• Title/Summary/Keyword: architectural planning and construction process

Search Result 125, Processing Time 0.025 seconds

A Study on the Housing Development Building by User's Participation (사용자(使用者) 참여(參與)에 의한 주거단지(住居團地) 건축(建築)에 대(對)한 조사(調査) 연구(硏究))

  • Oh, Young-Sik;Choi, Hyo-Seung
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.4 no.1
    • /
    • pp.37-44
    • /
    • 2002
  • There are some studies about user's participation to reflect their desire and value on the planning of house by this time. These were constitution of unit space focused on the apartments, which is mostly theoretical. However, till completion of a construction work, it goes through various processes of some steps such as, buying building site, site planning, architectural planning and construction. In architectural planning process, it takes time for continuous discussion and revision between architects and users. Also changes of plan must of necessity be so because of in or outside conditions. So, right user's participation has its meaning that they take part in each step and portion of process faithfully on whole architectural processes. In this case, tenants of single house were decided and they already buy building site and lay out rules jointly. With this circumstance I've researched a kind of test the reflection on various desires and its acceptance in each steps through completion of a construction work, which is based on their participation.

  • PDF

Formwork Productivity Analysis Model for Cost-efficient Equipment Operations

  • Hyunsu Lim;Taehoon Kim;Hunhee Cho;Kyung-In Kang
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.226-230
    • /
    • 2013
  • In the tall building construction, the slab formwork largely impacts on construction cost. Because productivity of a slab formwork is influenced by a number of and the efficiency of equipment, using the equipment-based construction method, an appropriate equipment input planning is crucial for the productivity. Meanwhile, the general equipment input planning is conducted by intuition based on experience due to the lack of equipment productivity data. Thus, this study develop a simulation model to analyze table formwork productivity and to propose an optimum equipment input plan that reflects the construction process, based on the full consideration of the economic factors. This study developed a simulation model by using CYCLONE and the data for the model was collected by measuring the duration of each unit activity in the tall building where table forms were applied. It is expected that a simulation model helps users to make better decision on the equipment input planning of slab formwork.

  • PDF

Construction performance assessment framework by means of construction simulation for earthwork operations

  • Kim, Yujin;Noh, Jaeyun;Ko, Yongho;Lee, Jaewoo;Han, Seungwoo
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1194-1201
    • /
    • 2022
  • The existing literature has witnessed the importance of productivity assessment and deducing factors affecting it. However, yet many models have shown limitations in practical applications in actual construction sites for process planning due to uncertainty and lack of data. This research presents a productivity assessment and database generation framework using simulation and compares the results with RSMeans to derive appropriate equipment combinations alternatives for earthwork operations. Data of 15 different conditions was collected from 5 different construction sites. Prediction accuracy above 90% were achieved for the simulation models with average error rate of 7.4%. The construction productivity assessment framework presented in this study is expected to be highly applicable to operation planning for earthwork operations.

  • PDF

A Study on the Process of the Housing by User's Participation - A case of Hakmaeul in Taebaek City - (이용자(利用者) 참여(參與)에 의한 주택단지(住宅團地)의 건축과정(建築過程) 연구(硏究) - 태백시 학마을을 중심으로 -)

  • Lee, Seung-Joon;Oh, Young-Sik
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.8 no.3
    • /
    • pp.35-42
    • /
    • 2006
  • There are some studies about user's participation to reflect their desire and value on the planning of house by this time. These were constitution of unit space focused on the apartments, which is mostly theoretical. In architectural planning process, it takes time for continuous discussion and revision between architects and users. Also changes of plan must of necessity be so because of in or outside conditions. So, user's participation has its meaning that they take part in each step and portion of process faithfully on whole architectural processes. In this case, tenants of single houses were decided and they already buy building site and lay out rules jointly. With this circumstance I've researched a kind of test the reflection on various desires and its acceptance in each steps through completion of a construction work, which is based on their participation.

  • PDF

A Business Planning Process Model to Develope Successful Housing Project (개발형 주택건설사업의 성공적 수행 위한 사업 기획 업무프로세스 모델 연구)

  • Park Chan Woo;Kim Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.245-250
    • /
    • 2001
  • Nowadays, there has been extreme competition due to market reduction in the domestic construction industry. In this situation, Korean construction companies are focused in the area of planning development housing project, which should maximize profit for a project. The most important step in this project is the business planning stage which judge whether it could come true or not. Each company has its own planning process model, but there hasn't been any standard model for the business planning process. To solve this problem in Korean construction companies, this study identifies the existing business planning process in the domestic construction companies finds out its problems, and suggests solutions for thorn. And Finally a business planning process model is proposed for success in development housing projects.

  • PDF

Analysis of the Impact of Construction Planning Tasks on Project Cost and Schedule Success in Residential Projects (공동주택 설비공사 계획업무의 성과지표에 미치는 영향분석)

  • Kim, Dae Young;Lim, Hyoungchul;Kim, Daeyoung;Huh, Youngki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.31-38
    • /
    • 2019
  • The main purpose of this study is to analyze the impact of the cost estimates on the construction work in residential apartment housing facilities. The planning work of facility construction is roughly divided into five main tasks which are further broken down into the following: process plan (P1-P6), construction plan (C1-C5), environmental management plan (E1-E4), quality management plan (Q1-Q5) and the safety management plan (S1-S5). In this study these tasks were classified into 25 detailed planning duties and a statistical analysis was performed on each one to determine its impact on cost. Finally this study derives from major planning tasks for effective cost management through correlation between planning tasks, cost indicators and t-test.

