• Title/Summary/Keyword: architectural design process

Search Result 949, Processing Time 0.034 seconds

A Study on the Architectural Meaning and Characteristics of L'Art Sacré Movement advocated by Marie Alain Couturie (마리 알랭 쿠튀리에가 주창한 성미술(L'Art Sacré) 운동의 건축적 의미와 특성 고찰)

  • Bahn, Sang-Chul;Kim, Hong-Ki
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.12
    • /
    • pp.518-531
    • /
    • 2016
  • This study aimed to find the architectural meaning and characteristics of L'Art Sacr? Movement advocated by Dominican Father Marie Alain Couturie. From 1936 till 1954 Father Couturier was the chief editor of the review L'Art Sacr? that became very influential among art critics no longer satisfied with what was considered outdated 19th century church interior decoration. Marie Alain Couturie was a French Dominican friar and Catholic priest who gained fame as a designer of stained glass windows. He was noted for his modern inspiration in the field of Sacred Art. Couturier's greatest ambition was to revive Christian art by appealing to the independent masters of his time. From these viewpoint, we investigated the background and process of the movement and analyzed the architectural meaning and characteristics which represented the Art Sacr? movement. The analyzed chapel buildings were as follows: 1) The Church of Notre-Dame de Toute Gr?ce du Plateau d'Assy, bringing together Braque, Matisse, Rouault, L?ger and Chagall, 2) The Chapel of Saint-Marie Rosaire by Henri Matisse, 3) The Chapel of Notre Dame du Haut and The Couvent de La Tourette by Le Corbusier, and 4) The Rothko Chapel by Mark Rothko and Philip Johnson. These L'Art Sacr? projects inscribedthemselveswithin what was the century's most serious attempt at the reintegration of Art and religious space. Courturier's interactions with artists and architects are traced and shown to have played a major role in the evolution of the priest's thinking and Church interior decoration. At the same time, Courturier's clear and vigorous L'Art Sacr? articles were both defining the theoretical basis of new vision and anticipating the renewal of the religious space.

A Proposal of BIM Work Process to Support Construct-ability Analysis from Practitioners Viewpoint (현장실무자 관점에서의 시공성 검토 지원을 위한 BIM 업무프로세스 제안)

  • Kim, Dae-Sung;Choi, Hye-Mi;Kim, Ju-Hyung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.6
    • /
    • pp.561-569
    • /
    • 2014
  • In construction site, BIM is used in part of construct-ability review and design mistake checking. However, in a current domestic construction site, except public order project, most of work in private order project has been processing based on 2D work. As an expert resists to certain point in introduction of new technique, it may be shown in the introduction of BIM. For this, We need to analysis construct-ability of introducing BIM, work field of introducing and operational capability about present domestic construction engineers. Therefore, this study solves the problem of existing construct-ability analysis, and it visualizes the various information and objects for an effective job performance. Furthermore, construct-ability analysis by BIM that can use an intergrated management is theoretically examined and practical field-application priority among conclusions is proposed through a survey targeting on the hand-on worker. Therefore, this study suggests a factor supplying for a business-centric introduction plan and support condition.

CM at Risk Case Study on Guaranteed Maximum Price Contract - Focused on Cases for USA - (책임형 CM 발주방식의 최대공사비보증계약 사례연구 - 미국 공공발주 프로젝트 사례 중심 -)

  • Jeong, Jinhak;Han, Jonghoon;Lee, Joosung;Ahn, Yonghan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.22-30
    • /
    • 2019
  • The purpose of this study is to derive basic data of the Guaranteed Maximum Price(GMP) process and to present specimens that can be used at the time of execution of CM at Risk project in South Korea. CM at Risk project is issued in South Korea, but the actual data is lack. On the other hand, CM at Risk project is universalized and the market of the CM at Risk is steadily growing. Because of that, in this study, The United States cases was selected as a sample. GMP consists of CM's fee, CM contingency, project direct cost, project indirect cost, allowance. GMP negotiations are performed before the end of design completion, and after 3 rounds of estimation comparison, preliminary GMP is confirmed. GMP can be multiple contract and it is useful for Procurement of long lead materials and early construction. If the actual cost is lower than expected GMP, sharing of the saving is an option since the conflict of interests between the client and the contractor can occur.

