• 제목/요약/키워드: apartment project

검색결과 339건 처리시간 0.023초

공동주택의 현장관리 인력 산출모형 연구 (A Calculation Model of Site Management Manpower for Apartment Building Construction Project)

  • 권기덕;김선국;원일우;주진규;이군재
    • KIEAE Journal
    • /
    • 제11권4호
    • /
    • pp.47-54
    • /
    • 2011
  • Construction companies find it increasingly necessary to reduce the cost as the construction market has been suffering from a depression and the industrial environment has been changing fast lately. The cost cut demands the productivity management of the field operations, which can be made feasible by assigning an appropriate number of managers on the construction site. However, previous studies are focused on the labor productivity and construction companies take into account only the revenue per worker in organizing the staff. The purpose of this study is to research the model for calculating the field management manpower in accordance with the characteristic of project and site conditions which are usually considered in the beginning of the construction project. The data about apartment building projects of domestic large constructors and factors related to them were statistically analyzed. The results of this study can be used to calculate the necessary field management manpower in accordance with the characteristic of project.

가족친화마을 환경조성을 위한 주민들의 아파트 내.외부 및 근린환경 선호에 관한 연구 - 대전시 아파트 거주자를 중심으로 - (A Study on Preferences for Apartment Interiors, Exteriors, and Neighborhood Environment for a Family Friendly Community Environment - Focused on Apartment Dwellers in Daejeon City-)

  • 차성란;이해욱
    • 가족자원경영과 정책
    • /
    • 제15권2호
    • /
    • pp.45-62
    • /
    • 2011
  • Since 2008, a communal child care and 'Family Pumasi' program have been conducted as a pilot project for the Healthy Family Support Center. These programs have been positioned as a step toward a family friendly community project. For the Healthy Family Support Centers, a family friendly community project is an essential program as a part of the policies in response to the country's low fertility. However, the people in charge face difficulties, because they do not have much experience in such projects. This study attempted to explore the preferences regarding interior and exterior apartment spaces, and neighborhood environment to provide information about how to better implement a family friendly community program. For this purpose, data were collected from 418 housewives who are apartment dwellers in Daejeon city. The results were as follows; first, the person in charge must consider child care facilities, culture, and sports centers in order to start building a community lifestyle. Second, people with relatively low levels of education and short terms of residence are more deeply motivated by community lifestyle compared to others. Third, families with their first young child showed much interest in communal child care facilities. If the people in charge can motivate and encourage such residents to be engaged in family friendly community projects, the project will effectively progress.

  • PDF

아파트 프로젝트의 초기 분양률 예측 회귀모델 (A Regression Model for Forecasting the Initial Sales Ratio of Apartment Building Projects)

  • 손승현;김도영;김선국
    • 한국건축시공학회지
    • /
    • 제19권5호
    • /
    • pp.439-448
    • /
    • 2019
  • 아파트 프로젝트는 사업성패에 영향을 미치는 요인은 매우 다양하다. 그러나 분양단가가 결정되고, 분양이 시작된 이후에는 사업에 가장 큰 영향을 미치는 요인은 분양 후 1개월간의 초기분양률이다. 일반적으로 사업주체는 경제상황, 주택시장의 동향, 사업지 인근의 주택가격 등 다양한 자료에 의해 초기분양률을 예측한다. 그러나 이러한 요인들을 초기분양률과 연계하여 정량적으로 계산하는 것은 매우 어렵다. 따라서 본 연구는 실제 수행된 아파트 프로젝트의 분양결과 자료를 이용하여 초기분양률 예측 회귀모델을 제안하는 것을 목적으로 한다. 본 연구를 위해 기존 분양실적자료 수집, 영향요인들의 상관관계 분석, 초기분양률 예측 회귀모델 작성을 진행한다. 본 연구의 결과는 아파트 프로젝트의 사업성 분석 시 초기 분양률 예측을 위한 기초자료로 활용되며, 사업 리스크 모델 개발의 핵심 자료로 활용된다.

공동주택 리모델링 사업관리를 위한 영향요인 분석 -시공단계를 중심으로- (An Analysis of Influence Factors for the Remodeling Project Management of Apartment Buildings -Focused on Construction Phase-)

  • 심규정;서종민;나영주;송용식;김선국
    • KIEAE Journal
    • /
    • 제8권5호
    • /
    • pp.77-83
    • /
    • 2008
  • Housing development, particularly apartment buildings, has been increasingly growing due to the construction promotion policy of the government since the 1980s. However such a volume-oriented policy results in unfavorable side effect of substandard quality and early deterioration in line with the expansion in volume. As part of measures to deal with the problems, rebuilding and remodeling have surfaced as alternative recently. Remodeling is expected to create the more benefits, compared to the rebuilding, in cost, efficiency and duration. To come up with the solution to such a challenge, it's necessary to analyze the influence factors of remodeling. Hence, the study was intended to compare the remodeling in the aspect of influence factors. The results of this study is expected to the propose of effectual management factors of the remodeling construction.

