A Multicast ATM Switch Architecture using Shared Bus and Shared Memory Switch (공유 버스와 공유 메모리 스위치를 이용한 멀티캐스트 ATM 스위치 구조)

  • 강행익;박영근
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.24 no.8B
    • /
    • pp.1401-1411
    • /
    • 1999
  • Due to the increase of multimedia services, multicasting is considered as important design factor for ATM switch. To resolve the traffic expansion problem that is occurred by multicast in multistage interconnection networks, this paper proposes the multicast switch using a high-speed bus and a shared memory switch. Since the proposed switch uses a high-speed time division bus as a connection medium and chooses a shared memory switch as a basic switch module, it provides good port scalability. The traffic arbitration scheme enables internal non-blocking. By simulation we proves a good performance in the data throughput and the cell delay.

  • PDF

Performance Analysis of OCDMA on Plastic Optical Fiber Access Network (플라스틱 광섬유를 사용한 통신망에서 OCDMA의 성능 분석)

  • Zhang, Ke;Suh, Hee-Jong
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.11 no.11
    • /
    • pp.1083-1092
    • /
    • 2016
  • In this paper, the performance of the optical code-division multiple access (OCDMA) technology on a plastic optical fiber (POF) access network, which had received much attention due to its low weight, large core diameter, flexibility, easy installation, and especially its high bandwidth, is analyzed. Recently, POF was a very attractive candidate for transmission media in an access network based on OCDMA technology. But the conventional OCDMA system only allows finite units to transmit and access simultaneously according to the number of channels which are restricted by BER, and so, in this paper, to resolve this problem a novel multi-priority reservation protocol is also proposed. By using this reservation scheme and a distributed arbitration algorithm, channel collision and destination conflict could be avoided. And this protocol can efficiently support the transmission of multimedia messages that require the different time-delay. The network throughput and average delay using various system parameters have been investigated by numerical analysis and simulation experiments. These results shows that the multi-priority reservation protocol in this POF access network based on OCDMA technology is valid and efficient.

The Improvement Measurement on Dispute Resolution System for Air Service Customer (항공서비스 소비자 분쟁해결제도의 개선방안)

  • Lee, Kang-Bin
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.33 no.2
    • /
    • pp.225-266
    • /
    • 2018
  • In 2017, 1,252 cases of damages relief related to air passenger transport service were received by the Korea Consumer Agency, a 0.8% drop from 1,262 cases in 2016, the first decline since 2013. In 2017, 444 cases (35.4%) out of received cases of damages relief in the field of air passenger service received by the Korea Consumer Agency were agreed on, and out of cases that were not agreed on, the most number of 588 cases (47.0%) were concluded due to information provision and counseling, and 186 cases (14.9%) were applied to the mediation of the Consumer Dispute Mediation Committee. Major legislations that contain regulations for the damages relief and disputes resolution of air service consumers include the Aviation Business Act and the Consumer Fundamental Act, etc. The Aviation Business Act provides the establishment and implementation of damage relief procedure and handling plan, and the receiving and handling of request of damage relief by air transport businessman, and the notice of protection standard for air traffic users. The Consumer Fundamental Act provides the establishment and management of the consumer counseling organization, the damage relief by the Korea Consumer Agency, the consumer dispute mediation, and the enactment of the criteria for resolving consumer disputes. The procedures for damages relief of air service consumers include the receiving and handling of damages relief by air transport businessman, the counseling, and receiving and handling of damages relief by the Consumer Counseling Center, the advice of mutual agreement by the Korea Consumer Agency, and the dispute mediation system by the Consumer Dispute Mediation Committee. The current system of damage relief and dispute mediation for air service consumer have the problem in the exemption from obligation of establishment and implementation of damage relief plan by air transport businessman under the Aviation Business Act, the problem in the exemption from liability in case of nonfulfillment and delay of transport by aviation businessman under the criteria for resolving consumer disputes in the aviation sector, and the uppermost limit in procedure progress and completion of consumer dispute mediation under the Consumer Fundamental Act. Therefore, the improvement measurements of the relevant system for proper damage relief and smooth dispute mediation for air service consumer are to be suggested as follows: First is the maintenance of the relevant laws for damage relief of air service consumer. The exemption regulation from obligation of establishment and implementation of damage relief plan by air transport businessman under the Aviation Business Act shall be revised. To enhance the structualization and expertise of the relevant regulation for protection and damage relief of air service consumer, it will be necessary to prepare the separate legislation similar to the US Federal Regulation 14 CFR and EU Regulation EC Regulation 261/2004. Second is the improvement of criteria for resolving air service consumer disputes. For this, it will be necessary to investigate whether the cause of occurrence of exemption reason was force majeure, and distinguish the exemption from liability in case of nonfulfillment and delay of transport by aviation businessman under the criteria for resolving consumer disputes in the aviation sector, and revise the same as exemption reasons regulated under the air transport chapter of the Commercial Act and Montreal Convention 1999, and unify the compensation criteria for the nonfulfillment of transport that the substitute flight was provided and the delay of transport. Third is the reinforcement of information provision for damage relief of air service consumer. Aviation-related government agencies and concerned agencies should cooperate with airlines and airports to provide rapidly and clearly diverse information to the air traffic users, including laws and policies for damages relief of air service consumers. Fourth is the supplement to the effectiveness, etc. of consumer dispute mediation. If there is no sign of acceptance for dispute mediation, it is not fair to regard it as acceptance, therefore it will be necessary to add objection system. And if a dispute resolution is requested to another dispute settlement agency in addition to the Consumer Dispute Mediation Committee, it is excluded from the damage relief package, but it should be allowed for the party to choose a mediation agency. It will be necessary to devise the institutional measures to increase the completion rate of mediation so that the consumer dispute can be resolved efficiently through the mediation. Fifth is the introduction of the air service consumer arbitration system. A measure to supplement the limitations of the consumer dispute mediation system is to introduce the consumer arbitration system, but there are two measurements which are the introduction of the consumer arbitration under the Consumer Fundamental Act and the introduction of the consumer arbitration under the Arbitration Act. The latter measurement is considered to be appropriate. In conclusion, as a policy task, the government should prepare laws and system to enhance the prevention and relief of damages and protection of the rights and interests of air service consumers, and establish and implement the consumer-centric policy for the advancement of air service.

