with slates and partly or fully fund to dissolve, remove asbestos slate which was used in each buildings. Therefore, to solve these problems, database-building and necessity of management strategies have been continually arisen. So this study was performed. Its application value is very high in terms of its political, economic. Asbestos Cement Slates database could build to collect national registered building data and then using GIS, asbestos cement Slates distribution map were constructed in each province's cities and counties of the country. And this map by Application, construction was to visualize by application, construction of year. Through these results, information of Asbestos Cement Slates could visually inform to policy makers, asbestos dismantling and management contractor, and civilian and it would alleviate the gap of knowledge information. This is expected to be utilized by medium and long-term and effective plan for demolition and dismantling of asbestos cement Slates.

Ship Repair Workers' Exposure to Asbestos by a Systematic Review in Korea (문헌 조사를 통한 국내 선박 수리 작업자들의 석면 노출 특성 분석)

  • Choi, Sang-Jun;Kwon, Hyo-Jung;Gwak, Su-Gyeong
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.3
    • /
    • pp.135-141
    • /
    • 2012
  • This study was conducted to evaluate the characteristics of exposure to asbestos for ship repair workers in Korea by a systematic review. The number of articles studying asbestos exposure levels from ship repair workplaces was found to be 4. All asbestos concentration reported as either geometric mean and geometric standard deviation or ranges were transformed to arithmetic mean to estimate exposure level. In addition, weighted arithmetic means(WAMs) were calculated by weighing of the different number of samples. The WAM concentrations were 2.746 f/cc during asbestos dismantling work, 0.034 f/cc before asbestos dismantling work and 0.065 f/cc after working respectively. The maximum airborne concentration of asbestos during asbestos removal work was 7.02 f/cc which was 70 times higher than the occupational exposure limit of Korea, 0.1 f/cc. This study recommends that retrospective exposure to asbestos based on various ship types and operations should be assessed.

A Study on the Distribution of the Asbestos Cement Slates and Calculation of Disposal Cost in the Rural Area

  • Kim, Young-Chan;Son, Byeung-Hun;Park, Wha-Me;Hong, Won-Hwa
    • Architectural research
    • /
    • v.13 no.2
    • /
    • pp.31-40
    • /
    • 2011
  • Asbestos have been used around the world by physical and chemical characteristics that are a reliable and cost-effective. But asbestos, once called the miracle of mineral, is now a quiet time bomb. Asbestos hazards have been studied and the government has pursued 'Comprehensive Measures for Asbestos Management' jointly with related departments. As a part of plan, Ministry of Environment is to introduce legislation 'Asbestos Safety Management Act' through Environment Announcement No. 2010-108. The same Act. 24 shows as follows. Minister of Environment or governor should do survey on the actual condition targeting rural buildings with slates and partly or fully fund to dissolve, remove asbestos slate which was used in each building. However, the local survey was only conducted by each municipality regionally. And there is no actual condition data by area, application and year, and there was no data on disposal costs concerning asbestos slate buildings In this study, discharge of asbestos slate was calculated per unit area and formula was developed with regression analysis. In addition, Demolition, dismantling, disposal costs were computed via a phone survey to disposal companies and then this study proposed standards for this.

Estimation of the Asbestos Handling History of Workers in the Automobile Manufacturing Industry in Korea (자동차 제조 사업장 근로자들의 석면 취급 이력 추정)

  • Choi, Sangjun;Kim, Shinbum;Choi, Youngeun
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.27 no.4
    • /
    • pp.423-432
    • /
    • 2017
  • Objectives: This study was conducted to evaluate asbestos handling history of workers at automobile manufacturing plants in Korea. Methods: National regulations on asbestos and Korea Occupational Safety and Health Agency(KOSHA) database on the information of asbestos containing products were reviewed. We investigated asbestos related materials from one automobile manufacturing plant. Material safety data sheets(MSDS) collected in 2010, work environment monitoring results reported from 2000 to 2013, trade union reports and asbestos survey reports were reviewed. We also interviewed workers with long career and did walk-through survey. Results: The Ministry of Labor in Korea has permitted asbestos manufacturing since 1990. In 1997, the use of crocidolite and amosite asbestos were banned. In 2007, the Korean government announced a total ban on the manufacturing, importation and use of all kinds of asbestos, which took full effect in 2009. A total of 174 asbestos products information from KOSHA database was analyzed. Extruded cement panel for building, special brake for crane farm machinery, gasket, joint sheet and thermal insulator were produced until 2007. From automobile manufacturing plant survey, we confirmed that asbestos containing materials(ACM) such as gasket, heating induction materials have been used until 2011. Asbestos containing building materials(ACBM) such as bamlites, slate and ceiling tex were reported at 122 asbestos dismantling projects in 2014. Conclusion: Although the use of all kinds of asbestos were banned from 2009, ACMs and ACBMs installed before 2009 were still found at automobile manufacturing plant until 2011 and 2014 respectively. In particular, asbestos slates should be managed because most of slates had not been removed until 2014.

An Asbestos Risk Assessment and Areal Distribution of Asbestos Containing Materials in Public Buildings (석면함유 공공 건축물의 위해성 평가 및 면적 분포 특성)

  • Song, Su-Jin;Jang, Bong-Ki;Jo, Bong-Hyun;Kim, Yeong-Ji;Heo, Eun-Hyeop;Lee, Joung-Dae;Son, Bu-Soon;Lee, Jong-Wha
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.26 no.3
    • /
    • pp.267-276
    • /
    • 2016
  • Objectives: This study, aims to examine the distribution characteristics of asbestos-containing building materials; risk assessment and area of distribution of asbestos-containing building materials depending on year of construction; building materials; types of building materials; and usage in public buildings in order to create fundamental data for safe management of public buildings. Methods: The asbestos investigation was conducted by an asbestos research institution from March to May 2014, targeting 41 public buildings which were subject to asbestos investigation in South Chungcheong-do Province. With respect to 381 presumed asbestos-containing materials, an investigation was conducted into whether they contained asbestos, asbestos type, content, year of construction, and use in the building were examined, and a risk assessment was performed. Results: Asbestos-containing building materials were used in 35 buildings(85.4%). Among them, 31(88.6%) were public buildings. Asbestos was detected in 73% of 381 suspected asbestos-containing materials, which were mostly ceiling materials (85.2%). The older the buildings, the more they showed a tendency to have a significantly higher risk assessment score. The ratio of average area with asbestos-containing building materials to total floor area was 57.6%, 44.1%, and 17.8% for buildings built in the 1980s, 1990s, and 2000s, respectively. This showed a tendency to be significantly higher with the age of the building. Conclusions: From the results above, it can be concluded that with the age of the buildings, the risk assessment score and the ratio of average area with asbestos-containing building materials to total floor area became significantly higher. Given the concern about the exposure to asbestos of residents and civil petitioners, safety management of older public buildings and measures for dismantling and removal of asbestos-containing building materials should therefore be urgently established.