아파트 담장허물기 유형별 가로공간의 물리적 환경변화 및 이용특성 연구 (A Study on the Physical Environmental Alternations and the Using Characteristics of the Street Place by the Wall Removal Project Types)

  • 김묘정;정지석
    • 한국주거학회논문집
    • /
    • 제24권2호
    • /
    • pp.25-33
    • /
    • 2013
  • The purpose of this study was to compare the differences between two types of wall removal projects. One was the case that removed one side wall of the apartment in Daegu, another was the instance that eliminated the walls between two apartments in Gimcheon. For this study, the observation method was performed to know the using pattern on the street space, and survey including resident's opinion and satisfaction about result of the project was conducted to gather data. The total number of objects to analysis was 157. The conclusion of this study is as follows. First, when the space was secure from danger of cars, people could access easily. And when it had interesting elements, the street space after wall removal was used by residents. Second, the effective method to connect places was to make intermediate space after wall removal project. In this sense, the way can help to improve the level of quality the daily life of residents. Finally, in the apartment-oriented wall removal project, it could supplement the flaw of the detached house-oriented project and effective potentiality for vitalization of community.

퍼지추론 기반 멀티 에이전트를 통한 리모델링 사업 전 추진단계에서의 갈등관리 (Conflict Management in Planning phase of Remodeling Project through Multi-Agent based on Fuzzy Inference.)

  • 박지은;유정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.202-203
    • /
    • 2015
  • To promote the remodeling project it is important to get apartment residents' consent. It is significant variable to determine project to progress smoothly from planning stage which committee of association establishment sets up to establishment stage of association. On average, it takes about 1~1.6 year in planning phase which means before construction phase of remodeling. Therefore, it is very important issue to get apartment residents' consent in planning phase. In this research, we focused on residents' opinion and proposed solution of conflict with gathering residents' opinion to proceed remodeling project. By setting particular remodeling situation, related residents represented as agents made effort to efficient coordination to reduce total duration of decision making. Therefore, we proposed multi-agent based on fuzzy inference to simulate behavior of decision making on remodeling project effectively. From this method, optimal alternative is selected by considering each agents' attributes which represented by fuzzy set. This research will develope to further research for realizing concrete multi-agent based on fuzzy inference considering all stakeholders in remodeling project.

  • PDF

공정-공사비 통합 프로세스 개선을 통한 대단지 아파트 건설공사의 계획기성 산출 및 관리 (A Study on the Process Improvement of Budgeted Cost of Earned Value Management in Multiple Apartment Project)

  • 양용철;김상희;김재준
    • 한국건설관리학회논문집
    • /
    • 제4권4호
    • /
    • pp.123-136
    • /
    • 2003
  • 아파트 공사에서 계획기성은 전체 사업단계에 걸쳐 공사기간 산정, 중도금 납부일정, 사업손익분석, 기성지급, 계획대비 실적비교 관리 등에 활용되므로, 다수 사업 참여자간의 이해와 사업의 성공에 지속적으로 영향을 미치는 핵심적인 관리요소이다. 그러나 대단지 아파트 공사에서는 다수건물 동시 시공으로 인한 공정 액티비티 과다발생으로 인하여 공정표를 작성하고 자원을 분개하여 계획기성을 정확하게 산출하는데 어려움을 겪고 있는 실정이다 본 연구에서는 실태조사를 통하여 기존의 문제점과 원인을 파악하고 계획기성 산출의 프로세스를 개선을 통하여 계획기성을 신속$\cdot$정확$\cdot$체계적으로 산출하기 위한 개선방향을 제시한다.

대단지 아파트 건설공사의 계획기성 관리실태에 관한 연구 (A Study on the Actual Condition and Development of BCWS Management In Large Apartment Complex Project)

  • 김상희;양용철;김재준
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.434-437
    • /
    • 2003
  • 아파트 공사에서 계획기성은 영업부티 시공단계에 걸쳐 공사기간, 분양가 산정, 중도금 납부시점 결정, 인허가 관련, 기성지급 기준, 계획대비 실직비교 관리 등에 활용되므로, 다수 사업 참여자간의 이해 및 프로젝트의 성공에 지속적으로 영향을 미치는 핵심적인 관리요소이다. 그러나 대단지 아파트 공사의 특징인 다수 건물 동시 시공으로 인한 공정 액티비티 과다발생으로 인하여 공정표를 상세하고 작성하고 자원을 분개하여 계획기성을 정확하게 산출하고 관리하는데 어려움을 겪고 있는 실정이다. 본 연구에서는 실태조사를 통하여 계획기성 산출과 관리에 관한 문제점을 분석하고 그 원인을 파악함으로써 계획기성을 체계적으로 산출하기 위한 향후 개선방향을 제시하고자 한다.

  • PDF

공동주택 마감공사 중요도 기반 작업지연 요인 분석 (Delay Factors Based on the Importance of Finish Work in Apartment Construction Project)

  • 이승훈;이상효;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.125-129
    • /
    • 2010
  • The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.

  • PDF