A study of QoS for High Speed MIOQ Packet Switch (다중 입출력 큐 방식 고속 패킷 스위치를 위한 QoS에 대한 연구)

  • Ryu, Kyoung-Sook;Choe, Byeong-Seog
    • Journal of Internet Computing and Services
    • /
    • v.9 no.2
    • /
    • pp.15-23
    • /
    • 2008
  • This paper proposes the new structural MOQ(Multiple Input/Output-Queued) switch which guarantees QoS while maintaining high efficiency and deals with the Anti-Empty algorithm which is new arbitration algorithm to be used for the proposed switch. The new structure of the proposed switch based on MIQ, MOQ is designed to have the same buffer speed as the external line speed. Also, the proposed switch makes it possible to remove the weak point of existing methods and introduces the new method of the MOQ operation to support QoS. Therefore, this switch is equal to the Output Queued switch in efficiency and delay, and guarantees the high-speed switching supporting QoS without cell loss.

  • PDF

A Study on the Judgement Criterion of Arrived Ship under Voyage Charterparty (항해용선계약상 도착선의 판단기준에 관한 연구)

  • Han, Nakhyun;Lee, Jaesung
    • Journal of Korea Port Economic Association
    • /
    • v.28 no.3
    • /
    • pp.167-192
    • /
    • 2012
  • The purpose of the study aims to analyse the judgement criterion of arrived ship under voyage charterparty with the Merida Case. A ship is an arrived ship if she is in port and either able to proceed immediately to a berth or in such a position that she is at the immediate and effective disposition of the chaterparty. Identification of the specified destination-whether berth or port-impacts on the incidence of loss occasioned by delay in loading or discharging, when the delay is due to the place at which the vessel is obliged by the terms of the charterparty to load or discharge her cargo being occupied by other shipping. The Merida case is an appeal by the charterers from a final Arbitration award of two very experienced arbitrators, dated 20th April, 2009. The arbitrators held that a voyage charterparty, dated 5th February, 2007, of the vessel, The M/V Merida, entered into between charterers and the owners, was a port rather than a berth Charterparty. The Primary relevance of this distinction does to the allocation, as between owners and charterers, of the risk of delay caused by congestion at load and discharge ports. The question of law arising in this appeal is whether the arbitrators were right to conclude that the charterparty was a port and not a berth charterparty. The arbitrators additionary placed some reliance on a post-contractual e-mail from the agents, which suggested that charterers did not dispute the validity of the NOR-and, hence, that this was a port charterparty.

Forecasting the Effects of the Claims in the Korean Construction Industry (국내 중재사례를 통한 주요 건설 클레임 예측 방안)

  • Kim, Jihye;Im, Haekyung;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.35-44
    • /
    • 2016
  • Various risk factors are known to be the nature of construction project execution process. These factors lead to potential claims, dispute mediation, arbitration, and litigation which can result in huge loss of money and time. Therefore, it is necessary for construction companies in Korea to improve overall project management capability through the evaluation before entering into the overseas construction market. Also, after examination of the claim and dispute caused by construction project risks, a substantial degree of influence and active preparation for the claim and dispute management should be confirmed via the effect analysis of the each factors. Main claim causes were derived through claim and dispute cases involved with domestic construction projects. As a prediction result of the main claim, 16.1% of the construction change claim, 5.7% of the bad faith claim and 2.7% for the construction delay claim were found to be the portion of the total construction cost. As a result of this analysis, risk management methodology was suggested to improve a project management capability for domestic construction companies through analysis result of the main factors of construction claims.