Development of Risk Evaluation Checklist for In-Situ Production of Precast Concrete Members (기성콘크리트 부재의 현장생산 리스크 평가를 위한 체크리스트 개발)

  • Lim, Jeeyoung;Jeong, Hee Woong;Kim, Dae Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.5
    • /
    • pp.445-457
    • /
    • 2021
  • In previous studies, it was confirmed that through the in-situ production of precast concrete members, costs could be reduced by 14.5-39.4% compared to in-plant production. In particular, it was confirmed that the factory owner did not make a contract if it did not earn more than 20% of the production cost. If precast concrete members are produced in-situ under the same conditions, the quality equivalent to that of factory production can be secured. As it is advantageous in terms of cost and quality, precast concrete members must be produced in-situ. However, it is difficult to produce all quantities in-situ due to time and various other constraints. This is because in-situ production is avoided due to anticipated risks during the project management process. However, if the risk factors are analyzed before performing in-situ production of precast concrete members, it will increase the opportunity for in-situ production. Therefore, this study develops a checklist for evaluating the risk of in-situ production of precast concrete members. By applying the checklist to one case site, it was verified that risk factors can be evaluated easily and quickly. As a result, it was analyzed that sites with a high building coverage ratio are classified as high-risk sites because it is difficult to secure usable area for production and storage. The developed checklist efficiently evaluates the risk factors of in-site production, and makes it possible for the operator to determine the risk factors, which can change frequently during project execution, and respond according to the situation.

How to automatically extract 2D deliverables from BIM?

  • Kim, Yije;Chin, Sangyoon
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1253-1253
    • /
    • 2022
  • Although the construction industry is changing from a 2D-based to a 3D BIM-based management process, 2D drawings are still used as standards for permits and construction. For this reason, 2D deliverables extracted from 3D BIM are one of the essential achievements of BIM projects. However, due to technical and institutional problems that exist in practice, the process of extracting 2D deliverables from BIM requires additional work beyond generating 3D BIM models. In addition, the consistency of data between 3D BIM models and 2D deliverables is low, which is a major factor hindering work productivity in practice. To solve this problem, it is necessary to build BIM data that meets information requirements (IRs) for extracting 2D deliverables to minimize the amount of work of users and maximize the utilization of BIM data. However, despite this, the additional work that occurs in the BIM process for drawing creation is still a burden on BIM users. To solve this problem, the purpose of this study is to increase the productivity of the BIM process by automating the process of extracting 2D deliverables from BIM and securing data consistency between the BIM model and 2D deliverables. For this, an expert interview was conducted, and the requirements for automation of the process of extracting 2D deliverables from BIM were analyzed. Based on the requirements, the types of drawings and drawing expression elements that require automation of drawing generation in the design development stage were derived. Finally, the method for developing automation technology targeting elements that require automation was classified and analyzed, and the process for automatically extracting BIM-based 2D deliverables through templates and rule-based automation modules were derived. At this time, the automation module was developed as an add-on to Revit software, a representative BIM authoring tool, and 120 rule-based automation rulesets, and the combinations of these rulesets were used to automatically generate 2D deliverables from BIM. Through this, it was possible to automatically create about 80% of drawing expression elements, and it was possible to simplify the user's work process compared to the existing work. Through the automation process proposed in this study, it is expected that the productivity of extracting 2D deliverables from BIM will increase, thereby increasing the practical value of BIM utilization.

  • PDF

An Analysis on Effectiveness of BIM-based Area Calculation Method for Improving Quality of Korean Apartment Housing (국내 공동주택의 품질향상을 위한 BIM기반 면적산정 방법의 실효성 연구)

  • Kim, Jun-Gyu;Ryu, Jung-Rim;Choo, Seung-Yeon
    • Journal of the Korean housing association
    • /
    • v.24 no.2
    • /
    • pp.45-52
    • /
    • 2013
  • The Purpose of this study is to improve construction quality with area calculation methods from BIM design technology. BIM has been supporting public-private-organizations and academic circles as a solution technology to manage and produce informations effectively from construction field including facility manage one. BIM standards are necessary but not sufficient for achieving perfect practical application in South Korea. In particular, development of architectural rule based area calculation methods is very urgent and important to improve construction quality. To solve those problems, methods and standards on area calculation are developed and its effectiveness of the proposed BIM-based methods is defined through the analysis between the existed area calculation method and process which are 2D based. This study will not only improve economic efficiency and accuracy of the construction quality but also settle the BIM environment in the domestic architecture.

