• Title/Summary/Keyword: apartment project

Search Result 339, Processing Time 0.025 seconds

Automated Data Analysis of Floor Plans for the Remodeling of Apartment Housing

  • Seo, Wonseok;Kim, Seongah;Park, Junseok;Kim, Jinyoung
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1059-1066
    • /
    • 2022
  • In 2020, it was estimated that more than 2.4 million households in South Korea are over 30 years old. That is, more than 40% of all houses in Korea are old and that they require proper rehabilitation. The two options to improve poor living conditions are reconstruction and remodeling. Compared to reconstruction, remodeling has advantages in terms of the construction period, cost, and environmental impact. As such, the current Korean regulations are more favorable for remodeling than reconstruction. Typically, several candidate floor plans are presented in the early stages of an apartment remodeling project. Extracting information about bearing walls and other structural elements from the multiple plans to compare those plans quantitatively is one of the essential tasks during the early stage of a project. To cope with this task, an automated data extraction method for walls and slabs from before and after remodeling plans is developed. Through the developed program, load-bearing walls, non-bearing walls, slabs, and weight changes after remodeling can be analyzed and visualized in a fast and automated manner.

  • PDF

Policy Direction in Responses to Demand for Apartment Remodeling (공동주택 리모델링 수요에 대응한 정책 추진방안)

  • Lee, Yeo-Kyung;Kim, Eun-Hee
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.36 no.1
    • /
    • pp.125-136
    • /
    • 2020
  • This study aims to seek a proper policy direction in response to the demand for apartment remodeling. As the research methods, we diagnosed the current status of the remodeling policy and analyzed the demand for apartment remodeling nationwide. According to the result of analysis, we suggested the fundamental direction and tasks for remodeling policies to be pursued at the government level. The results of the study are summarized as follows. First, the result of analysis showed that the demand for environmental improvement(performance improvement) remodeling project was much higher than other types of remodeling projects. The percentage of unit increased-type remodeling that can secure business feasibility is about 10% and only 30% when it comes to reducing project costs. The remaining 70-90% need to be promoted in environmental improvement remodeling projects which dependent on the residents' payment. Second, in order to prepare a policy action plan in response to the demand for apartment remodeling, it is necessary to set up clear policy goals and strategies for apartment remodeling in advance at the national level. Along with proactive goals and strategies, graded policy support should be accompanied per type of remodeling and business demand. We also suggest to simplify administrative procedures and support the R&D research to develop technologies. It would help to utilize the unit increased-type remodeling. On the other hand, for utilizing the environmental improvement remodeling which takes up a relatively high proportion, the policy should take care of as follows: offering housing performance information, rationalizing long term repair reserve, fostering small companies and experts. Finally, apartment management system should be advanced from the perspectives of managing old apartments and institutional foundations such as new construction and customized regulations for differentiated remodeling should be accompanied.

Correlation analysis of the quality and civil construction engineer in apartment house (공동주택 토목공사의 책임기술자와 품질의 상관관계 분석)

  • Jeong, Sangl-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.70-71
    • /
    • 2015
  • Construction period is longer than the non-disclosure in civil construction of apartment house. And this process is intensive at the beginning and end of construction. Because this project management expertise is required. Nevertheless, subsidiary work(Working avoid a tendency of advanced technician, Frequent turnover and employment contracts, etc.) management attention of construction is at a lower level. Because of, there are the bad factors(trial and error, finish degradation, etc.). Therefore, this study analyzed Hindrance Factor of quality control on apartment complex construction work and presented importance of civil construction engineer's role. Also, forms of civil construction engineer, Performance experience and technical Strength of apartment complex construction was investigated for the construction. To this end, It analyzes the relationship between forms of civil construction engineer, Performance experience and technical Strength of apartment complex construction and Construction of evaluation as required by Construction Technology Management Act.

  • PDF

A RESEARCH ON ECONOMIC AWARENESS AND REQUIREMENT OF DWELLERS TOWARD REMODELING OF APARTMENTS

  • Jea-Sauk Lee;Byung-Hyun Shin;Won Kwon;Chang-Hyun Shin;Jae-Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.469-479
    • /
    • 2007
  • This paper introduces the result of performing research analysis on awareness and demand on economic aspect of dwellers toward remodeling by aiming at the fact that there are existing dwellers which is the biggest feature of remodeling. Providing services that are suitable for economic conditions and demands of owners or dwellers of Apartment House could be seen as something that must be considered first above all things in remodeling in which consumers have to pay for expenses are specified.

  • PDF

A Study on the Feasibility Analysis for the Reconstruction Apartment Projects (아파트 재건축사업의 타당성분석절차에 관한 연구)

  • Lee Jae-Young;Jung Jung-Man;Kim Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.267-272
    • /
    • 2001
  • The purpose of this study is to suggest the process and calculating method of feasibility study for the reconstruction apartment projects, and the results of this study is fundamental knowledge for the exact and exquisite plan. The process of this study are as following : 1. Research for the process and peculiar character of reconstruction project. 2. Investigate input and output item and suggest the calculating methods that are generally accepted. 3. Suggest the general process on feasibility study for reconstruction apartment project.

