The 6th International Conference on Construction Engineering and Project Management
/
pp.639-640
/
2015
Traditional construction planning based on historical data and heuristic adjustment can no longer incorporate all the operational details and guarantee the expected performance. The variation between the expected and the actual production leads to cost overruns or delay. Although predicting reliable productivity on construction site is getting more important, the difficulty of this increases. In this regard, this paper suggested to develop BIM-integrated simulation framework. This framework could predict productivity dynamics by considering factors affecting on construction productivity at operational phase. We developed the following processes; 1) enabling a BIM model to produce input data for simulation; 2) developing the construction operation simulation; 3) running simulation using BIM data and obtaining productivity results. The BIM-integrated simulation framework was tested with structural steel erection model because steel erection work is one of the most critical process influencing on the whole construction budget and duration. We could improve to predict more dynamic productivity from this framework, and this reliable productivity helps construction managers to optimize resource allocation, increase schedule reliability, save storage cost, and reduce material loss.
The 3th International Conference on Construction Engineering and Project Management
/
pp.1237-1241
/
2009
With the average life expectancy increasing thanks to better standards of living and medical technology, the number of elderly construction workers in construction sites rises every year to surpass the 450 thousand people in the construction industry (24.7% of all employees in the construction industry). Similarly, the percentage of fatal accidents involving elderly workers has stood at 41~46 percent for the past five years; note that this is significantly higher than the other age groups, making safety measures for dealing with this issue a matter of urgency. This study sought to propose appropriate safety guidelines for elderly construction workers aged 50 years and over by examining the changes in their physical and psychological functions and through the subsequent analysis of the current status and causes of fatal accidents involving them. The guidelines targeted ferroconcrete construction where accidents occur quite often; construction was classified into mold construction, reinforcing rod construction, and concrete construction. Mold construction was further classified into preparation, carry-in, processing, assembly, and disassembly, and reinforcing rod construction, into preparation/transport and processing/assembly. Safety guidelines for each process were presented by dividing them into three aspects considering the changes in the physical and psychological functions according to their ages and type of accident causes: work environment improvement, machinery and equipment improvement, and work method improvement.
Joo-Sung, Lee;Sung-Kon, Moon;Ju-Hyung, Kim;Jae-Jun, Kim
국제학술발표논문집
/
The 3th International Conference on Construction Engineering and Project Management
/
pp.566-572
/
2009
Turn-key and CMF(CM for Fee) have been selected as procurement paths of large public projects in Korea. However, recently, researches and discussions on CMR(CM at Risk) have been popular as the Korean government seeks for alternative procurement paths to enhance the performance. In the CMR projects, the part who is responsible for construction management should predict and control the potential risks for guaranteeing benefits. In this paper, CMR projects in which a general contractor plays the role as CMr is mainly analyzed. We give attentions to risk management during construction process given that subcontractors, main parts in this phase, work in various ways and thus more chances for faults exist. In this case, for the general contractor, to recognize potential risks in previous to start construction works of subcontractor by means of virtual design and construction (VDC) must be essential to this end. The case study of practices on VDC in U.S in which CMR has been introduced can provide considerable aspects to implement it in Korea.
The general contractor business in South Korea settled in the railway construction during the Daehan Empire, but depending on the construction intention and circumstances of the railroad, relationship among employer-contractor-subcontractor and their roles under the system of the construction process had changed. At the time of laying the Gyeongin and Gyeongbu-rail, the Empire, which had no capital and technology, passed all the power and responsibility of the rail laying to the contractor, who was involved in most of the process. After this, the empire tried to lay Gyeongui-railroad without the help of other countries. Japan prepared for the Russo-Japanese War and decided to construct the railway rapidly, and completed the railway in parallel with direct management work and contract work. From that time on, the general contractor would only do the work. During the construction of railroad in Daehan empire, the general contract business system was established. The ambiguous process was sorted out and divided. At this time, subjects in charge of design and construction has been divided. The internal organization of the project owner and the contractor were organaized and specialized.
건설현장에서의 안전사고는 근로자의 생명을 앗아가는 중대한 사고로 이어질 수 있고, 정부차원에서 산업재해 감소를 위해 많은 노력을 기울이고 있는 만큼 건설현장에서 재해발생과 밀접한 관련이 있는 안전관리자의 역할이 중요해지고 있다. 하지만 현행 건설업 안전관리에 있어 안전관리자가 담당하는 업무량이 과도하게 많고, 효율적이지 못한 업무들로 인해 직무 스트레스가 많이 발생하고 있다. 따라서 업무내용의 개선 및 간소화가 필요한 실정이다. 본 연구의 주된 목적은 안전관리자 안전관리 단계의 업무들을 난이도와 예방효과에 대해 전문가 의견과 설문조사를 통해 2×2 Matrix 분석 기법을 활용해 비효율적인 업무의 간략화 및 개선이 필요한 업무들을 파악하고 개선방향을 제시함으로써, 궁극적으로 건설현장의 안전사고 발생을 줄이는 데 기여하고자 한다.