Granular Bidirectional and Multidirectional Associative Memories: Towards a Collaborative Buildup of Granular Mappings

  • Pedrycz, Witold
    • Journal of Information Processing Systems
    • /
    • v.13 no.3
    • /
    • pp.435-447
    • /
    • 2017
  • Associative and bidirectional associative memories are examples of associative structures studied intensively in the literature. The underlying idea is to realize associative mapping so that the recall processes (one-directional and bidirectional ones) are realized with minimal recall errors. Associative and fuzzy associative memories have been studied in numerous areas yielding efficient applications for image recall and enhancements and fuzzy controllers, which can be regarded as one-directional associative memories. In this study, we revisit and augment the concept of associative memories by offering some new design insights where the corresponding mappings are realized on the basis of a related collection of landmarks (prototypes) over which an associative mapping becomes spanned. In light of the bidirectional character of mappings, we have developed an augmentation of the existing fuzzy clustering (fuzzy c-means, FCM) in the form of a so-called collaborative fuzzy clustering. Here, an interaction in the formation of prototypes is optimized so that the bidirectional recall errors can be minimized. Furthermore, we generalized the mapping into its granular version in which numeric prototypes that are formed through the clustering process are made granular so that the quality of the recall can be quantified. We propose several scenarios in which the allocation of information granularity is aimed at the optimization of the characteristics of recalled results (information granules) that are quantified in terms of coverage and specificity. We also introduce various architectural augmentations of the associative structures.

Analyzing the Differential Views between the Designers and the Users on Certification Assessment Criteria of the G-SEED System - Focused on Certification Assessment Criteria for Apartment Buildings - (녹색건축 인증제도 평가항목에 대한 설계 실무자 및 사용자 의식 차이 분석 - 공동주택 인증 평가항목을 중심으로 -)

  • Choi, Yeo-Jin
    • KIEAE Journal
    • /
    • v.15 no.6
    • /
    • pp.87-92
    • /
    • 2015
  • Purpose: The green building certification system in Korea was introduced in 2002 and developed as an improvement version of the G-SEED(Green Standard for Energy and Environmental Design) system in 2013. This study conducts surveys targeting architectural designers and users on significance of certification assessment criteria for apartment buildings on the G-SEED system and examines the differential views between the two groups on assessment criteria. Method: First, The AHP(Analytic Hierarchy Process) method was used to find importance of assessment criteria and then the importances were compared with weighted points on the certification standard. Second, the t-test was used to investigate differential views between designer and user groups on certification assessment criteria based on drawn importances. Result: (1) While designer group considered land use and transportation, energy and environmental pollution, and water circulation management as more important, user group did material and resource, maintenance management, ecological environment, and indoor environment as more important. (2) Based on t-test results, sustainable energy, water circulation system, site management, habitat, acoustical environment, and light environment were found to be different on importance between the two groups.

Evaluation on Structural Performance of Two-nodal Rotary Frictional Component (2절점 회전형 마찰요소의 구조성능 평가)

  • Kim, Do-Hyun;Kim, Ji-Young;Kim, Myeong-Han
    • Journal of the Korean Society for Advanced Composite Structures
    • /
    • v.6 no.4
    • /
    • pp.51-57
    • /
    • 2015
  • Various hybrid dampers have been developed in Korea to control the vibration due to a wind and earthquake. In order to minimize the installment space, cost and construction process, the new hybrid friction damper is developed. This hybrid damper is composed of several rotary friction components having two frictional joint. Because of these components, the building vibration due to wind and earthquake can be mitigated by hybrid friction damper. In this paper, various dependency tests were carried out to evaluate on the structural performance of two joint rotational friction component of the hybrid damper. Test results show that two joint rotational components do not depend on a displacement and a frequency of forcing but friction coefficients is reducing as a clamping force is increasing.

A Study of Modular Architecture's Design to Dwelling Environment in Antarctica (극한지 모듈러 건축물의 설계, 시공 및 거주환경에 대한 연구)

  • Lee, Won-Hak;Song, Young-Hak;Lim, Seok-Ho
    • Journal of the Korean housing association
    • /
    • v.25 no.2
    • /
    • pp.11-18
    • /
    • 2014
  • This study looked at designing, building and operating temporary camp, the first structures that South Korea built in the Antarctica. While there may be differences in accordance with the topography, ground surfaces in the Antarctica are covered broken stones, glaciers and snow. Hence, such topographical characteristics should be taken into account when conducting any construction work. To ensure successful assembly construction in the Antarctica using modules, prior trial assembly work should be done in Korea to identify any possible trouble in the actual construction process. Assuming that the workers will have to spend at least one winter in the temporary camp, the work will be more severely affected by adverse weather conditions and snow drift, resulting in the need to clear snow. This can be by designing roofs with curved surfaces. Also, quantitative effects will need to be verified through simulation and actual measurement. It will also be necessary to assess the camp's thermal environment and examine its air-conditioning methods. To identify the temporary camp's thermal system, the temperatures and humidities were measured, and the heating system was designed not to offer automatic control or desired value selection functions.