  • PDF

Effects on the Housing Market by Supplying "New Stay" Apartments: Focused on the Two Areas, Michuhol-Gu, Incheon and Gwonseon-Gu, Suwon (뉴스테이 공급에 따른 주택시장 반응과 효과: 인천 미추홀구와 수원 권선구 지역에 관한 연구)

  • Koh, Young Chon;Shin, Jong Hwa
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.5
    • /
    • pp.433-442
    • /
    • 2021
  • This study analyzed the housing market before and after the New Stay movement which was introduced in 2015. In this study, the territories having a New Stay Project and non-involved territories were analyzed based on the apartment price changes according to supply for 12 months before and after the movement date. This study used the difference-in-differences statistical technique. A comparison was carried out in Michuhol-gu, Incheon between Dowha-dong where a New Stay Project was executed, and Sungeui-dong where no project was executed, based on the movement date. It was seen that the price level in the former territory was higher than the latter demonstrating that the introduction of the New Stay Project in Dowha-dong lowered the apartment prices nearby (Sungeui-dong). A comparison in Gwonseon-gu, Suwon between Omogcheon-dong where a New Stay Project was executed and Gosaek-dong where there was no such project, based on the movement date showed that the introduction of the New Stay Project in Omogcheon-dong seemed to lower or stabilize the apartment prices nearby (Gosaek-dong). These results imply that the apartment prices in nearby areas can be stabilized if the supply volume of company-type rental houses is increased.

Neural Network Model for Construction Cost Prediction of Apartment Projects in Vietnam

  • Luu, Van Truong;Kim, Soo-Yong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.139-147
    • /
    • 2009
  • Accurate construction cost estimation in the initial stage of building project plays a key role for project success and for mitigation of disputes. Total construction cost(TCC) estimation of apartment projects in Vietnam has become more important because those projects increasingly rise in quantity with the urbanization and population growth. This paper presents the application of artificial neural networks(ANNs) in estimating TCC of apartment projects. Ninety-one questionnaires were collected to identify input variables. Fourteen data sets of completed apartment projects were obtained and processed for training and generalizing the neural network(NN). MATLAB software was used to train the NN. A program was constructed using Visual C++ in order to apply the neural network to realistic projects. The results suggest that this model is reasonable in predicting TCCs for apartment projects and reinforce the reliability of using neural networks to cost models. Although the proposed model is not validated in a rigorous way, the ANN-based model may be useful for both practitioners and researchers. It facilitates systematic predictions in early phases of construction projects. Practitioners are more proactive in estimating construction costs and making consistent decisions in initial phases of apartment projects. Researchers should benefit from exploring insights into its implementation in the real world. The findings are useful not only to researchers and practitioners in the Vietnam Construction Industry(VCI) but also to participants in other developing countries in South East Asia. Since Korea has emerged as the first largest foreign investor in Vietnam, the results of this study may be also useful to participants in Korea.

The Success Factors of Scheduling Using the TACT Technique in Wall Type Apartment House Construction (벽식(壁式) 아파트의 택트공정(工程)계획의 성공요인 분석에 관(關)한 연구(硏究))

  • Kim Joon-Ho;Kim Gwang-Hee;Cho Hyung-Keun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.79-86
    • /
    • 2006
  • Recently, the construction companies show lots of interest in reducing the construction duration of apartment housing project in Korea. Therefore, the purpose of this study is to investigate the success factors of scheduling using the TACT technique in wall type apartment house construction for managing the construction schedule effectively. For appling the tact scheduling technique to wall type apartment house construction, the success factors can be summarized as follows : (1) zoning the horizontal and vortical work area properly, (2) preparing the flow chart of finishing works, (3) minimizing the undefined activity like chipping off the concrete wall, (4) reordering the construction activities for keeping up the continuity of works in winter season, (5) dividing the amount of work for minimizing the delay time of any activity, etc.

Comparative Analysis of Construction Management Index for Apartment Remodeling Project (공동주택 리모델링을 위한 공사관리 지표 비교분석)

  • Lee, Dong-Heon;Baek, Nak-Ku;Lim, Hyoung-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.191-192
    • /
    • 2017
  • After 1980's, as economy was rapidly grown and real estate market was active, greatly increased in population has been supplied to the city. Accordingly, national apartment house market is located in the form of Urban Housing Culture. However, as time goes by the apartment houses where the supply of mass became superannuated and residential environment became poor. So, the environment of old apartment houses has been changed to improve with reconstruction. It has been changed in response to the demands of the times. It is one of essential part in a remodeling field for the future although it has some problems in the way that uses existing buildings.

  • PDF

Analysing Construction Cost Index Fluctuation on Apartment Housing (공동주택 건설공사비지수의 변동추세 분석)

  • Park, Won-Young;Park, Tae-Il
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.226-227
    • /
    • 2019
  • The basic type construction cost which is the base of the building cost estimation is being adjusted according to the price changes by utilizing the apartment construction cost index in order to flexibly operate it. In this study, we analyzed the change trends and characteristics of the housing cost index for the basic type building cost model project operated from September, 2012 to March, 2018. As a result, the increase in material costs is slight while the share of the labor cost increased in the construction cost due to the rise of labor unit price, leading to a perceived increase in sensitivity of labor costs. We should be careful to keep the sensitivity of the material cost and the labor cost to an appropriate level so that the index may not be distorted.

  • PDF