In Korea, there is a lack of adequate safety management for small-scale construction work, particularly when compared to large-scale construction projects. The number of construction disasters is also higher on small-scale construction sites. In this regard, this study aimed to develop the application prototype to support the safety management of small-scale construction projects. The major findings of the research are as follows. 1) About 60% of construction disasters and death occurred on small-scale construction sites over the last two years. In addition, institutional support and costs for safety management were found to be insufficient. 2) The items of the application for the small-scale construction safety management were constructed on the basis of the safety management of large-scale construction work. The contents of the application were confirmed based on a survey of small-scale construction project managers. 3) The application algorithm was developed with a focus on the roles of management subjects and information exchange. For transition from the application prototype presented in this study to a commercial product, further research needs to be conducted regarding the reflection of user requirements and application management subjects.
The number of schools which have passed 30 years after the construction takes up 30% (5% falling to class D and E) in Korea. So, the offices of education across the nation conduct large works for the expansion, improvement and renovation of the school. But as the work takes a lot of time, the work is also conducted while the students are studying at the schools. The work at the school causes the noise, dust, vibration as the school often has the reinforced concrete structure. So, as the windows are closed to prevent the nuisance from hampering the education, the problems related to the illumination, ventilation, and control of humidity and temperature are give damages to students studying the school buildings. Actually, as the current renovation or expansion is conducted across the nation due to the implementation of the new education system and the resulting integration and construction of hub school, specialized school, meister school and it causes a lot of nuisance to the learning students and others, there are a lot of complaints from concerned people. Accordingly this study suggests the method of evaluating the factors which affect the learning environment such as the noise, dust or fine dust and reducing the nuisances to the level proper for the learning environment when the existing school is expanded, improved or renovated.
Recently, as the shape and function of high-rise buildings have become more complex, engineering for reflecting the constructability in the design phase has the increasing importance. However, engineering tasks are not performed at the appropriate level and timing in most projects, which leads to inefficient work such as design changes and reworks. Hence, this study investigated the constructability knowledge, design elements, and supporting tools required to conduct engineering tasks related to temporary work at the design phase, and also analyzed the relationship between these factors using the correlation analysis. As a result, when the engineering tasks are applied in the design phase, constructability knowledge related to 'construction method and process' is the most important and the design factor related to 'layout/arrangement' should be considered as the most important factor. Based on the results of this study, the project participants can efficiently use necessary constructability knowledge during the design phase and facilitate effective decision-making and design alternatives for enhancing constructability.
콘크리트 구조물의 골조공사에서의 주요 공정 중 하나인 거푸집 공사는 전체 건축공사의 공사기간 및 공사비 측면에서 상당 부분을 차지하고 있다. 하지만 공사현장의 조건을 고려한 거푸집의 적정시스템 선정은 현재까지 현장실무자의 경험에만 의존하고 있는 실정이다. 본 논문에서는 거푸집 공법 선정 요인에 대한 정량화된 분석을 바탕으로 슬래브 거푸집 중 신공법과 기존 공법을 선정하여 각 공법의 성능을 정량화된 분석데이터를 바탕으로 평가했다. 이를 통하여 각 공법들의 정성적 항목에 대한 정량화된 평가점수를 산출하여 슬래브 거푸집의 현장 적용성에 대한 평가 방안을 제시하였다. 따라서 본 논문에서 사용된 델파이 기법의 방법론은 다른 공법들의 선정, 평가에도 사용될 것이라 사료된다.
건설 프로젝트d의 대형화, 복잡화, 다양화로 인해 건설공사에서 발생되는 정보의 양이 기하급수적으로 증가하고 있다. 이에 설계 및 시공 검토가 현장 성공 여부에 치명적인 영향을 미치고 있다는 사실을 인지하고, 이를 위한 다양한 노력들이 학계와 산업에서 활발하게 이뤄져 왔다. 설계, 계획 및 유지관리 등 건설 전 단계에서 BIM의 활용은 늘어나고 있는 추세이고, 현재 건설 산업에서 사용되는 표준 중의 하나로 받아들여지고 있다. 하지만 가시설물을 위한 전문화된 소프트웨어가 없을 뿐만 아니라 전문적인 기술자가 절대적으로 부족하여 BIM기반 가설공사 설계는 2D 설계를 완료한 후 3D로 형상화하여 보조수단으로 활용된다. 이에 본 연구에서는 BIM기반 가시설물 설계 및 물량산출, 현장점검 업무의 인간적인 실수(Human error)를 최소화하고 업무시간을 단축할 수 있도록 하여 업무 효율을 높일 수 있는 BIM기반 업무지원시스템을 개발하고자 한다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.