A Study on the Requirement Information Management Model and Process Linked to Space Planning in the Early Design Stage

  • Jae Ho, Cho;Sang Woo, Kim;Bo Sik, Son;Jae Youl, Chun
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.566-569
    • /
    • 2013
  • The purpose of this research is to develop the technology to meet the requirements of the design content, and to build a 'Requirement Information Management Model' for the design project. The model that should be used in the early design stage will undergo the following process: First, basic requirements would be defined by extracting the design content in the form of a reusable library of space units. At the next stage, requirement information should be modified after considering unique characteristics for the project and conflict problems between function and performance.

  • PDF

Design and Planning Process Management for Reducing Rework in Modular Construction Using Dependency Structure Matrix (DSM) (DSM을 활용한 모듈러 건축 설계단계에서의 제작 및 시공 정보 반영 및 재시공 감소 방안)

  • Hyun, Hosang;Lee, Hyun-soo;Lee, Jeonghoon;Park, Moonseo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.2
    • /
    • pp.29-36
    • /
    • 2019
  • Modular construction has benefits such as short construction duration and high productivity owing to the production in factory and owing to simultaneous on-site work. However, rework occurs in modular construction and the rework affects the efficiency of modular construction. The almost of causes of rework are exist in design process. To reduce the cause of rework, the information flow of the design process should be managed and the plan to reduce rework should be included. However, the modular construction has complex process because of impeded unit production so it is hard to manage the information flow in design process. Moreover, when the plan to reduce rework is included, the design process will be more complicated. Therefore, the objective of this research is to suggest the design process including the rework reduction plan and to alleviate the complexity of design process by using Dependency Structure Matrix(DSM). By using DSM, the iteration and feedback in design process is reduced and it can be expected that rework in modular project can be reduced by using suggested design process.

ACTIVITY-BASED STRATEGIC WORK PLANNING AND CREW MANAGEMENT IN CONSTRUCTION: UTILIZATION OF CREWS WITH MULTIPLE SKILL LEVELS

  • Sungjoo Hwang;Moonseo Park;Hyun-Soo Lee;SangHyun Lee;Hyunsoo Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.359-366
    • /
    • 2013
  • Although many research efforts have been conducted to address the effect of crew members' work skills (e.g., technical and planning skills) on work performance (e.g., work duration and quality) in construction projects, the relationship between skill and performance has generated a great deal of controversy in the field of management (Inkpen and Crossan 1995). This controversy can lead to under- or over-estimations of the overall project schedule, and can make it difficult for project managers to implement appropriate managerial policies for enhancing project performance. To address this issue, the following aspects need to be considered: (a) work performances are determined not only by individual-level work skill but also by the group-level work skill affected by work team members, each member's role, and any working behavior pattern; (b) work planning has significant effects on to what extent work skill enhances performance; and (c) different types of activities in construction require different types of work, skill, and team composition. This research, therefore, develops a system dynamics (SD) model to analyze the effects of both individual-and group-level (i.e., multi-level) skill on performances by utilizing the advantages of SD in capturing a feedback process and state changes, especially in human factors (e.g., attitude, ability, and behavior). The model incorporates: (a) a multi-level skill evolution and relevant behavior development mechanism within a work group; (b) the interaction among work planning, a crew's skill-learning, skill manifestation, and performances; and (c) the different work characteristics of each activity. This model can be utilized to implement appropriate work planning (e.g., work scope and work schedule) and crew management policies (e.g., work team composition and decision of each worker's role) with an awareness of crew's skill and work performance. Understanding the different characteristics of each activity can also support project managers in applying strategic work planning and crew management for a corresponding activity, which may enhance each activity's performance, as well as the overall project performance.

  • PDF

The Change of Relationship between Spatial Configuration and Pedestrian Movement during Inhabited Remodeling - Focused on Coex Shipping Mall - (재실 리모델링 공사 기간 중 공간구조와 쇼핑객 통행량의 상관성 변화 연구 - 코엑스 쇼핑몰을 대상으로 -)

  • Kim, Min-Soo;Kim, Young-Ook
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.9
    • /
    • pp.11-18
    • /
    • 2019
  • Commercial facilities are put under construction for inhabited remodeling due to management or cost issues. Temporary facility planning is important in inhabited remodeling because building construction and management are simultaneously performed in this type of remodeling. The purpose of this research is to identify how the temporary spatial structure changes for each inhabited remodeling construction level of commercial facilities and existence of tenants affect the spatial usability. It also examines a relationship between the traffic flow and spatial configurations during the inhabited remodeling process where the tenants are temporarily removed and only the spatial configuration are maintained and verifies if the established theory that the spatial configurations in commercial facilities significantly affect the traffic is also valid during the inhabited remodeling process. The research result was found that the amount of traffic during the inhabited remodeling construction process is more affected by the factors such as tenants rather than spatial configurations. It is anticipated that the result of this research will serve as a guideline to establish logical inhabited remodeling plans for each level of constructing temporary facilities. Furthermore, it can be used to minimize the sales damage caused by the construction or as a guideline to determine the order of tenants to be moved into the new commercial facilities.