A Study of Domain Name Disputes Resolution with the Korea-U.S. FTA Agreement (한미자유무역협정(FTA)에 따른 도메인이름 분쟁해결의 개선방안에 관한 연구)

  • Park, Yu-Sun
    • Journal of Arbitration Studies
    • /
    • v.17 no.2
    • /
    • pp.167-187
    • /
    • 2007
  • As Korea has reached a free trade agreement with the United States of America, it is required to provide an appropriate procedure to ".kr" domain name disputes based on the principles established in the Uniform Domain Name Dispute Resolution Policy(UDRP). Currently, Internet address Dispute Resolution Committee(IDRC) established under Article 16 of the Act on Internet Address Resources provides the dispute resolution proceedings to resolve ".kr" domain name disputes. While the IDRC's proceeding is similar to the UDRP administrative proceeding in procedural aspects, the Domain Name Dispute Mediation Policy that is established by the IDRC and that applies to disputes involving ".kr" domain names is very different from the UDRP for generic Top Level Domain (gTLD) in substantial aspects. Under the Korea-U.S. Free Trade Agreement(KORUS FTA), it is expected that either the Domain Name Dispute Mediation Policy to be amended to adopt the UDRP or the IDRC to examine the Domain Name Dispute Mediation Policy in order to harmonize it with the principles established in the UDRP. It is a common practice of cybersquatters to warehouse a number of domain names without any active use of these domain names after their registration. The Domain Name Dispute Mediation Policy provides that the complainant may request to transfer or delete the registration of the disputed domain name if the registrant registered, holds or uses the disputed domain name in bad faith. This provision lifts the complainant's burden of proof to show the respondent's bad faith because the complainant is only required to prove one of the three bad faiths which are registration in bad faith, holding in bad faith, or use in bad faith. The aforementioned resolution procedure is different from the UDRP regime which requires the complainant, in compliance with paragraph 4(b) of the UDRP, to prove that the disputed domain name has been registered in bad faith and is being used in bad faith. Therefore, the complainant carries heavy burden of proof under the UDRP. The IDRC should deny the complaint if the respondent has legitimate rights or interests in the domain names. Under the UDRP, the complainant must show that the respondent has no rights or legitimate interests in the disputed domain name. The UDRP sets out three illustrative circumstances, any one of which if proved by the respondent, shall be evidence of the respondent's rights to or legitimate interests in the domain name. As the Domain Name Dispute Mediation Policy provides only a general provision regarding the respondent's legitimate rights or interests, the respondent can be placed in a very week foundation to be protected under the Policy. It is therefore recommended for the IDRC to adopt the three UDRP circumstances to guide how the respondent can demonstrate his/her legitimate rights or interests in the disputed domain name. In accordance with the KORUS FTA, the Korean Government is required to provide online publication to a reliable and accurate database of contact information concerning domain name registrants. Cybersquatters often provide inaccurate contact information or willfully conceal their identity to avoid objection by trademark owners. It may cause unnecessary and unwarranted delay of the administrative proceedings. The respondent may loss the opportunity to assert his/her rights or legitimate interests in the domain name due to inability to submit the response effectively and timely. The respondent could breach a registration agreement with a registrar which requires the registrant to submit and update accurate contact information. The respondent who is reluctant to disclose his/her contact information on the Internet citing for privacy rights and protection. This is however debatable as the respondent may use the proxy registration service provided by the registrar to protect the respondent's privacy.

  • PDF

A Study on the Claim for Damages for Detention resulted from the Breach of Safe Port Warranty under Voyage Charter (항해용선계약상 안전항담보의무위반에 의한 초과정박손해배상금의 청구에 관한 연구)

  • Han, Nak-Hyun
    • Journal of Korea Port Economic Association
    • /
    • v.25 no.2
    • /
    • pp.149-176
    • /
    • 2009
  • In Count case, the owners claimed from the charterers the amount of their loss resulting from the delay to the Count caused by the blockage of the channel due to stranding of the Pongola on the ground that this loss resulted from breach by the charterers of the safe port provisions. The Claim was referred to arbitration and dealt with on written submission. In a reasoned award, the arbitrators upheld the owners' claim. The charterers seek an order reversing the award or remitting it to the arbitrators for further consideration : (1) That the tribunal was wrong to find that the port of Beira was unsafe and that in consequence the charterers were liable to the owners in damages for detention. (2) That the tribunal was wrong to find that the port was unsafe in the abstract by reference to the fact that two other vessels had grounded there. (3) Having held that the Count was delayed for a little over four days by the fact that, after the charterers had nominated the port, the Pongola had grounded in the access channel, the tribunal should have held that the port was not prospectively unsafe. On the that the grounding the Pongola was caused by the characteristics which made the port an unsafe port to nominate for the Count. The court was held that it was not an independent event which broke the chain of causation between the breach of contract and the owner's loss. For those reasons, the court was upheld the arbitrator's award.

  • PDF